Indicative Council Cost Balance of Project Costs (5 Year ARI Assets)

Slides:



Advertisements
Similar presentations
PLANNING THE FUTURE OF SEVENOAKS DISTRICT Alan Dyer Planning Policy Manager Sevenoaks District Council Presentation to Sevenoaks Society 7 October 2009.
Advertisements

New Mexico Infrastructure Finance Conference, October 28, 200.
Port NE Group Portarlington NE Group Road Sealing.
Shenagh Gamble Sustainability Programs Coordinator Local Government Association of the Northern Territory.
Mechanicsburg Borough Town Hall Meeting October 15, 2014 STORM WATER AND STREET INFRASTRUCTURE.
Click to edit Master title style Click to edit Master subtitle style Planning CITY OF MELBOURNE.
Management and regulation of estuary management Ingrid Holliday DSE, Marine Biodiversity
LEGAL RESPONSIBILITIES RELATING TO EASEMENTS Michael Mammen – Partner, HWL Ebsworth Lawyers.
Stakeholder Workshop July 27, Present updated information on the Central Groundwater Storage Plan Receive additional stakeholder input Discuss next.
Management of Surface Water in Severe Weather Conditions from the Highway GORDON HUNT COUNTY DRAINAGE ENGINEER for OXFORDSHIRE COUNTY COUNCIL.
Agenda What is Atlantis? What does Atlantis do? Current Situation Solution - Ecological Cities Product Range Applications and Large Scale Projects The.
Before Katrina, you had a 1% chance every year of flooding this deep from Hurricanes Notes: The depth map tool is a relative indicator of progress, over.
Development Contributions Witzenberg Municipality 30 October 2013.
Asset Management Performance (Structures) Awtar Jandu Safe Roads, Reliable Journeys, Informed Travellers Bridge Owners Forum – Cambridge –16 Jan
Site Planning: Site Drainage KMUTT First semester
3 May 2013 Presented By: Joanna Oborne Councils Powers and Obligations with respect to Driveways.
Renfrewshire Council Interreg III B NWE Urban Water Project Strand No 3 Spatial Management of Water Infrastructure Regeneration.
Hydrologic Cycle and Watersheds. Hydrologic Cycle Components Precipitation Infiltration Percolation Runoff Evapotranspiration.
Geomorphology, Fall cm DEM view of piece of landscape.
SOCIAL HOUSING. New governance and accountability arrangements for Local Aboriginal Land Councils (LALCs); Introduced the requirement for formal community.
Private Certification information session 3 April 2013 regulations 1 Case studies Information Session April 2013 regulations PRIVATE CERTIFICATION FOR.
 Prepared for  City of Palm Coast, Florida  June 24, 2014 Drummond Property Acquisition in Connection With The Land Donation of 70 Laramie Drive From.
Obligations and Practices Information Session April 2013 regulations PRIVATE CERTIFICATION FOR PLANNING ASSESSMENTS.
APPLYING POLICIES TO DEVELOPMENT APPLICATIONS PLANNING SCHEME POLICIES.
Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.
An Update 1 August 4,  The proposed hydro generating station at Bala Falls remains front and centre as an issue of concern to residents and cottagers.
Sewer Relief Project. Basement Flooding has been a major problem for city of Selkirk residents. High intensity summer rain storms can result in extensive.
1 Waipaoa River Flood Control Scheme Review. 2 Review Technical Review Sept 2009 Steering Committee Oct 2009 Operations Committee Oct Council February.
Planning Scheme Policies Development Industry Information Session 10 November 2009.
Review of Issues Affecting Utilities and Road, Rail and Motorway Corridors Mike Sim & Hamish Elliott Resources & Networks Branch Ministry of Economic Development.
Engineering Hydrology (ECIV 4323)
Rivers and Drainage Basins - A Prelude to Flooding Drainage basin/River basin: An area of land drained by a main river and its tributaries. Drainage basin/River.
Flood Prevention Measures The first six months of 2013 have seen a significant increase in flooding of both tertiary and machine installation. The following.
Agenda  Review project scope and goals  Update project status  Review results of public surveys  Identification of capital projects  Draft capital.
2011 Multi-Jurisdictional Hazard Mitigation Plan Volunteer Survey Results Diane Margetts May 3,
Important Features of the Balance Sheet 1. Assets = Liabilities + Owner’s Equity 2. 3 line heading is used that tells the reader: WHO, WHAT, WHEN 3. Assets.
PAS Project 1 Performance Measurement For water and sanitation- indicators CEPT UNIVERSITY.
Linford School Drainage Improvements 21 March 2016 City of Laramie.
Public Hearing – FY 2017 – 2021 Recommended Capital Improvement Program Budget April 25, 2016.
STAMFORD CAPACITY AND LIMITS TO GROWTH STUDY SOUTH KESTEVEN DISTRICT COUNCIL FINAL REPORT PRESENTATION PRESENTERS: UNA McGAUGHRIN JESSE HONEY 14 TH DECEMBER.
MELBOURNE HILL ROAD CATCHMENT DRAINAGE IMPROVEMENTS Reference Panel Meeting, 6 February 2014.
AHWATUKEE-FOOTHILLS ADMS MANDAN STREET DESIGN CHARRETTE Valerie Swick, Project Manager Flood Control District of Maricopa County.
AIRPORT SURVEYS.
Prepared By: Suthar Pramit A. ( ). WHAT IS CROOS DRAINAGE WORK when the network of main canals, branch canals, distributaries, etc.. are provided,
Village of Villa Park October 24, 2016 Washington Street Combined Sewer Separation Project.
Transportation Services Department
Mangawhai Wastewater Strategy and Options 7 August 2017.
Development Charge Public Meeting October 23, 2017
Financial Accounting II Lecture 36
A resonance hybrid structure for an amide bond is shown at top and is made up of two resonance forms. Resonance forms need not contribute equally to a.
Consolidated Plan Amendment Wednesday, May 10, 2017
Water quality and quantity indicator
CONSTRUCTION TECHNOLOGY & maintenance
Regulation Amendment AM April 3, 2018.
Melbourne Hill Road Drainage Scheme
Melbourne Hill Road Drainage Scheme
Village of Sherwood Stumpf Subdivision Paving and Drainage Improvements November 7, 2018.
1200 West Widening and Reconstruction Project
WORKING PARTY ON NATIONAL ACCOUNTS (WPNA) OCTOBER 2004
Study of Miles City Slough
Copyright © Cengage Learning. All rights reserved.
Engineering Hydrology (ECIV 4323)

Chapter 5 Budgeted financial statements
Nathan Sykes Plymouth Coastal Observatory
Engineering Hydrology (ECIV 4323)
Flooding Surrounding the Addicks Reservoir during Hurricane Harvey
Copyright © Cengage Learning. All rights reserved.
3rd Meeting of the IHO Council
Presentation transcript:

Indicative Council Cost Balance of Project Costs (5 Year ARI Assets) Melbourne Hill Road Drainage Scheme indicative Cost Breakdown – 5 Year V 100 Year Drainage Scheme 2.1 – 19 October 2015 Total Project Cost $1,300,000 Indicative Council Cost (as per Council Policy) Upgrade existing Council underground drains Upgrade flood conveyance capacity to 1 in 100 year ARI (Major Storm) Outlet Works $450,000 Balance of Project Costs (5 Year ARI Assets) (Minor Storm) $850,000 Notes: The owner contribution will be based on the cost of construction of the 5 year ARI drainage system and other relevant Council Policy provisions. Council Policy requires Council contribution in respect of upgrade of the drainage system to a 100 year ARI standard (as shown above), contribution based on the area of road reserves and other Council land, as well as contribution to the cost of boring works where necessitated by Planning Scheme requirements. The indicative owner contribution will be determined following review of the scheme boundary for the preferred scheme and application of these policy provisions.