Activity 4.2.8d Satellite Flight Path Construction Guide

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

Unit 8 Fastening Systems
BUILDING TRADES: BUILDING BASIC CABINETS Copyright © Texas Education Agency, All rights reserved.
Michael Long– Eagle Project - Exhibit D-1 Plans/Drawings – Top View
Engineering Drawing Lecture 3
Environmental Drilling By: Josh Humphreys October 8,2006.
Team Uno 11/11/04 Bunker Curnes Product Assembly.
CONSTRUCTION OF A “LITTLE FREE LIBRARY” Gary Mehlum, pressed into service by wife and UHLS employee Mary Fellows (“When you marry a librarian, you marry.
Tools English for Careers Class. tool belt A tool belt is used to hold tools on your body.
Typical Walk-in Closet with elfa® décor
Trim Fwd Spar End Brackets July 6, H2-2, Horizontal Stab Rear Spar 7H1-2, Stab Full Rib Corner of Forward.
Cooling Business Group 1 INSTALLATION Directions.
Fabrication of Fishtank Platform EAS 199B living with the lab.
Old Main Group. Design Issues There are no changes to the overall Design It will remain the way it is The Attachment Issue is resolved Going to screw.
A Left Tab stop sets the start position of text that will then run to the right as you type A Center Tab stop sets the position.
Handy Store Fixtures Gondola Dolly Assembly Instructions
Construction Basics Part 1: Framing the house..
Unit 53 Metalwork Technology and Practice
Boring MEEG 217 Suraj Pandey. Introduction One of the most versatile machine tools; used to bore holes in large and heavy parts as engine frames, machine.
PRECISION INSTRUMENTS EXPLAINED
RSIC-1 INSTALLATION STEEL FRAMED WALL ©2008 Cascade Audio Engineering, Inc. All Rights Reserved. (541) Fax (541) RSIC® is a registered.
Step one: Page Border and title block. Border will be ¼” from the edge of the paper. Drawing will be done in landscape format. Title block will be 1”
CPA Micarta Based Rahul Sharma / Bill Sands. The present design shown in this document is based on the use of Micarta as the base material this will likely.
RSIC-1 INSTALLATION STEEL FRAMED WALL ©2008 PAC International, Inc. All Rights Reserved. (866) Fax (866) RSIC® is a registered Trade.
EXAMPLE 1 Add polynomials vertically and horizontally a. Add 2x 3 – 5x 2 + 3x – 9 and x 3 + 6x in a vertical format. SOLUTION a. 2x 3 – 5x 2 + 3x.
Building controller with joystick and buttons. put joystick together (keep things in order below)
Potting Bench Plans Matt Howell Brooks County High School ___, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Courtesy Eric Witherspoon, Sonex plans #815 Photo 1: What it is. Photo 2: How it works. Sonex Wing Stand Answer to photos 3 and 4: Want leading.
Potting Bench Plans Matt Howell Brooks County High School Quitman, Georgia Quitman, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Rotating Compost Barrel Construction
VIEW SERIES with Sliding Door
Installation Walkthrough Image Guide
Activity 4.2.8a Satellite Flight Satellite Robot Construction Guide
Common Components of a Traditional Wood Framed Building
Solid Cylinder cut at an angle
Lathe IX – Taper Calculations and Machining
Objectives Describe the fasteners, anchors, and adhesives used in construction and explain their uses. a. Identify various types of nails and cite uses.
Tables:.
Activity 1.2.5a Mechanical Efficiency Winch Construction Guide
Step-by-step assembly instructions
Balsa Glider Construction
Step-by-step assembly instructions
Activity 2.2.1a Action Reaction Construction Guide
CHAPTER 6 Tools and Equipment.
These are only the basic instructions to build the stand.
Louisiana Tech University
Flag Installation on Roll-up Signs
Required tools for installation of a V-1020C Speaker with V-9914M-5 Metal Bridge.
Mounting a BalanceBox®650 to a brick wall
Flag Installation on Roll-up Signs
Additional Upstream Coil Shielding
Activity 1.2.5a Mechanical Efficiency Winch Construction Guide
Horizontal Centering Using the menu bar
Step-by-step assembly instructions
Creating a grid by Carl Dellutri.
Step-by-Step Assembly Instructions – Cube Version
Activity 4.2.8a Satellite Flight Satellite Robot Construction Guide
Moving Pictures Sliders and Levers.
Friction.
Common Components of a Traditional Wood Framed Building
SUPPORT FRAME ASSEMBLIES, 4 REQUIRED
Cross section It is supposed a hill has been cut vertically, then we can see the side view, or cross section of the hill A section is a slice vertically.
Required tools for installation of a V-1020C speaker with V-9914 bridge.
Activity 1.2.3a Airfoil Construction Guide.
Step-by-step assembly instructions
Aery Glider Design Aerospace Engineering
Balsa Glider Construction
Step-by-step assembly instructions
Warm Up The function below shows the cost of a hamburger with different numbers of toppings (t): f(t) = t a. What is the y-intercept, and.
Omega Selection Center
Presentation transcript:

Activity 4.2.8d Satellite Flight Path Construction Guide Aerospace Engineering © 2011 Project Lead The Way, Inc.

Equipment 1 in. x 2 in. x 8 ft furring strips (2) 1 in. screws (4) 2 in. L-brackets with screws (2) Drill Drill bits Drill fastener bits

Step 1: Cut and Assemble Path Supports Mark line 2 in. from end to align top of path Step 3: Mark center line Step 2: Mark center line 1 in. x 2 in. x 24 in. furring strip 1 in. x 2 in. x 22 in. furring strip 1 in. screws (2) 1 in. screws (2) Step 4: Attach both vertical and horizontal strips with screws 1 in. x 2 in. x 12 in. furring strips x 2 attached with screws Step 1: Cut and Assemble Path Supports

Step 2: Attach Frame Bar Step 5: Align top of path with top of support. Attach path to support with screws. 2 in. screws (2) Start end 2 in. screws (2) Stop end 2 in. L-bracket Step 6: Align top of path 2 in. below top of support. Attach path to support with screws. Step 2: Attach Frame Bar