Compliant Installation of Voice Alarm Systems

Slides:



Advertisements
Similar presentations
Electronic Locking and Exemption Request Form Training
Advertisements

State Fire Marshal Question and Answer Session with the Louisiana Automatic Fire Alarm Association March 19, 1999.
Background Design: Torsten Kranz Design: Torsten TEE CLASSIC ACOUSTICS AND TOA PRESENTS THE VENAS VOICE EVACUATION SYSTEM.
T. Kranz TOA Germany 1 EN Compliant Installation of Voice Alarm Systems.
GE job title/1 GE internal information - Not for external distribution 1 GE Security EMEA NPI template – v1 1X Series (phase 1) Conventional Fire Panel.
This training video is designed to explain: ◦MonIdor’s Purpose ◦System Applications ◦System Features ◦Technical Specifications ◦About the Code ◦Custom.
Protecting life, environment and property... 1 ID: AVOICE_Applications_Eng, AutroVoice BR-200 Applications.
UL Code th Edition An Overview of the Foremost Code Updates.
Security Systems BU Communication Systems Slide 1 Plena Voice Alarm System Commercial Presentation.
Cancer Center Training 2012 Cancer Center Training 2012 “Defend in Place” Strategy for Fire Alarm Activations Cancer Center Building #7559.
Medical Gas Alarm Panels
Crane Operations Objective
FireClass FC501. What’s FC501 ? An entry level Triple Circuit Single Loop addressable system featuring Intelli-Zone mapping An “out of the box” panel.
Prevent False Alarms Eugene A. Cable, P.E., M.S.F.P.E. Life Safety Consultants NEHES Honorary Member 412 Horse Heaven Road Averill Park, New York
Retirement Home Regulated under the Retirement Home Act, 2010.
ONYX Product Overview.
BUILDING SECURITY ALARM SYSTEM. BUILDING SECURITY ALARM SYSTEM Any electrical or mechanical device which is designed or used for the detection of an unauthorized.
Engineer Training UV Electrical Cabinet (16 and above) TJ8300 / TJ8500 UV Electrical Cabinet (Machines 16 and above)
Performance New requirement s for circuit integrity: enhanced cables BS : 2002 Fire Detection and Fire Alarm Systems for Buildings Part 1: code.
Voice Evacuation an introduction. Please note: This presentation has been formatted to enable easy download and and is not recommended for large.
Chapter 2 What is an Alarm System? Alarms: The First Line of Defense
NFS System Components & Installation.
SESAME PSS Phase I : Microtron + Booster Morteza Mansouri SESAME PSS engineer on behalf of Safety group TAC Morteza Mansouri, SESAME TAC 2012, Nov.10th,2012.
Single Loop Analogue addressable fire control Panel
Emergency Child Guidance System The goal of this project is to design, build, test, and document a child emergency guidance system. The system will sense.
CLIC CES Webex 12 Nov Summary: – Set of fire safety measures defined in CERN Safety Report – Proposed Structure for CLIC/ILC Fire Safety Report Fabio.
An Introduction to the R3 19 inch Rack The R3 control system comprises a number of different plug in modules, each of which is dedicated to a particular.
KIDDE FIRE PROTECTION Vega Peer to Peer Networking.
© 2015 American Society for Healthcare Engineering, a personal membership group of the American Hospital Association 155 N. Wacker Drive, Suite 400 | Chicago,
UIC ERTMS World Conference Certification and Assessment of GSM-R Begoña DOMINGO, GSM-R Project Officer Istanbul, 3/04/2014.
Firefighter III Module C Communications (4-4) Identify the policy and procedures concerning the ordering and transmitting of multiple alarms.
1 Internal | ST/PRM2-EU | | © Robert Bosch GmbH reserves all rights even in the event of industrial property rights. We reserve all rights of.
Ministry of Industry and Trade of Russian Federation June 2013 Deputy director of the Department of transport and special engineering industry V. Kaganov.
2 December, 2015 New Conventional Fire Control Panel.
Floor Wardens Safety Monitors & Guests. Overview.
Puissant Panel User Training Esc.. 09:11:35 ACTIVE # * 3 6 RESET SYSTEM CLEAR DISPLAY TEST DISPLAY SILENCE BUZZER ESCAPE ENTER SILENCE.
OICA IWG AECSFEBRUARY 2016 AECS REGULATION POST-CRASH CHECK WITH HMI METHOD.
OICA IWG AECSAPRIL 2016 AECS REGULATION POST-CRASH CHECK WITH HMI TEST METHOD SUMMARY -ASIL determination – ISO Pre-requirements for HMI test method.
Fire Alarm Verification CAN/ULC-S561-03
1 UNIFIED FIRE AUTHORITY FIRE PREVENTION BUREAU Knox Box Ordering Information This document is designed as a summary guide using the IFC requirements.
Security Systems BU Communication Systems Slide 1 Plena Voice Alarm System Phase 2.
Carbon Monoxide Detection: Code and Legislation Updates
MEDICIS Safety Alarms Systems
Environmental Health & Safety
The One Stop Shop for Vehicle Autorisation, Safety Certification, and ERTMS Approval First Preview - INNOTRANS 2016 Thierry Breyne.
I-Station Hardware, Installation & maintenance
Advisor Advanced Release FW120.
NICET Fire Alarm Tech Level 1 Practice Test
HSE rules & regulations
Environmental Health & Safety
Fire Alarm Systems for Emergency Operations of Elevators
Decree of the Ministry of Interior 3rd August 2015 The “so called” Italian Fire Prevention Code - IFC: S7 – Fire Detection and Alarm Systems Piergiacomo.
Feature Benefit Feature Benefit Feature Benefit Feature Benefit
Fire Safety for MSO, Residents, Medical Students and Nursing Students
Systems Design, Implementation, and Operation
EN 54 EN 54 Standard The EN 54 Fire detection and fire alarm systems is a mandatory standard that specifies requirements and laboratory test for.
FACILITY EMERGENCY PROCEDURES
Fire Safety for MSO, Residents, Medical Students and Nursing Students
FLDigi for Narrow-Band Emergency Messaging System
Introduction A variety of situations may create the need to evacuate a University building including fires, natural disasters, and alarm activations.
Basic Amplifier MCI/BAM and WLS2 B-Channel A-Channel 12/5/2018.
SAFE WORK INSTRUCTIONS
Learning Outcome 4 Understand the types, applications and limitations of wiring systems and associated equipment This presentation looks at emergency management.
IP Audio Interface PRS-1AIP1 (HW 2.0) 1/16/2019.
Latest standardization measures for lifts
PSS0 Design & Concept of Operations
Fire Alarm Practice Drill # 11 Denver Fire Department Journeyman Installer License Test © Ted Smith 2017.
Introduction A variety of situations may create the need to evacuate a University building including fires, natural disasters, and alarm activations.
Permit to Work Process​ HSE GROUP RULE (CR-GR-HSE-402)
Presentation transcript:

Compliant Installation of Voice Alarm Systems EN 54-16 Compliant Installation of Voice Alarm Systems

When does EN54-16 Apply? Construction Products Directive CPD CPD: EN54 is mandatory for fire detection and alarm systems in all EU member states 2008: issue of two new parts of EN54 Part 16: voice alarm systems End of co-existence period*: March 2011 Part 24: loudspeakers for voice alarm systems End of co-existence period*: April 2011 * End of co-existence period: conflicting national standards must be withdrawn

When does EN54-16 Apply? System depending EN 54-16 must be applied When the voice alarm system is controlled by the fire detection system Application not necessary When the voice alarm system is a stand-alone system (triggered manually) or controlled by others that fire detection systems When must voice alarm be applied? National requirements

Approved VA Systems Certification The voice alarm system must be certified on EN54-16 by a notified body Notified bodies can be found on the EU Web sites Certificate of the notified body contains Certificate number Approved system components Approved options

Approved VA Systems Indication of Approval Certificate number at least on one main part of the VA system in the accompanied documents Applicable options

Access Levels Mandatory Function Mandatory Indications EN 54-16 Compliant Design Access Levels Mandatory Function Mandatory Indications

Access Levels Access Level 1 Public areas or Areas with unrestricted access for persons having a general responsibility for safety supervision E.g. in a technical room Manual controls shall be accessible without special procedures E.g. not by opening a door

Access Levels Access Level 2 Access restricted by special procedures Access by mechanical key (locked technical room) code of at least 3 sequential operations access cards Access for Persons with specific responsibility for safety and Authorised and trained on operating

Mandatory Indications Must be in Access Level 1 always VA condition, especially EMERGENCY Indication on a remote microphone by programmed fault receipt (acknowledge) button (SX: on SM) General Fault System Fault

Mandatory Indications Must be in Access Level 1 always Fuse Rupture Indication on a remote microphone by programmed fault receipt (acknowledge) button for all amps Fault in Signal Path between System components Only for SX-2000: indication by programmed fault receipt (acknowledge) button Earth Leakage For outgoing wires (e.g. speaker lines, microphones) Only necessary if not implemented in other fault

Mandatory Functions Must be in Access Level 1 always Lamp Test (Button) To test the mandatory indications Fault Acknowledge (Button) In TOA VA systems always combined with fault indications

Options Mandatory Indications Faults in VA Zones One fault indicator per VA zone Fault in the connection to the fire detection system A separate indicator must be provided

Options Access Level Manual Silencing 2 Manual Reset of the VA condition 2 VA condition output n.a. VA manual control 2 Emergency microphones 2 Redundant power amplifiers n.a. Audible warning of VA condition 1, 2 Phased evacuation 2

Options Available on TOA VA Systems Manual Silencing SX, VX Button on emergency microphone VX: acivating dummy text (silence) SX: stopping emergency pattern or sequence Manual Reset of the VA condition SX, VX, VM Emergency reset button VA condition output SX, VX, VM Control output VA manual control SX, VX, VM Manual assignment of emergency messages to emergency zones

Options Available on TOA VA Systems Emergency microphones VX, VX, VM Fireman microphone, emergency microphone (VX, SX) Redundant power amplifiers SX, VX, VM Standby amplifiers Audible warning of VA condition VM Buzzer tone when emergency was activated Phased evacuation SX When phases can be controlled manually or by fire detection system