Some Special Process Control Procedures

Slides:



Advertisements
Similar presentations
Control Charts for Variables
Advertisements

OPSM 301 Operations Management Class 22: Quality: Statistical process control Koç University Zeynep Aksin
Chapter 9A Process Capability and Statistical Quality Control
Statistical Process Control Processes that are not in a state of statistical control show excessive variations or exhibit variations that change with time.
[1] MA4104 Business Statistics Spring 2008, Lecture 06 Process Monitoring Using Statistical Control Charts [ Examples Class ]
Goal Sharing Team Training Statistical Resource Leaders (2) Peter Ping Liu, Ph D, PE, CQE, OCP and CSIT Professor and Coordinator of Graduate Programs.
Control Charts  Control Charts allow a company’s performance over time to be analyzed by combining performance data, average, range and standard deviation.
 Variable - a single quality characteristic that can be measured on a numerical scale.  When working with variables, we should monitor both the mean.
Chapter 18 Introduction to Quality
originally developed by Walter A. Shewhart
Software Quality Control Methods. Introduction Quality control methods have received a world wide surge of interest within the past couple of decades.
Control Charts for Variables
Chapter 11 Multiple Regression.
Quality Control Methods. Control Charts > X (process location) >S (process variation) > R (process variation) > p (proportion) > c (proportion)
Control Charts.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e KR: Chapter 7 Statistical Process Control.
6.1 Confidence Intervals for the Mean (Large Samples)
X-bar and R Control Charts
1 1 Slide | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | UCL CL LCL Chapter 13 Statistical Methods for Quality Control n Statistical.
Control Charts for Moving Averages
Statistical Process Control
Review of Statistical Inference Prepared by Vera Tabakova, East Carolina University ECON 4550 Econometrics Memorial University of Newfoundland.
Forecasting and Statistical Process Control MBA Statistics COURSE #5.
Process Capability Process capability For Variables
Chapter 36 Quality Engineering Part 2 (Review) EIN 3390 Manufacturing Processes Summer A, 2012.
Statistical Process Control Chapters A B C D E F G H.
CS433 Modeling and Simulation Lecture 16 Output Analysis Large-Sample Estimation Theory Dr. Anis Koubâa 30 May 2009 Al-Imam Mohammad Ibn Saud University.
Copyright © 2010, 2007, 2004 Pearson Education, Inc. Lecture Slides Elementary Statistics Eleventh Edition and the Triola Statistics Series by.
Chapter Six Normal Curves and Sampling Probability Distributions.
Brian Macpherson Ph.D, Professor of Statistics, University of Manitoba Tom Bingham Statistician, The Boeing Company.
Chapter 36 Quality Engineering (Part 2) EIN 3390 Manufacturing Processes Summer A, 2012.
1 Chapter 6 Continuous Probability Distributions.
1 Problem 6.15: A manufacturer wishes to maintain a process average of 0.5% nonconforming product or less less. 1,500 units are produced per day, and 2.
Chapter 4 Control Charts for Measurements with Subgrouping (for One Variable)
Statistical Process Control (SPC). What is Quality?  Fitness for use  Conformance to the standard.
Statistical Process Control
Quality Control  Statistical Process Control (SPC)
1 Some Special Process Control Procedures and s charts Warning limits Control charts for moving averages chart with a linear trend.
Chapter 8 Estimation ©. Estimator and Estimate estimator estimate An estimator of a population parameter is a random variable that depends on the sample.
Les Jones IET 603. Shewhart Control Charts for: characteristics such as: length, width, temperature and volume. 1.Understand the statistical basis of.
Section Copyright © 2014, 2012, 2010 Pearson Education, Inc. Lecture Slides Elementary Statistics Twelfth Edition and the Triola Statistics Series.
Class Six Turn In: Chapter 15: 30, 32, 38, 44, 48, 50 Chapter 17: 28, 38, 44 For Class Seven: Chapter 18: 32, 34, 36 Chapter 19: 26, 34, 44 Quiz 3 Read.
Chapter 7 Estimation. Chapter 7 ESTIMATION What if it is impossible or impractical to use a large sample? Apply the Student ’ s t distribution.
OPSM301 Operations Management Spring 2012
Chapter 5 STATISTICAL INFERENCE: ESTIMATION AND HYPOTHESES TESTING
Quality Control İST 252 EMRE KAÇMAZ B4 /
Math a Discrete Random Variables
Al-Imam Mohammad Ibn Saud University Large-Sample Estimation Theory
Comparing Three or More Means
Agenda Review homework Lecture/discussion Week 10 assignment
ENGM 621: Statistical Process Control
IENG 486: Statistical Quality & Process Control
CONCEPTS OF HYPOTHESIS TESTING
Comparing Three or More Means
Introduction to Probability and Statistics
Problem 6.15: A manufacturer wishes to maintain a process average of 0.5% nonconforming product or less less. 1,500 units are produced per day, and 2 days’
LESSON 20: HYPOTHESIS TESTING
Why Use Them? By: Marcy Bolek – Alloway
Process Capability Process capability For Variables
Basic Training for Statistical Process Control
Basic Training for Statistical Process Control
Process Capability.
Statistics for Business and Economics
Chapter 7: The Normality Assumption and Inference with OLS
Chapter 8 Hypothesis Tests
BENEFITS OF AUTOMATED SPC
Statistical Model A statistical model for some data is a set of distributions, one of which corresponds to the true unknown distribution that produced.
Statistical Model A statistical model for some data is a set of distributions, one of which corresponds to the true unknown distribution that produced.
Chapter 8 Alternatives to Shewhart Charts
Presumptions Subgroups (samples) of data are formed.
Presentation transcript:

Some Special Process Control Procedures and s charts Warning limits Control charts for moving averages chart with a linear trend

and s Chart Why s chart instead of R chart? Range is computed with only two values, the maximum and the minimum. However, s is computed using all the measurements corresponding to a sample. For large samples, s becomes a much better estimator (of standard deviation) than R.

and s Chart The control limits of chart are Note: This can also be written as Where

and s Chart Previously, the value of  has been estimated as: The value of  may also be estimated as: where, is the sample standard deviation and is as obtained from Appendix 3 Control limits may be different with different estimators of  (i.e., and )

and s Chart The control limits for charts are: Where, the values of are as obtained from Appendix 3

and s Chart For variable sample size, each of the is obtained from an weighted average:

and s Chart For nearly uniform samples sizes, may be obtained from unweighted averages: Following is a rule that identifies nearly uniform sample sizes a rule: the largest sample is at least twice the smallest

and s Chart For large samples:

Warning Limits Two sets of limits on charts Outer limits - conventional 3 sigma limits Inner limits - warning limits usually set at 2 sigma Two sets of limits may be confusing. However, they can be very useful too: Two points in succession outside the same inner limit give stronger evidence of a process shift Similarly, strong evidences are two points out of three beyond one inner limit, three out of seven, four out of ten etc.

Problem 10.1: A certain company manufactures electronic components for television sets. One particular component is made to a critical length of 0.450 in. On the basis of past production experiences, the standard deviation of this dimension is 0.010 in. Because of the critical nature of the dimension, the quality control group maintains warning limits on control chart as well as the normal 3-sigma control limits. The chart is based on subgroups of four samples, and warning limits are maintained at two standard deviations from the mean. Compute the warning limits and the control limits for the chart.

Problem 10.2: For Problem 10.1 (a) What is the probability that a subgroup average will exceed the UWL but not exceed the UCL when the process is correctly centered? (b) Supervisor should be notified if (i) 2 successive subgroup averages exceed one of the warning limits or (ii) if one subgroup average exceeds either of the control limits. What is the probability that, when there has been no change in the process, the supervisor will have to be notified because of (i) or (ii)? (c) If the process suddenly shifts to 0.460 with no change in the standard deviation, what is the probability that 2 successive points will exceed the upper warning limit but not exceed the upper control limit?

Reading and Exercises Chapter 10 ( and s charts): pp. 362-368 (Section 10.1-2) 10.3, 10.4, 10.5