SuperB RF and Other Components John Seeman SLAC Annecy SuperB Workshop March 16-19, 2010 Annecy SuperB Workshop
Annecy SuperB Workshop
Annecy SuperB Workshop Update LCLS has received all their power supplies. FACET has requested a few additional power supplies. IHEP (Beijing) has received their two longitudinal kickers. FNAL (Project X) will likely not take the dipoles but may take some quadrupoles and supports. Need to update the SuperB request for PEP parts. Annecy SuperB Workshop
Annecy SuperB Workshop PEP-II Arc Section LER PEP-II ring HER Annecy SuperB Workshop 4
Annecy SuperB Workshop B-Factory RF Klystrons C. Pearson Annecy SuperB Workshop 5
Annecy SuperB Workshop PEP-II RF Cavities PEP-II LER RF Annecy SuperB Workshop 6
PEP-II Klystron High Voltage Power Supplies (15 total) Annecy SuperB Workshop 7
PEP-II Klystron Building Annecy SuperB Workshop 8
Annecy SuperB Workshop PEP-II Power Supplies Annecy SuperB Workshop 9
Annecy SuperB Workshop PEP-II dipoles in storage Annecy SuperB Workshop 10
Annecy SuperB Workshop
Annecy SuperB Workshop Conclusions SuperB will ask for all RF components (15 stations). (SPEAR-3 has asked for some spares.) SuperB will need fewer HER dipoles but more LER dipoles. Need to clarify other components to look for needed items (diagnostics, vacuum parts, power supplies, supports, …) Specifically, need to look at vacuum chambers to see which ones can be reused. With the LER dipoles being used, the existing chambers are perhaps a good choice. Annecy SuperB Workshop