AOFR: Assessment of Operational Field Readiness Fiscal Year 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Quarter 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 Requirements Acquisition Decision Points System Engineering wTechnical Reviews Logistics Events Major Contract Events wRFP Release wContract Award wIBR wProgress Reviews Production wItem Production wItem Delivers Total Production x x x Test Events wFire Fight wReadiness Review CFD IOC POC Technology Development Engineering and Manufacturing Development Production / Development Integrated System Design System Capability and Manufacturing Practices Demonstration LRIP/IOTE FRP MS-A MS-B MS-C SIB SMC IDM CDR IRRP-RX SVR/MDA/ FCA ILA ILA ILA IOC SK MSU CORE CAPABILITY tMU Contract Award LRIP Lot 1 / IOT7E Support LRIP Lot 2 LRIP Lot 3 Contract Awards LRIP ID Contract Award L/Lead Lot 1 x 6 L/Lead Lot 2 x 6 L/Lead Lot 3 x 14 LRIP Fixed Avionics SIL Flight Control SIL Portable Flight Test Avionics SIL MRI Integrated Testing TECHEVAL (notional) AOTR Developmental Technical Evaluation IOCSR IOT&E (notional) Play and LRIP Report ALTT&E waver notification Early OA OA IOT&E / OPEVAL ALTT&E (Componental) ALTT&E (Systems) LPT&E Report AOFR: Assessment of Operational Field Readiness IOT&E: Initial Operational Test & Evaluation PDR: Preliminary Design Review ALPT&E: Alterative Live Pro Test & Evaluation LPT&E: Live Pro Test & Evaluation PRR: Production Readiness Review CDR: Critical Design Review LRIP: Low-Rate Initial Production SFR: System Functional Review EMD: Engineering & Manufacturing Development MDA: Milestone Decision Authority SIB: System Integration Lab FCA: Functional Certification Audit MSD: Material Support Date SRR: System Requirements Review FOT&E: Follow-On Operational Test & Evaluation OA: Operational Assessment SVR: System Verification Review FRP: Full Rate Production OASD(SE): Office of the Assistant Secretary of Defense (Systems Engineering) TD: Technology Development FRR: Flight Readiness Review TECHEVAL: Technical Evaluation GTV: Ground Test Vehicle OPEVAL: Operational Evaluation TRR: Test Readiness Review ILA: Integrated Logistics Analysis OTRR: Operational Test Readiness Review IOCSR: Initial Operation Capability Supportability Review PCA: Physical Configuration Audit