Bari production centre resp. M. de Palma

Slides:



Advertisements
Similar presentations
Clean Room Plans Monday, August 23, Hybrids--- Frames--- SensorsModules.
Advertisements

03 Dec 2002CMS Week - Bonding WGSalvatore Costa - Catania Status Report on Bonding at Catania Salvatore Costa University and INFN – Catania.
Status Brussels GANTRY Ê We have observed a significant influence due to temperature 4 we had a lot of problems with our cooling system (ventilation) Ë.
CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 1 Status of the UCSB Gantry Dean White University of California Santa Barbara October.
Slide 1CMS Database Issues-Derek BargeDOE review, January 20, 2004 CMS Database Issues Derek Barge.
1 Hybrid & Module Testing Status Week of 6/6-6/10.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
Status of the Tracker DB System Tk week april 03 D. Contardo Developments Applications.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
US Module Production June 2, 2005 J. Incandela For the US CMS Tracker Group.
CMS Tracker Week, CERN, Apr Apr 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Module Production ___________ Report on.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
CMS Week, CERN, December Dec 2004CMS Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group Meeting Salvatore.
Status Brussels GANTRY Ê Assembly of R3 modules (36 modules) 4 precision of the modules 4 problems with DataBase (not adapted for single sensor modules)
CMS Tracker Week, CERN, April Apr 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
CMS Tracker Week, CERN, October Oct 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
CMS Week, CERN, September Sep 2003CMS Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 16 Sep.
CMS Week, CERN, Mar Mar 2004CMS Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università di.
Tracker Week, CERN, Oct Oct 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 21 Oct.
10 April 2003Salvatore Costa, INFN Catania1 CMS Tracker Week CERN, 10 Apr 2003 Entering Bonding Data in TrackerDB.
CMS Week, CERN, June June 2004CMS Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group Meeting Salvatore.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
CMS Tracker Week, CERN, February Feb 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
Brussels Module Production Ê We have producted 57 R6 modules and 26 R5N modules 4 of which 67 grade A and 9 grade B and 7 outside specifications Ë We have.
CMS Week, CERN, June June 2004CMS Week - TPOSalvatore Costa - Catania Repair Centers, from a Bonder’s point of view Reported by: Salvatore.
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
Strasbourg status Ring 7 pilot run François Didierjean.
Lyon Gantry Status CERN 15 Sept D. Contardo Calibration Plates and Tools Readiness for production.
CMS Tracker Week, CERN, February Feb 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
Catania Production Center S.Albergo Universita’ & INFN Catania.
Tracker Week, CERN, Feb Feb 2004Tracker Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università.
Status Report on Bonding at Catania
Status Brussels GANTRY
UCSB Hybrid Bonding & Testing
On behalf of the US TOB testing group
Defect Analysis algorithms for the ARC, Lt and LtStruct tests
Hybrid & Module Testing Status
US Module Production Status
Executive summary from Bonding WG Meeting 21 Oct 2003
Hamburg Bonding Report
Results from module testing
A. Kaminskiy, CMS Tracker week , Apr 2004
US Module Production Quality
Vienna Module Production
FNAL Module Testing Status
Module Production Status in Florence
CMS Perugia Modules Production Review
Module production in Italy
Hybrid & Module Electrical Testing
CMS Perugia Gantry Status Report
Hybrid & Module Testing Status
L.Fiore Gantry Meeting during the CMS TK week
Module Production in Brussels
Module Testing in Florence Carlo Civinini INFN-Florence
US Module Testing Progress Report
UCSB Module Assembly Week of 12/5 – 12/9/05 Week of 12/5 – 12/9/2005.
TEC module quality overview
TOB Module Production Overview and Plan
FNAL module testing summary
Hybrid & Module Testing Status
Recent TOB Developments
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Recent TOB Developments
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg
Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,
TEC Ring 2 module prototypes J. Hrubec / Inst. für Hochenergiephysik
Università di Catania and INFN – Sezione di Catania
Università di Catania and INFN – Sezione di Catania
Presentation transcript:

Bari production centre resp. M. de Palma Module Assembly (Gantry) Resp: L.Fiore Physicist: M. Preda Technicians: R. Ferorelli , G.Sala part time partecipation of M.Salemi (Ct) has to be sheduled Bonding Resp: P. Tempesta Technicians: P. Cariola Module Test Resp: S. My Physicist: D. Creanza, D. Giordano Technicians: G. Sala Db interface Resp: V.Radicci Physicist:G.Selvaggi April 22 th 2004 L. Fiore (INFN sez. Bari) Module production Meeting - CMS TK week

Module assembly (Gantry) Available module components Inventory: Sensors: 105 IB1, 340 IB2, 28 W2 , 62 W3 Frames: 409 (r-phi) , no stereo available Hybrids: 48 stereo left, 30 stereo right, 67 incoming r-phi Available tools 3 assembly plates for r-phi modules are operational 1 assembly plate for stereo-left modules under commissioning 3 sets of hybrid tool bridges (12 bridges) April 22 th 2004 L. Fiore (INFN sez. Bari) Module production Meeting - CMS TK week

L. Fiore (INFN sez. Bari) Module production Meeting - CMS TK week # Assembled modules 330 good modules were assembled (4 bad) 110 TIB Layer 1, r-phi (IB1 Sensor and 6 apv hybrid on board) 220 TIB Layer 3,4 r-phi (IB2 sensor and 4 apv hybrid on board) April 22 th 2004 L. Fiore (INFN sez. Bari) Module production Meeting - CMS TK week

Gantry (optical inspection) April 22 th 2004 L. Fiore (INFN sez. Bari) Module production Meeting - CMS TK week

L. Fiore (INFN sez. Bari) Module production Meeting - CMS TK week Gantry x,y precisions April 22 th 2004 L. Fiore (INFN sez. Bari) Module production Meeting - CMS TK week

Gantry angle precisions April 22 th 2004 L. Fiore (INFN sez. Bari) Module production Meeting - CMS TK week

L. Fiore (INFN sez. Bari) Module production Meeting - CMS TK week Gantry experiences The pre and post assembly hybrid ARC test done on the first 100 modules showed no effects on the original behaviour of the hybrids after assembly then a sample basis ARC test were decided on the outcoming unbonded modules 8 bad hybrids were discarded over 426 No problems for a normal 8 module/day production A variable flux of all the incoming componets, prevented to test extensiveley a full assembly regime (12 modules/day) Shipping of the unbonded modules to Florence,Catania and Torino Bonding centres was done with no problems (via DHL) after small corrections on the foam of the transportation boxes April 22 th 2004 L. Fiore (INFN sez. Bari) Module production Meeting - CMS TK week

L. Fiore (INFN sez. Bari) Module production Meeting - CMS TK week Module bonding Modules bonded till now: 29 IB_L12P6D (6 APV module) 64 IB_L34P4D (4 APV module) Pull test done on 71 modules No particular problems on the machine has been experienced till now Normal rate of 3 mod/day up to 5 Bonding jigs for TID modules missing April 22 th 2004 L. Fiore (INFN sez. Bari) Module production Meeting - CMS TK week

Bonding (repaired modules) L12 modules: #modrep/#totmod =7/29 #rep_strip/#totmod= 2.5 #rep_strip/#tot_strips= 3 °/°° L34 modules: #modrep/#totmod =10/64 #rep_strip/#totmod= 0.3 #rep_strip/#tot_strips= 0.5 °/°° April 22 th 2004 L. Fiore (INFN sez. Bari) Module production Meeting - CMS TK week

L. Fiore (INFN sez. Bari) Module production Meeting - CMS TK week Module test (ARC test) ARCS version & macros: all modules (L34 & L12) tested with ARCS 7.0 with TIB official cuts: testsettings_70.xml xml file for DB produced with xFLAG ( version 1.4.3 for RH 7.3) Module grading after ARC test (up to last week) Over 63 modules tested (IB_L12P.6D) : 12 grade A (IB_L34P.4D) : 48 grade A, 1 grade AF and 2 grade C April 22 th 2004 L. Fiore (INFN sez. Bari) Module production Meeting - CMS TK week

Module test (defects multiplicity) L12 modules 1 2 3/9216 ~ 0.03 % L34 modules 157/21504 ~ 0.7 % 0.51 ‰ (only …35184) 0.51 ‰ (only …35184) 0.6 % 0.2 ‰ April 22 th 2004 L. Fiore (INFN sez. Bari) Module production Meeting - CMS TK week

L. Fiore (INFN sez. Bari) Module production Meeting - CMS TK week 92 bad strips April 22 th 2004 L. Fiore (INFN sez. Bari) Module production Meeting - CMS TK week

L. Fiore (INFN sez. Bari) Module production Meeting - CMS TK week April 22 th 2004 L. Fiore (INFN sez. Bari) Module production Meeting - CMS TK week

Module test (IV curve for all modules) T < 23 °C RH < 25% I (uA) V (Volt) April 22 th 2004 L. Fiore (INFN sez. Bari) Module production Meeting - CMS TK week

L. Fiore (INFN sez. Bari) Module production Meeting - CMS TK week Xml files on DB April 22 th 2004 L. Fiore (INFN sez. Bari) Module production Meeting - CMS TK week

Module test (Long term) CMNoise (ADC Counts) APV1 APV2 APV3 APV4 bench0 0.39 0.38 0.41 0.40 bench1 0.35 0.34 0.37 bench2 0.32 0.33 0.31 0.36 bench3 0.42 bench4 bench5 Long Term test started last week 6 L34 modules were tested xFLAG analysis not yet started 3 modules had DAQ errors No modules with I2C errors Massive LT test will start next week Record1 Record18 - COLD Record19 30200020035139 Dec Inv On Tbox = - 20° Tbox = + 20° April 22 th 2004 L. Fiore (INFN sez. Bari) Module production Meeting - CMS TK week