API 14H Task Group Status Proper Classification of Document

Slides:



Advertisements
Similar presentations
SC6 Ballot 1974: Adopt-back of ISO 10423:2009 as API 6A 20 th ed. Task Group Report on Resolution of Ballot Comments Eric Wehner 30 June 2010.
Advertisements

EQUIPMENT VALIDATION.
Subsea Standardization. Brief History SPE ATW on Subsea Standardization held Dec 2008 SPE ATW on Subsea Standardization held Dec 2008 –Form workgroup.
API 6AV1 and API 6A Comparison
TEMPUS ME-TEMPUS-JPHES
IAQG OPMT OP Assessor Training Oversight Assessment of Training Provider Approval Bodies February 2015 Module 14.
Cover graphic should fill and not exceed the defined grey box. June 27, 2013 Gary Devlin API Subcommittee 18 – Quality Task Group 7: Product Life Cycle.
Cover graphic should fill and not exceed the defined grey box. June 14 th, 2012 Gary Devlin API SC 18 – Quality Product Life Cycle TG7.
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
1 Next Generation ISO Susan LK Briggs Presented to EFCOG/DOE EMS Implementation, Lessons Learned & Best Practices Training Workshop, 3/05.
Introduction to ISO New and modified requirements.
Federal Emphasis on Accountability in Higher Education and Regional Accreditation Processes Carla D. Sanderson Commissioner, Southern Association of Colleges.
1 Manufacturing Processes and Validation for Next Generation Implants.
Cover graphic should fill and not exceed the defined grey box. API SC 18 – Quality Product Life Cycle TG7.
January 23, 2014 Kim Wiita. Activities Completed Task Group has met 3 times since the Summer 2013 meeting: August 26, 2013 October 8, 2013 November 11,
SENG521 (Fall SENG 521 Software Reliability & Testing Software Product & process Improvement using ISO (Part 3d) Department.
API 6A 21 st Edition WG API Subcommittee SC-6 Discussions Valves and Wellhead Equipment.
Committee on Refinery Equipment November 2010 Update to the Refining Subcommittee Michael Lubcyik, Chevron Energy & Technology Company, Chair, CRE.
PER15K Protocols for Equipment Rated Greater Than 15,000 PSI ECS Report
QUALITY MANAGEMENT STATEMENT
API RP 6HP (draft 5.2) Status Presentation Tech Session II Summer Standards Conference.
Use of API 6A vs ISO in marking 6A equipment
API 18LCM (Life Cycle Management) Report back to SC17 August 27, 2015 Review Team: Dave Wilkinson, John Strut, Smarty John, David Saul, Peter Moles.
DICOM to ISO-DICOM Report to joint ISO TC215/WG2 – DICOM WG10 meeting January 24, 2004, San Diego.
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
Webinar FSSC audit report 7th september 2015
API 17N (and Q) Subsea Production System Reliability, Integrity, and Technical Risk Management.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience Product Lifecycle Management.
19th January 2012 Don Wells (Hess)
RMC Auditor Workshop Charleston, SC July 2015 Registration Management Committee Company Confidential RMC Auditor Workshop Charleston, SC
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
External Provider Control
API 19 CI Chemical Injection Devices for Downhole Applications
API 19 CI Chemical Injection Devices for Downhole Applications
Final Draft International Standard IS0/FDIS 9001
Task Group API 19SS Sand Screens
API SC19 HPHT Template (Proposed as SC19TR1)
Task Group Status January ,11, 2017
Regulation (EU) No 2015/1136 on CSM Design Targets (CSM-DT)
Prepared by Rand E Winters, Jr. ASR Senior Auditor October 2014
Updates from SC18 Summer Meeting
API 14L Specification for Lock Mandrels and Landing Nipples
Flooding Walkdown Guidance
Task Group API 19SS Sand Screens
API 17Q Proposed Technical Changes to Rev 0
Outcome TFCS-11// February Washington DC
Impact on SC 6 Documents by Kenneth Young
HIGHLIGHTING THE KEY CHANGES
Outcome TFCS-11// February Washington DC
API RP 17A - Discussion Points
API 17Q – Subsea Equipment Qualification
IEEE P650 Status Chair Dennis Dellinger Ametek Solidstate Controls
Status Update on API 16Q / 16R / 16F
Specification on float equipment
First 8 slides are what was presented in San Fransisco…
SC6 Summer ’13 Meeting: WG 14H Update
Use of API 6A vs ISO in marking 6A equipment
Development of a specification
Impact on SC 6 Documents by Kenneth Young
API 14H Task Group Status Proper Classification of Document
TG3 Review Procedure Proposal
IAQG 9120:2009 Revision Overview
API Publication Types From “API Document Format and Style Manual” and “Procedures for Standards Development” the following are “standards” 1. Bulletin.
Gas Lift Workshop – 2003 ISO Update
IEEE Regulatory AHC Draft Teleconference Plan
SC 18 Liaison Report Winter 2012
API Subcommittee SC-6 Discussions Valves and Wellhead Equipment
DRAFT ISO 10007:2017 Revision Overview Quality management – Guidelines for configuration management ISO/TC176 TG 01.
Alignment of Part 4B with ISAE 3000
Radiopharmaceutical Production
Presentation transcript:

API 14H Task Group Status Proper Classification of Document Austin Freeman Sterling Lewis Mike Moy David Comeaux (Chair) Mahesh Udipi Shane Siebenaler Henry Wong Dennis Kaminski Darine Aghnim Jim Brinkley David Pang Sergio Meyberg Proper Classification of Document Review for Clarity Acceptance Criteria (Leakage rate conflicts, 30 CFR 250) Independent Closure Valve Repair Onsite vs. Offsite Failure reporting Process Summer meeting on the re-affirmation vote for RP 14H it was voted to form a task team to address identified issues related to document rev 5. These issues included, proper classification of document, lack of celerity issues, Leakage rate conflict with CFR, independent closing, field repair vs. shop repair, failure reporting solidifying communication between user and manufacturer. 12/4/2018 14H Status - 2/22/2012

Proposed Significant Changes 14H has significant safety implications to critical processes. Task-group decided to review/re-write of 14H under the presumption that the document would qualify to be re-classified as a standard, with language to match. Added Normative References Section Most clauses modified to read as requirements instead of guidance: Examples: Clause 4: “installation procedures outlined in the operating manual should  shall be followed” Clause 5: “Replacement Parts should be qualified parts…”  “Replacement parts shall meet or exceed OPD (Original Product Definition) requirements…” Clause 8: Repair documentation “shall be maintained for the possession period of the equipment, and shall accompany the equipment during transfer of ownership.” Alignment of terminology with 6A: Onsite repair  Field repair Normative References API Spec 6A API Spec 17D API Spec 6AV1 ISO 10423 API RP 14C  12/4/2018 14H Status - 2/22/2012

Proposed Significant Changes Testing Operation and Pressure Holding tests consolidated into a single procedure. Test procedures for SSV and USV were consolidated into a single procedure. Specified a total of 3 cycles comprising the operation test (not specified previously). Added requirement for duration of pressure-holding period to be sufficient to demonstrate compliance to the acceptance criteria when an indirect leakage measurement method is used. Operation/Pressure Holding test modified to allow operators to use equipment/methods having the required precision to measure leakage across the SSV/USV and compare this leakage against the acceptance criteria. Added explicit requirement for zero leakage of pressure-containing components. Pressure Build-up Methodology being reviewed and modified in Annex A. (still being developed) Clause 6 (Testing Procedures): This clause was re-written in its entirety. 12/4/2018 14H Status - 2/22/2012

Proposed Significant Changes Failure Reporting No longer a “User Recommendation” Added requirements: “Manufacturer must respond to the failure report per API 6A requirements.” Documentation Requirements Exhibits 1 through 4 being revamped (still being developed) Exhibit 1: Failure Report for Surface Safety Valves (SSVs) and Underwater Safety Valves (USVs) Exhibit 2: SSV/USV Repair Record Sheet Exhibit 3: SSV/USV Functional Test Data Sheet For Onsite Repairs Exhibit 4: SSV/USV Functional Test Data Sheet For Offsite Repairs Clause 6 (Testing Procedures): This clause was re-written in its entirety. “Operator to provide written report of failure of equipment repaired to  covered by 14H to the manufacturer.” 12/4/2018 14H Status - 2/22/2012

Gaps An international regulatory body requires verification of independent closing capability (i.e. Against flowing conditions) TG resolved that this is out of scope of 14H. Design considerations and their respective analysis/verification requirements are in the scope of API 6A. Leakage rates specified in 14H are not consistent with CFR. Maximum credibility of 14H will be achieved when the acceptance criteria presented in 30CFR250 and 14H are aligned. Team is unsure on course of action required to realize this alignment. Definition of SSV/USV as well barrier and therefore the need to verify independent performance through validation testing against full-flow conditions. (i.e. Independent Closing Testing Requirements). This was originally identified as possible gap in 14H, but TG team resolved that this validation testing is not in the scope of 14H, and that any design considerations and their respective validation are in the scope of API 6A. Clause 10.20 “Specific Requirements for Surface and Subsea Safety Valves” in API 6A should be enhanced to include validation requirements related to closing under field flowing conditions. 12/4/2018 14H Status - 2/22/2012

Timeline Several working meetings since May 2011: 8/11/11, 10/27/11, 12/07/11, and 01/19/12 Complete Committee Draft of API 14H Send out for comments – July 2012 Out for Ballot October 2012 12/4/2018 14H Status - 2/22/2012