Project Name Group Members
Project Schedule Place a Gant chart or table of you project plan on this slide. Indicate where you had to adjust your planning.
Requirements/Specification List what you have implemented so far briefly
Architecture Show a high level architecure (no details please)
Verification Describe briefly how the design was tested Which data did you use and why?
Synthesis Results Area (mm2!!!) Time slack Highest possible clock frequency Bottleneck (critical path)
Layout Screen dump of your current layout, does not to be final
Issues with switching to 65nm