Jim Aloise System Programmer

Slides:



Advertisements
Similar presentations
2014 Workshop on Spacecraft Flight Software 1 Pasadena, CA, December 16-18, 2014 ICON End-To-End Operations Philosophy Will Marchant, Manfred Bester, Carl.
Advertisements

STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center Phase E Kickoff Meeting February 23, 2007.
HMI - Page 1HMI Team Meeting – Jan 26, 2005 JSOC Implementation HMI Team Meeting 26 Jan 2005 Jim Aloise System Programmer
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
JSOC Overview - 1HMI/AIA Team Meeting – Feb 2006 JSOC Summary- Phil Scherrer Pipeline Processing - Rasmus Larsen Data Access - Rick Bogart Data Visualization.
CXC Chandra X-ray Observatory Operations. CXC Overview 1. Mission and Observatory Description 2. Chandra Operations 3. Chandra X-ray Center Architecture.
Software for Spacecraft What do spacecraft need to do when they’re 1 million miles from home?
GLAST LAT ProjectISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.1 Requirements 1 Gamma-ray Large Area Space Telescope GLAST Large.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Scott Williams 1 GLAST Large Area Telescope: Instrument Operations Center Scott.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
Section 15-1GLAST Ground System Design Review August 18&19, 2004 ISOC Organization ISOC Manager R Cameron Commanding, H&S Timeline Planning Command Generation.
Page 1HMI Team Meeting – January 26, 2005 HMI Mission Operations Rock Bush HMI Stanford Program Manager Stanford University
JPL Autonomous Space Mission Simulation Flight Team Bob Hoffman Josh Ruggiero Adam Nikolic Dusty Terrill.
GLAST LAT Offline SoftwareWorkshop - SLAC, Jan , 2001 R.Dubois Lehman Review Feb Joint NASA/DoE review My understanding: –“The purpose of the.
Exemplar CFS Architecture
SwRR 4/28/ Telecon MAVEN Particles and Fields Flight Software Requirements Review SwRR Peter R. Harvey April 28, 2010.
DMS Systems Design Review 3
MASSACHUSETTS INSTITUTE OF TECHNOLOGY NASA GODDARD SPACE FLIGHT CENTER ORBITAL SCIENCES CORPORATION NASA AMES RESEARCH CENTER SPACE TELESCOPE SCIENCE INSTITUTE.
Aquarius Project Status 7 th Aquarius/SAC-D Science Team Meeting 11 April 2012.
SECCHI Consortium Meeting, July 2001 SECCHI Ground Data Systems and Data Processing Nathan Rich NRL/Interferometrics
1 SpaceOps 2002 Autonomous Operations For The Swift Mission T3-47 John Ong/Swift Software Systems Manager NASA/GSFC Code 582/ Mike Rackley/Swift.
Solar Probe Plus A NASA Mission to Touch the Sun End to End Test Agenda April 24, 2014 Elena Adams SPP Payload Systems Engineer.
GLAST LAT ProjectEGSE Peer Design Review, August 17, S. WilliamsEGSE Overview Electrical Ground Support Equipment Overview Scott Williams Stanford.
06/30/ Data Product Service (DPS) Packaging and Context Dan Crichton Steve Hughes Ron Joyner Chris Mattman Paul Ramirez Peter Shames.
Page 1GS CDR May 2005 JSOC SDP Agenda Significant Level 4 requirements SDP Architecture Decomposition –Datacapture System –Datacapture System Components.
Space Operations as a Guide for a Real-World Scheduling Competition Eduardo Romero Marcelo Oglietti
Page 1JSOC Peer Review 17Mar2005 HMI & AIA JSOC Architecture Science Team Forecast Centers EPO Public Catalog Primary Archive HMI & AIA Operations House-
Overview of SOIS Electronic Data Sheets (EDS) & Dictionary of Terms (DoT) SOIS APP WG Fall 2012.
Page 1JSOC Peer Review 17Mar2005 HMI & AIA JSOC Architecture Science Team Forecast Centers EPO Public Catalog Primary Archive HMI & AIA Operations House-
NASA’s Goddard Space Flight Center Lunar Reconnaissance Orbiter Ground System Requirements.
1/15/02Bowman/Harch1 CONTOUR Science Ops Update Ann Harch Cornell University (607) Alice Bowman Applied Physics.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Aquarius Mission Simulation A realistic simulation is essential for mission readiness preparations This requires the ability to produce realistic data,
Solar Probe Plus A NASA Mission to Touch the Sun Mission Operations Review News Elena Adams 7/16/2015.
LAT ISOCISOC Review, 15 February GLAST Large Area Telescope Instrument Science Operations Center Commanding, Health and Safety Rob Cameron Stanford.
Solar System Division DVK, 10 Jul 2001 Rosetta Science Operations Experimenter to RSOC interfaces Detlef Koschny Space Science Department ESA/ESTEC
Requirements to WSO Ground Segment Lavochkin Association & ROSCOSMOS 30/06/2006.
SSC Support for Sim #3 Archived MOC Data Products, and distributed via web. –Level-0 telemetry files organized by year and month –SPICE orbit and attitude.
MOIMS MO & Nav Functions, Services & Interfaces CCSDS Ref Arch Discussion 20 Oct 2015.
GLAST Science Support CenterAugust 10, 2004 Users’ Committee Meeting The Project Data Management Plan David Band – GSSC.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
GLAST Large Area Telescope – ISOC Overview and StatusDOE Annual Review, 13 June GLAST Large Area Telescope Instrument Science Operations Center.
Ground Control AERSP 401A. Ground System’s Basic Elements Mission Elements –Control the space segment or handle mission data, and includes: Ground Stations.
The road to the first E2E tests
JSOC Status at SDO PSR-1 January 21-22, 2009 GSFC
Code Generation from SEDS
Exemplar CFS Architecture
Overview of SOIS Electronic Data Sheets (EDS) & Dictionary of Terms (DoT) SOIS APP WG Fall 2012.
I&T&C Organization Chart
Rosetta Science Ground Segment Overview
Solar Probe Plus FIELDS
Detlef Koschny Research and Scientific Support Department ESA/ESTEC
GLAST Large Area Telescope:
Solar Orbiter Instrument Testing by MOC-SOC
SDO Science Operations Working Group Meeting (SOWG #1) October, 2004 Bldg 14 Room E280 Goddard Space Flight Center Greenbelt, MD.
JPL Autonomous Space Mission Simulation
Current SOC-Ground System Integration Schedule (Jan )
SDO Ground System Test Readiness Review
HMI/AIA Joint Science Operations Center (JSOC) Design
Electrical Ground Support Equipment Verification Test Support
Ground Segment for WSO/UV
JDAT Production Hardware
GSRT Critical Design Peer Review
GLAST Large Area Telescope
Launch and On-orbit Checkout
Science Data Capture Jim Aloise Nov , 2004 System Programmer
HMI – AIA Joint Science Operations Center “Peer” Overview, 17 March AM HEPL Conference Room, Stanford Overview of JSOC Parts (Phil, 5 min.) JSOC.
HMI Top Level Requirements
LAT Operations Scenario Subsystem Meetings
Integration & Test Instrument Operations Coordination
Presentation transcript:

Jim Aloise System Programmer jim@quake.stanford.edu HMI00433 HMI Ground Data System Jim Aloise System Programmer jim@quake.stanford.edu

Ground Data System – Agenda Review of Driving Requirements Design Presentation Schedule Highlights

Driving Requirements (From "Detailed Mission Requirements for the SDO") The DDS (Data Distribution System) shall forward captured science data files from each instrument directly to each instruments SOC (Science Operations Center). The SOCs are responsible for the long-term science archive. Ancillary data shall be exchanged between the DDS and SOCs to provide data quality information, track the status of file transmissions and permit requests for retransmissions as needed. The MOC (Mission Operation Center) will be responsible for forwarding instrument health and safety telemetry to the respective science teams. Instrument command information will be forwarded by the respective SOCs to the MOC for uplink to the observatory.

DDS/MOC/SOC Data Flow

SOC Data Exchange

DDS/SOC Data Exchange

DDS/SOC Simulation

HMI SOC Dataflow

HMI Data Archive

I/O Budget

Ground Data System H/W Architecture

S/W Architecture Heritage

Schedule Highlights EGSE Integration & Test 10/04 Production System Integration & Test 11/07