SuperB RF and Other Components

Slides:



Advertisements
Similar presentations
Accelerator Plans at SLAC John T. Seeman For the PEP-II Team e + e - Super-B-Factory Workshop Hawaii, USA January 19, 2004.
Advertisements

February 7, 2007-Beijing (Zisman-DR) Global Design Effort 1 Damping Ring EDR Plans Michael S. Zisman, Jie Gao, Susanna Guiducci, Andy Wolski DR Area System.
Vacuum System Elements for BESSY II Vacuum Equipment All vacuum elements are produced at BINP in accordance to the European standards and satisfy the.
PEP- II Linac Accelerator Systems Department The PEP-II B-Factory Accelerator John T. Seeman Assistant Director Particle and Particle-Astrophysics Division.
SuperB Damping Rings M. Biagini, LNF-INFN P. Raimondi, SLAC/INFN A. Wolski, Cockroft Institute, UK SuperB III Workshop, SLAC, June 2006.
PEP-II B Factory Machine Status and Upgrades John T. Seeman for the PEP-II Staff SLAC DOE Site Review April 9, 2003.
1 Super-B Factory Scenarios John Seeman Assistant Director PPA Directorate SLAC SLUO Meeting September 11, 2006.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
Page 1 PEP-II D&D Planning & Costing Exercises John Seeman Accelerator Systems Division SLAC National Accelerator Laboratory.
PEP-II and BaBar DND Review M. Sullivan Mar 23-24, 2009Page 1 PEP-II Overview and MMS Status Michael Sullivan SLAC National Accelerator Laboratory.
Issues for Optimization of a Super-B Factory John T. Seeman SBF Workshop SLAC June 14, 2006.
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
PEP-II Overview & Ramp Down Plan J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
SLAC Accelerator Department The PEP-II Accelerator Status and General Plans John T. Seeman Assistant Director of the Technical Division Head of the Accelerator.
SLAC Accelerator Department PEP-II Future Plans and Parameters John T. Seeman PEP-II MAC Meeting December 13, 2004.
CLIC Kickers: Status and activities for 2013 in view of the budget discussions for 2013 CTC #65 M.J. Barnes CLIC Technical Committee, November M.J.
Future Very High Luminosity Options for PEP-II John T. Seeman For the PEP-II Team e+e- Factories Workshop October 13-16, 2003.
Material Disposition Planning Olga Ligeti Radiation Protection Department MARCH 24, 2009.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
July 7, 2008SLAC Annual Program ReviewPage 1 PEP-II in Run 7 and Transition Planning John T. Seeman Assistant Director PPA/LCLS.
1 Franz-Josef Decker 1 Multi-Bunch Operation for LCLS Franz-Josef Decker March 17, Definitions and goals multi-bunch within.
B Factory D&D Review: March 23, 2009 Page 1 Overview of re-use requests and related issues D. MacFarlane Deputy Director, PPA.
D&D Review 6 August PEP-II Minimal Maintenance State Upkeep Stan Ecklund (J. Seeman, S. DeBarger, D. Kharakh, M. Zurawel)
2 nd workshop on SuperB 17.03,2006 LNF Marcello A Giorgi1 Marcello A. Giorgi Università di Pisa and INFN Pisa Closeout Remarks 2nd Workshop on SuperB FRASCATI.
Introduction of Accelerators for Circular Colliders 高亮度 TAU-CHARM 工厂 & 先进光源, 2014/09.
Cost Evaluation of Storage Ring Magnets Claudio Sanelli March 19, 2012.
LFB, LLRF, TFB Alessandro Drago Annecy, March 2010.
TDR and R&D Plans J. Seeman and M. Biagini For Super-B Staff.
Injection System Update S. Guiducci (LNF) XVII SuperB Workshop La Biodola, Isola d'Elba, May 29 th 5/29/111.
Synchrotron Radiation Absorption and Vacuum Issues in the IR at PEP-II and a Higgs Factory John Seeman, SLAC October 11, 2014 HF2014 Beijing.
Mini MAC II PEP-II hardware M. Sullivan Apr 23-24, 2009Page 1 PEP-II Hardware Status M. Sullivan SLAC National Accelerator Laboratory Mini-MAC II Frascati,
PEP- II Linac Accelerator Systems Department Status and Plans for PEP-II John Seeman SLAC Particle and Particle-Astrophysics DOE HEPAP P5 Review April.
ELENA installation progress F. Butin / ELENA collaboration.
November 12-13, 2007 Super-B Factory: Accelerator Costing, PEP-II Hardware and Schedule J. Seeman SLAC International Review Committee meeting November.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
PEP-II Status John Seeman SLAC Particle and Particle-Astrophysics
Positron Sources of Next generation B-factories (SuperKEKB, SuperB)
John T. Seeman DOE PEP-II Operations Review April 26, 2006
INJECTION SYSTEM UPDATE
CesrTA Status Report Mark Palmer July 8, 2009.
Accelerator R&D for the Super-B Factory
SuperB Injection, RF stations, Vibration and Operations
Michael Sullivan and John Seeman SLAC National Accelerator Laboratory
Status Report on the Alignment Activities at SLAC
Top-Up Injection for PEP-II and Applications to a Higgs Factory
Thermal emittance measurement Gun Spectrometer
Potential Use of PEP-II Magnets by Project X
Injector Performance Requirements Conventional Facilities Update
SuperB project. Injection scheme design status
Super-B Overview John Seeman Accelerator Systems Division
The first shipment of SPEAR3 magnets (9 dipoles and 12 quadrupoles) arrived April 3. The second shipment (3 dipoles, 7 quadrupoles, and 6 sextupoles)
PEP-II RF System Status and Upgrades
PEP-II Status and Plans e+e- Factories Workshop
Sector 0 RF System Installation of components (Master Amplifier and PEP Phase Shifter) in October down time. Testing and commissioning during October.
XII SuperB Project Workshop LAPP, Annecy, France, March 16-19, 2010
LERF Cryomodule Testing Facility – Accelerator Systems Deliverable
Accelerator R&D Results from the B-factory
J. Seeman Assistant Director for PPA/LCLS
AC Power for a Super-B Factory
Summary of Washington DOE Review
Super-B Accelerator Overview
Coherent Synchrotron Radiation Study
SuperB IRC Meeting Frascati, Nov. 13th 2007
Super-B Factory in a “4400m” Tunnel
Polarization at the Super-B Factory
LCLS Injector Configuration
Cost Algorithm for a Super-B Factory
J. Seeman Perugia Super-B Meeting June 2009
Electron Collider Ring Magnets Preliminary Summary
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
Presentation transcript:

SuperB RF and Other Components John Seeman SLAC Annecy SuperB Workshop March 16-19, 2010 Annecy SuperB Workshop

Annecy SuperB Workshop

Annecy SuperB Workshop Update LCLS has received all their power supplies. FACET has requested a few additional power supplies. IHEP (Beijing) has received their two longitudinal kickers. FNAL (Project X) will likely not take the dipoles but may take some quadrupoles and supports. Need to update the SuperB request for PEP parts. Annecy SuperB Workshop

Annecy SuperB Workshop PEP-II Arc Section LER PEP-II ring HER Annecy SuperB Workshop 4

Annecy SuperB Workshop B-Factory RF Klystrons C. Pearson Annecy SuperB Workshop 5

Annecy SuperB Workshop PEP-II RF Cavities PEP-II LER RF Annecy SuperB Workshop 6

PEP-II Klystron High Voltage Power Supplies (15 total) Annecy SuperB Workshop 7

PEP-II Klystron Building Annecy SuperB Workshop 8

Annecy SuperB Workshop PEP-II Power Supplies Annecy SuperB Workshop 9

Annecy SuperB Workshop PEP-II dipoles in storage Annecy SuperB Workshop 10

Annecy SuperB Workshop

Annecy SuperB Workshop Conclusions SuperB will ask for all RF components (15 stations). (SPEAR-3 has asked for some spares.) SuperB will need fewer HER dipoles but more LER dipoles. Need to clarify other components to look for needed items (diagnostics, vacuum parts, power supplies, supports, …) Specifically, need to look at vacuum chambers to see which ones can be reused. With the LER dipoles being used, the existing chambers are perhaps a good choice. Annecy SuperB Workshop