B904 Status Report by Fred B.

Slides:



Advertisements
Similar presentations
Commissioning of CSCs and Peripheral Crates Task L M. Ignatenko UCLA October
Advertisements

Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 1 CSC Trigger Primitives Test Beam Studies Main Test Beam 2003 Goals: Verify the peripheral crate.
Jay Hauser, Emu meeting at Florida, 9 January CSC Trigger Meeting Summary Cast of many.
S. Durkin, USCMS-EMU Meeting, Oct. 21, 2005 Critical Data Errors S. Durkin The Ohio State University USCMS EMU Meeting, FNAL, Oct. 20, 2005.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
Mobile DAQ Testbench ‘Mobi DAQ’ Paulo Vitor da Silva, Gerolf Schlager.
T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
21-Jan-2009CSC - ESSC Jan'091 Report on CSC for ESSC Prepared for CSC by Fred Borcherding FNAL.
Track-Finder Test Beam Results Darin Acosta. Darin Acosta, University of Florida 30 July 2004 Trigger Meeting CSC Beam Test (Muon Slice Test) ME.
Muon Tracker Responsibilities This Year South arm commissioning through this year’s run Analysis Software oversight and development North Arm station 2.
Electronics Review, May 2001Darin Acosta1 OPTICAL SP 1 Muon Sorter 3  / port card 3  / sector ME1 ME2-ME3 ME4 SR DT TF SP From CSC Port Cards MS MB1.
7-Nov-08ESSC Nov 2008 > CSC Early Upgrades by Fred B. 1 CSC Early Upgrades Current plans for "early upgrades" and maintenance during 2009 and 2010 Description:
27-April-2009CSC Shifter Training Manual1 CSC Shifter Training EMU Page 1 Fred Borcherding Reach from CSCOperations Twiki page or directly:
EMu Slice Test -- Status Frank Geurts FNAL/Rice
CSC Shifter Training Course – Global Running Fred Borcherding Reach from CSCOperations Twiki page or directly:
SX5: YE+2Counting House iBoot NPS emu slice0 2 emu slice0 1 Emu dqm Peripheral Crate DMB TMB DMB TMB DMB TMB DMB TMB MPC CCB DMB TMB DMB TMB DMB TMB DMB.
6-Dec-05PC Commissioning1 Peripheral Crate (PC) Commissioning Status Fred Borcherding, CSC/EMU Group.
CMS Week, 3-7 November CSC Trigger Test Beam Report Cast of many.
PSL APA Update May 3, 2016 UW Physical Sciences Lab.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 3, 2013.
University of Wisconsin
Recall: CSC TF Halo rate spikes during run (23 May)
LAV front-end and readout status
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
LST Installation Readiness Review
CSC EMU Muon Port Card (MPC)
Colliding Beams Group Involvement In CMS (see also M
“Golden” Local Run: Trigger rate = 28Hz
EMU Slice Test Run Plan a working document.
CSC Organization in 2013 Jay Hauser To be updated at
University of California Los Angeles
Regional Cal. Trigger Milestone: Major Production Complete
Current Status of CSC Trigger Elements – Quick Summary
Darin Acosta University of Florida
ALCT, TMB Status, Peripheral Crate Layout, CSC Event Display
Regional Cal. Trigger Milestone: Production & Testing Complete
B904 Status Report by Fred B.
CSC Trigger Primitives Test Beam Studies
University of California Los Angeles
TMB and RAT Status Report
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
Regional Cal. Trigger Milestone: Production Complete - U. Wisconsin
CSC Trigger Meeting Summary
Commissioning of the ALICE-PHOS trigger

CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
Fred’s Input to Rice Workshop
CSC Turn ON Status Report by Fred B.
US Rod Burn-in Readiness DAQ Hardware/Power Supplies
Configuring the Peripheral Crates
Sector Processor Status Report
19-April-05 Peripheral Crate Testing, Installation, and Commissioning PC I&C Feb ’06 EMU Fred Borcherding 16-May-19 PC I&C Feb'06.
FED Design and EMU-to-DAQ Test
Equipment Management DB Rack Wizard USC55 Underground Counting Room
Plans for the 2004 CSC Beam Test
Peripheral Crate Testing, Installation, and Commissioning
Prepared for CSC by Fred Borcherding FNAL
CSC Electronics Installation and Commissioning Oct ‘06
CSC Status Report Status reports;
B904 Status Report by Fred B.
CSC Electronics Installation and Commissioning CSCE I&C
CSC DSS Status Report by Fred B.
19-April-05 CSC ME1/1 Meeting
Needed for Team A on -End
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
CSC Electronics Problem Report CSCE I&C
ME I&C -- PC Electronics
Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks
CSC Shift Training and Operation + B904 Status
Presentation transcript:

B904 Status Report by Fred B. 19-April-05 B904 Status Status of CTS All Hardware Installed – most tested All computers working - mostly All online software installed – most tested Gas and HV working Have cosmic ray triggers from CSC > TMB > MPC > TF Plans Continue work on problem in TF (back plane?) L1A requests come from TF board but are not seen in TF CCB Path is TF > TF CCB > LCT > CCB Work on DAQ Update firmware in DDU Get local run going Set up software for calibration runs Begin CSC shifter training Tutorial with me 1 (or 2) on 1 at B904 Can see hardware respond to your input Can ‘play’ with software and hardware Very similar to Pt 5 setup Graduate to Pt5  See more about B904 and Cosmic Test Stand from the web pages CMS Web > MuonWikiHome > MuonCSC > CSCCosmicSlice https://twiki.cern.ch/twiki/bin/view/CMS/CSCCosmicSlice 5-May-2009 B904 Status Report by Fred B.

B904 Status Report by Fred B. 19-April-05 Plan View of B904 CSC has the Area from the front of the Lab room to the wall behind Integration Racks Lab room contains Pcrate test stand (as previously) Storage of boards Electronics work area Lab Open Area CSC Area CSC, Desk, Cabinets CSC Raised Floor Integration Racks 5-May-2009 B904 Status Report by Fred B.

B904 Status Report by Fred B. 19-April-05 B904 Cosmic Test Stand View to lab room View to racks & CSC 5-May-2009 B904 Status Report by Fred B.

B904 Status Report by Fred B. 19-April-05 CTS Racks <= Racks E1A21,22,23 LV TF FED & pcrate => Rack 30 Computers 5-May-2009 B904 Status Report by Fred B.

B904 Status Report by Fred B. 19-April-05 Rack Detail /\ FED < TF < TTC Pcrate > 5-May-2009 B904 Status Report by Fred B.

B904 Status Report by Fred B. 19-April-05 B904 Lab Work station \/ board storage> 5-May-2009 B904 Status Report by Fred B.

B904 Status Report by Fred B. 19-April-05 Pcrate Test Station < Pcrate test station 5-May-2009 B904 Status Report by Fred B.

B904 Status Report by Fred B. 19-April-05 Rest of B904 4/2 ?? 5-May-2009 B904 Status Report by Fred B.

B904 Status Report by Fred B. 19-April-05 Summary B904 is “Ready” Sasha is managing area and keeping it orderly Work area set up > thanks to OSU Board storage areas set up Pcrate test stand re-established Cosmic Test stand ready to start commissioning 5-May-2009 B904 Status Report by Fred B.