Volcanic Lake ROV Product Design Specifications - Winter 2012
Preview General Information Mission Statement Product Design Specification House of Quality Technical Risk Management
General Information Boiling Springs Lake - Lassen Volcanic National Park Temperature: 120ºC pH: 2
2007 Trip
Existing ROV
Mission Statement Design and manufacture a Water and sediment collector compatible to the existing ROV
Product Design Specifications Temperature Probe Depth Level Real Time Transmission Collection Canister Sample Collector
House of Quality
Technical Risk Management Risks consequences Possibility Level of risk Team communication Severe Possible High Product is not delivered on time Unlikely Medium Project cost exceed budget Likely ROV fails when testing Catastrophic Product is unable to manufacture