AOFR: Assessment of Operational Field Readiness

Slides:



Advertisements
Similar presentations
Systems Engineering From a Life Cycle Perspective John Groenenboom Director Engineering – Mesa Boeing Rotorcraft Dec 12, 2007.
Advertisements

In order of Appearance: Bob Scheurer Bill Jennings Shawn Simmons
C.B. Cochrane 1 Jan 2009 The 5000 documents have been issued as a directive, two directives, a directive and an instruction, a directive and a regulation,
Phase B Exit Criteria Issues Resolved or Addressed Technical Reviews / Readiness Reviews, Audits Initiate Milestone C Program Review Planning Process Initiate.
“Common Process for Developing Briefings for Major Decision Points” INSTRUCTIONS Provide Feedback via to: Lois Harper PEO C4I and Space
Department of Defense Acquisition Yvette Rodriguez
Chemical Biological Defense Acquisition Initiatives Forum (CBDAIF)
EMIS 7307 T&E Part 2 1 Documents in flux. MNS - Mission need statement –Non system specific, a needed capability. Being replaced by Initial Capabilities.
UNCLASSIFIED Bill McCarthy Bill McCarthy Deputy Director 15 September September 2010 COTF Perspectives.
Configuration Management Non Government Std: EIA Standard-649 “A management process for establishing and maintaining consistency of a product’s performance,
The Defense Acquisition Management System 2009 Implementing DoDI 5000
Peg Johnson, Owner EVMS-Solutions 1 Peg Johnson
Verification and Validation — An OSD Perspective — Fred Myers Deputy Director, Test Infrastructure Test Resource Management Center November 4, 2009.
1 3 Dec 2008 Changes from the May 2003 DoDI Policy Flowing from Numerous New/Revised sections of Public Law since 2003 (some with Multiple Requirements)
PEO C4I and SPACE FULL-RATE PRODUCTION REVIEW TIMELINE
Materiel Development Decision (MDD) Information Requirements
2.1 ACQUISITION STRATEGYSlide 1 Space System Segments.
Business, Cost Estimating & Financial Management Considerations
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
Contracting (Product) Considerations
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
CMQ101 - Course Introduction
Supportability Design Considerations
System Engineering Considerations (See Chapters 3 and 9)
Life Cycle Logistics.
MNS - Mission need statement
Competitive Prototyping – the New Reality
Lesson Objectives Assess the major requirements management activities during the acquisition process from Milestone B to Initial Operational Capability.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities April 25, 2017.
Lesson 9 Production and Deployment (P&D) Exercise Team #
Milestone A to Milestone B Requirements Management Activities
Milestone A to Milestone B Requirements Management Activities
Production Considerations
Milestone A to Milestone B Requirements Management Activities
Lesson 9 Production and Deployment (P&D) Exercise Team #
ISA 201 Intermediate Information Systems Acquisition
New Space Systems Acquisition Policy
AMRU Release 2 Release Report
DAG CH 3 Figure 11: Weapon System Development Life Cycle
Importance of T&E Connotations
CPFF,CPIF,CPAF FPIF FFP,FPIF FFP CPFF FPIF,FPAF FFP FP (EPA)
8/7/2018 Test and Evaluation Working Integrated Product Team (T&E WIPT) An Integral partner on the PM’s Team A T&E WIPT is an integral partner on the.
Milestone B to Full Operational Capability (FOC) Requirements Management Activities RQM-310, December 2016.
Test and Evaluation Considerations
DAG CH 3 Figure 17: Weapon System Development Life Cycle
DAG CH 3 Figure 23: Weapon System Development Life Cycle
Information Required for Milestone and Decision Reviews
CBA ICD CDD CDD CPD MDA MDA MDA MDA MDA AoA RVA RVA RVA
DAG CH 3 Figure 13: Weapon System Development Life Cycle
DAG CH 3 Figure 19: Weapon System Development Life Cycle
Product Support Considerations
Initial JE-RDAP ORDER Projections (For Informational Purposes Only - This list is subject to change, JE-RDAP Orders will be awarded to future JE-RDAP IDIQ.
DAG CH 3 Figure 18: Weapon System Development Life Cycle
Technical Management Processes
International Acquisition and Exportability (IA&E) Considerations
DAG CH 3 Figure 28: Weapon System Development Life Cycle
Lockheed Martin Canada’s SMB Mentoring Program
מרעיון למוצר דני חייט.
DAG CH 3 Figure 15: Weapon System Development Life Cycle
8 Tech Processes Drive Acquisition
Some Practical Considerations for Systems Engineers in a Lean-Agile Airborne Weapons System Program June 12, 2018 Ken Garlington.
DAU Section 804 Middle Tier Acquisition Discussion
The Department of Defense Acquisition Process
Perspectives on Transforming DT and OT Industry-Government Roundtable
DAG CH 3 Figure 21: Weapon System Development Life Cycle
DAG CH 3 Figure 27: Weapon System Development Life Cycle
DAG CH 3 Figure 22: Weapon System Development Life Cycle
DAG CH 3 Figure 25: Weapon System Development Life Cycle
Presentation transcript:

AOFR: Assessment of Operational Field Readiness Fiscal Year 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Quarter 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 Requirements Acquisition Decision Points System Engineering wTechnical Reviews Logistics Events Major Contract Events wRFP Release wContract Award wIBR wProgress Reviews Production wItem Production wItem Delivers Total Production x x x Test Events wFire Fight wReadiness Review CFD IOC POC Technology Development Engineering and Manufacturing Development Production / Development Integrated System Design System Capability and Manufacturing Practices Demonstration LRIP/IOTE FRP MS-A MS-B MS-C SIB SMC IDM CDR IRRP-RX SVR/MDA/ FCA ILA ILA ILA IOC SK MSU CORE CAPABILITY tMU Contract Award LRIP Lot 1 / IOT7E Support LRIP Lot 2 LRIP Lot 3 Contract Awards LRIP ID Contract Award L/Lead Lot 1 x 6 L/Lead Lot 2 x 6 L/Lead Lot 3 x 14 LRIP Fixed Avionics SIL Flight Control SIL Portable Flight Test Avionics SIL MRI Integrated Testing TECHEVAL (notional) AOTR Developmental Technical Evaluation IOCSR IOT&E (notional) Play and LRIP Report ALTT&E waver notification Early OA OA IOT&E / OPEVAL ALTT&E (Componental) ALTT&E (Systems) LPT&E Report AOFR: Assessment of Operational Field Readiness IOT&E: Initial Operational Test & Evaluation PDR: Preliminary Design Review ALPT&E: Alterative Live Pro Test & Evaluation LPT&E: Live Pro Test & Evaluation PRR: Production Readiness Review CDR: Critical Design Review LRIP: Low-Rate Initial Production SFR: System Functional Review EMD: Engineering & Manufacturing Development MDA: Milestone Decision Authority SIB: System Integration Lab FCA: Functional Certification Audit MSD: Material Support Date SRR: System Requirements Review FOT&E: Follow-On Operational Test & Evaluation OA: Operational Assessment SVR: System Verification Review FRP: Full Rate Production OASD(SE): Office of the Assistant Secretary of Defense (Systems Engineering) TD: Technology Development FRR: Flight Readiness Review TECHEVAL: Technical Evaluation GTV: Ground Test Vehicle OPEVAL: Operational Evaluation TRR: Test Readiness Review ILA: Integrated Logistics Analysis OTRR: Operational Test Readiness Review IOCSR: Initial Operation Capability Supportability Review PCA: Physical Configuration Audit