Eastbank Road, Brgy. Sta. Lucia, Pasig City

Slides:



Advertisements
Similar presentations
The Greenwood Apartments a partnership between Banc of America Community Development Corporation and Clearwater Neighborhood Housing Services, Inc.
Advertisements

-Master Bedroom w/ T & B - 2 Bedrooms - 1 Maids Quarter - 2 T & B - Living Room - Dining Room - Porch - Terrace - Carport -Standard Lot Area – 156 sqm.
WEEKLY PHOTO REPORT WEEKLY PHOTO REPORT Week of: August 5 th, 2013 – August 9 th, 2013.
Bolinas Marine Laboratory Facility Project Background and Existing Conditions Review.
ASPHALT & CONCRETE FOR INDOOR FACILITIES Presented by Tom DeRosa.
Sun Valley, Parañaque City. Lions Park Residences Lions Park Residences is a 1.9-hectare condominium development that nurtures nature in urban living.
SMOKEY MOUNTAIN PROJECT, BALUT, TONDO MANILA MODEL UNIT.
Camarin Residences 1 Caloocan City
LOGO Molino, Bacoor City Cavite. Elyana 2-Storey Town House, Provision for 2 Bedroom 1 Toilet & Bath Lot Area: 36 sqm. Floor area: 46 sqm.
LOGO General Trias Cavite. Along cross roads of Daang Hari and Arnaldo Hi-way.
Residential Architectural Plans
Enjoy the benefits of living close to Mother Nature without missing out on your urban essentials at Avida Settings NUVALI! It is conveniently close.
SAN LORENZO PLACE.
Site Plans.
Experience the verve of living by the banks and drift through the historic and scenic beauty of Pasig River. Project lot area composed of 14,000 square.
City of Alexandria Planning Commission October 4, 2011 ASA Expansion DSUP
ATTACHMENT C Photographic Report. Photo 1 - Influent Pipe to Wastewater Treatment Plant Photo 3 - Influent Flume for Flow Metering Photo 2 - Chart Recorder.
Project Highlights Sharing boundaries with 325 acre of integrated township of Uniworld City. Unihomes – Mohali is a spacious home well within your reach.
ARCHITECTURAL DESIGN Residential Architectural Plans 1 Copyright © Texas Education Agency, All rights reserved.
Water, Sanitation, and Development in Belize.
Leila Talebi (3/28/2012).  The existing land use of Cincinnati Zoo consists of various types including parking lot, open space areas, and steep wooded.
Lakes Creek Road Waste Transfer Station Construction highlights.
Seventh Edition By David A. Madsen, Terence M. Shumaker, and David P. Madsen Civil Drafting Technology Chapter 13 Civil Engineering Detail Drawings.
Project Title: CONSTRUCTION OF SCIENCE & TECHNOLOGY BLDG. (Ph. 1) Approved Budget for the Contract (ABC): Php 26,102, (Ph. 1) Source of Funds:Fund.
January 19, 2010 Thanh-An Sam. Building Considerations People activities/accessibilities 1. segregated garages 2. Bottom for shops-amenity/pool/park 3.
17 th Avenue Residence Hall Project Energy Management – a division of Facilities Management
HOME MODEL. P e r s p e c t i v e HOME MODEL 4.00m X 5.50m Floor Area = 22 sqm. Turn-over unit 4.00m 5.50m 1.4m 4.00m.
Use & Re-use Water is used in a conventional way such as bathing or washing dishes, except for the toilet. The water is used and cleaned a second time.
COUVA SHOPPING CENTRE. EXISTING LAYOUT ASSUMPTIONS ONLY EXISTING LAND AREA AVAILABLE MAXIMISE RENTAL OF EXISTING SPACE PROVIDE A FINANCIALLY AFFORDABLE.
INTEGRATED DESIGN PROJECT BFC 43303
PROJECT BRIEF.
1 THE MANILA WATER EXPERIENCE Virgilio C. Rivera, Jr. Group Director, Regulatory and Corporate Development Delivery of Water and Sanitation Services.
COZYEON Residence Main facilities gallery. Corridor of each floor.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project March 12, 2002 Contractor Outreach.
Building Floor Plan 2, 3, 5, 6 and 9 Ground Floor 2nd and 3rd Floor 4th and 5th Floor INFORMATION AS May 14, 2014 The developer reserves the right to change,
The Pearl Place as of January 2014HLURB LTS # Pearl Drive cor. Gold Loop, Ortigas Center, Pasig City.
All Here. All Near. At the University Belt PROJECT OVERVIEW Size of Development: 17, sq.m (Gross Floor Area) Project Type: High Rise Building Development.
Drafting 2 (Arch) Quiz Review #6 Quiz Review. 1.To anchor a stud wall to the subfloor, carpenters nail through the: Sole plate Header Jamb Joists Quiz.
PROJECT STATUS REPORT C-E CONSTRUCTION CORPORATION CONTRACTORS: S & H Electrical Construction Corporation CDC REALTY, INC.
Sewerage & Water Board of New Orleans Water Hammer Hazard Mitigation Project February 4, 2015.
Fundamentals of Construction
ELCITA UPDATE February 2017.
All Here. All Near. At the University Belt. All Here. All Near. At the University Belt.
All information stated is intended to give a general overview of the project and the Developer reserves the right to modify as it sees fit without prior.
Building Floor Plan 2, 3, 5, 6 and 9
Jackson Ave., Asiaworld City, Brgy. Don Galo, Parañaque City
JOHN J. CARROLL INSTITUTE ON CHURCH AND SOCIAL ISSUES
Design of a Commercial Shopping Center
SKYWARDS TECH PARK.
FRESNO COUNTY WEST ANNEX JAIL
TO LET (MAY SELL) Former HSS Hire Unit Wakefield Road Bradford BD4 7LX
Fundamentals of Construction GTT – Unit 7 – Green Architecture
Conservation Design for Subdivisions
AD16WM Workspace Management Lecturer: Daniel Wong MBA, MSc, BBus
DAVAO CITY TOURISM Galing sa
1 Semester Project Design A Multi Story Office Building
The sport hall.
Site Design •Project Site context Module 3: •Site Analysis
Ang pagsasagawa ng wudo
Fundamentals of Construction Gateway – Unit 7 – Green Architecture
 Ang koloniyalismo ng mga kanluranin ay nag simula sa mga bansang Europio na gustong ipalaganap ang kanilang pananampalataya,makatukllas ng iba pang.
Layunin: Naiisa-isa ang mga lalawigang bumubuo sa CAR. Nailalarawan ang lokasyon, katangian pisikal, mga tao at industriya at produkto ng CAR.
PAGPAPATUPAD NG MDG’S SA BARANGAY 186, PASAY CITY GAMIT ANG CBMS DATA
Tenement life in The lower east side
AVAILABLE LOTS BLOCK 7 NATURE PARK BLOCK 16 BLOCK 6 OPEN SPACE
Masonry Bearing Walls.
WELCOME TO METRO CITY.
PEPT for Validation Purposes
GALVESTON COUNTY WCID NO BOND PROGRAM
National Capital Region
Presentation transcript:

Eastbank Road, Brgy. Sta. Lucia, Pasig City Manggahan Residence I Eastbank Road, Brgy. Sta. Lucia, Pasig City

PROJECT PROFILE

PHASE I SITE DEVELOPMENT PLAN Floodway Talipapa ORTIGAS AVE. EAST BANK ROAD MANGGAHAN FLOODWAY PHASE I WESTBANK ROAD LRB 1 JAVIER BRIDGE LOKASYON LRB 2 PASUKAN/LABASAN LRB 1 PHASE I SITE DEVELOPMENT PLAN

LOW-RISE BUILDINGS BUILDING 1 BUILDING 2

MGA DETALYE Pinturado ang loob at labas ng gusali Yunit pabahay para sa PWD (isa kada gusali) Structural I-beams/ cladding Palabas na pader ay gawa sa CHB 6” Panloob na pader ay gawa sa CHB 4” Pinturadong steel railings

WATER TANKS ROOF DECK AREA FOR ELEVATED WATER TANKS MGA DETALYE CISTERN / PUMPHOUSE Elevated Water Tank na may kapasidad na 2,460 gal. kada gusali 11,250 gal. Cistern Tank na may 5.5 HP transfer pump at stand-by pump (1 kada gusali)

IBA PANG PASILIDAD Sewerage Treatment Plant (STP) w/ 125kva Stand-by Generator located at Phase 2 Parking lots (184 slots) Main Gate 6 streetlights for Phase I Open space PWD ramps Vehicular parking Sementadong daan SEPTIC TANK – (BLDG 2)

HALLWAY STAIR LANDING STAIRS EXTERIOR STAIR LANDING

Isometric Bare Unit HALLWAY Unit Area kada yunit: 4.00m. X 6.00m. (24.00sq.m.) Suplay ng Kuryente: MERALCO Suplay ng tubig: Manila Water MGA DETALYE: Kitchen counter Kanya-kanyang metro ng tubig at kuryente Stove outlet, etc. HALLWAY

Suggested Layout Perspective

HALLWAY AFSS PIPES TYPICAL 24 sq.m. MODEL UNIT

T & B PER UNIT PPR WATER LINE PIPES