Automatic Voice Frequency Test Sequences of ELQ 30A+

Slides:



Advertisements
Similar presentations
ELQ 30 Preprogrammed VDSL-2 Band Plans
Advertisements

Trouble Shooting with ELQ 30 CROSSTALK BRIDGED TAPS INTERRUPTION UNBALANCE Typical Cable Problems ELEKTR NIKA To learn more click on the selected topic!
ELEKTR NIKA Upstream Power Back Off (UPBO) The Problem is: Upstream bit rates on long loops are dramatically reduced. Very high-speed digital subscriber.
ELEKTR NIKA VDSL 2 Vectoring The Problem: The bit rate of VDSL2 lines is limited by the crosstalk noise. Typical a cable bundle comprises several tens.
Application Notes for Line Testing with ET 91 To learn more click on note! Single Sided Measurements END to END Measurements LCL Balance Impedance Return.
To learn more click on the selected method! Typical Cable Faults Unbalance Recommended Fault Location Method Disturbing voltage ▼ Murray ▼ Küpmüller ▼
The MLLN is a Managed Leased Line Network system which provides variable bandwidth leased line connectivity. The State-of-the art technology equipment.
Automatic xDSL Test Sequences of ELQ 30A
Application Notes for Frequency Division Multiplex System Testing with ET 91 To learn more click on note! Basic, Super & Master Group Voice Frequency Noise.
ELEKTR NIKA To learn more click on the selected topic! Manual End to End Measuring Modes of ELQ 30A ► ► ► ► ► ► Loss Measurement with MTTS Group Delay.
Automatic Single Sided Test Sequence of ELQ 30A To learn more click on the selected topic! ELQ 30A provides single sided test sequences to estimate the.
FREQUENCY CONTROL MODES OF ET 91 To learn more click on note! END to END Loss Measurement Group Delay Distortion Measurement Frequency Tracking with Sweep.
FREQUENCY CONTROL MODES OF ET 92 To learn more click on note! END to END Loss Measurement Group Delay Distortion Measurement Frequency Tracking with Sweep.
Trouble Shooting with EFL 10 Insulation Faults Flooded cable R b ≠ R aC b ≠ C a Typical Cable Problems Which one is the Proper Fault Location Method ?
Single Ended Measuring Modes of ELQ 30A To learn more click on the selected topic! ELEKTR NIKA Receiving Modes Impulse Noise Measurement Spectrum Analyzer.
Title Slide Title Circle K at [insert University name] [Date]
Automatic Voice Frequency Test Sequences of ELQ 30A To learn more click on the selected topic! The Automatic Master-Slave Measuring mode is intended for.
Which one is the Proper Fault Location Method ?
WAN Transmission Media
Single Ended Line Test with Upgraded ECFL 30
XDSL Line Tester Modem EX 30M ELEKTR NIKA EX 30M is a handheld, cost-effective test set to check DSL services and the copper cable capability. It is a.
PLC Testing with ET 91 Level Test Set To learn more click on note! Pilot Level Measurement on RF Test Point Measurements in Special Tracking Mode Pilot.
Frequency Division Multiplex System Testing with ET 92 To learn more click on note! Basic, Super & Master Group Voice Frequency Noise END to END Measurements.
Downstream Power Back Off (DPBO)
Manual Measuring Modes of ELA 10 To learn more click on the selected topic! Level, Loss Noise, Spectrum Line Parameter Optional Measurements Transmitting.
FREQUENCY CONTROL MODES OF ET 91 To learn more click on note! END to END Loss Measurement Group Delay Distortion Measurement Conventional Setting Modes.
JUMP Mode – A Dynamic Window-based Scheduling Framework for Bluetooth Scatternets Niklas Johansson, Fredrik Alriksson, Ulf J ö nsson ACM 2001 CNF.
Presented by Khaled Al Otaishan
GSM Controlled Robots.
Single Ended Measuring Modes of ELQ 30A+
DS200 EEPROM PROGRAMMING.
Circuit Switching and Telephone Network
To learn more click on the selected system!
VDSL 2 Vectoring ELEKTR NIKA
Manual End to End Measuring Modes of ELQ 30A+
Trouble Shooting with EFL 10
Automatic xDSL Test Sequences of ELQ 30A+
Chapter 3 Switching.
Trouble Shooting with ELQ 35
DIGITAL ELECTRONICS ТHEME 4: SEQUENTIAL LOGIC CIRCUITS. FLIP- FLOPS – ASYNCHRONOUS AND SYNCHRONOUS, R - S, D, T, J - K FLIP- FLOPS. The value of the outputs.
William Stallings Data and Computer Communications
Single Ended Line Test with Upgraded ECFL 30
Telephone & Exchange Tester ETET 30
xDSL Line Tester Modem EX 30M
دانشگاه شهیدرجایی تهران
Telephone & Exchange Tester ETET 30
ANEEL ABBASI MUHAMMAD ADNAN MOIZ SHAH MUHAMMAD KHAYAM GROUP MEMBERS.
Trouble Shooting with ELQ 30
VDSL 2 Vectoring ELEKTR NIKA
تعهدات مشتری در کنوانسیون بیع بین المللی
Which one is the Proper Fault Location Method ?
Which one is the Proper Fault Location Method ?
Downstream Power Back Off (DPBO)
BLUETOOTH Personal Area Networking [ PAN ] over Bluetooth
xDSL Line Tester Modem EX 30M
Downstream Power Back Off (DPBO)
Single Ended Line Test with Upgraded ECFL 30
xDSL Line Tester Modem EX 30M
Automatic Single Sided Test Sequence of ELQ 30A+
Revising you Persuasive Speech
Manual Measuring Modes of ELA 10
Manual Measuring Modes of ELA 10
VDSL 2 Vectoring ELEKTR NIKA
Automatic Test Sequences in Master-Slave Mode
Upstream Power Back Off (UPBO)
Automatic Test Sequences in Master-Slave Mode
Trouble Shooting with ELQ 30A+
Upstream Power Back Off (UPBO)
KX-NS1000 Step by Step Guide Network Survivability
Presentation transcript:

Automatic Voice Frequency Test Sequences of ELQ 30A+ The Automatic Master-Slave Measuring mode is intended for the qualification of leased and dial-up voice frequency circuits. Two ELQ 30A+ connected to the ends of the tested line communicate over the tested line. ■ The Master initializes the measurements and collects the results. ■ The Slave performs the measurements according to the Master’s commands and sends the results back. Pre-programmed test parameter sets are provided based on recommendations: ■ ITU-T M.1020 special quality leased circuits with special bandwidth conditioning ■ ITU-T M.1025 special quality leased circuits with basic bandwidth conditioning ■ ITU-T M.1040 ordinary quality leased circuits Using pre-programmed test parameter sets ELQ 30A+ provides immediate PASS/FAIL qualification and detailed information about the reasons of failure. Passive Leased Circuits Active Leased Circuits Dial-up (Switched) Circuits ITU-T Rec. for Passive Circuits ITU-T Rec. for Active Circuits To learn more click on the selected topic! ELEKTR NIKA

Qualification of Passive Leased Circuits (Cables) ELQ 30A+ Selected system ELQ 30A+ ELQ 30A+ Selected tests Short form test result Notice: ■ The duration of EVENT test is 30 min therefore it is recommended only for trouble shooting ! Detailed Results ELEKTR NIKA

Detailed Results of Passive Leased Circuit Test ELEKTR NIKA

Qualification of Active Leased Circuits Selected system Selected tests Short form test result Notices: ■ The duration of EVENT test is 30 min therefore it is recommended only for trouble shooting ! ■ The receiver delay should only be defined in case of extremely long lines Detailed Results ELEKTR NIKA

Detailed Results of Active Leased Circuit Test ELEKTR NIKA

Qualification of Dial-up (Switched ) Circuits Click here for details ELEKTR NIKA

Qualification of Dial-up (Switched ) Circuits Setting the phone number of slave Selected system Selected tests Short form test result Notices: ■ The duration of EVENT test is 30 min therefore it is recommended only for trouble shooting ! ■ The receiver delay should only be defined in case of extremely long lines Detailed Results ELEKTR NIKA

Detailed Results of Switched Circuit Test ELEKTR NIKA

ITU-T Recommendations for Passive Circuits Special quality circuits with special bandwidth conditioning Special quality circuits with basic bandwidth conditioning Ordinary quality circuits Not specified ELEKTR NIKA

ITU-T Recommendations for Active Circuits Special quality circuits with special bandwidth conditioning Special quality circuits with basic bandwidth conditioning Ordinary quality circuits Not specified ELEKTR NIKA

THANK YOU FOR YOUR ATTENTION!