VELO Software Status Some highlights of recent work

Slides:



Advertisements
Similar presentations
Digital Filtering Performance in the ATLAS Level-1 Calorimeter Trigger David Hadley on behalf of the ATLAS Collaboration.
Advertisements

Update of EXT Stripline BPM Electronics with LCLS-style Digital BPM Processors Glen White, with slides by Steve Smith 15 December 2009 ATF2.
TOF offline and calibration A. De Caro (University and INFN of Salerno)
1 Summary on the Wednesday access of BBC FEM 07/28/05 Kazuhisa Yamaura Koutaro Kijima Daisuke Watanabe Misaki Ouchida.
Update on Analysis of FNAL TB09 Jianchun Wang for the group Syracuse Univesity Jan 29 th,2010.
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
TB analysis update Gwen & Alessandra VELO Group Meeting, Monday October 6 th first fits of the landaus header correction algorithms irradiated RD50: status.
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* CMS EMU Meeting The Ohio State University April 16 – 17, 2004.
A preliminary analysis of the CALICE test beam data Dhiman Chakraborty, NIU for the CALICE Collaboration LCWS07, Hamburg, Germany May 29 - June 3, 2007.
1 Analysis code for KEK Test-Beam M. Ellis Daresbury Tracker Meeting 30 th August 2005.
VELO ADC vs Charge Calibration Jianchun Wang April 16, 2008 This is an update to the presentation at April 11 st VELO Group Meeting. A new scan data of.
Identifying anomalous strips David Stuart, Noah Rubinstein University of California, Santa Barbara June 18,
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* CMS EMU Meeting The Ohio State University April 16 – 17, 2004.
CFT Calibration Calibration Workshop Calibration Requirements Calibration Scheme Online Calibration databases.
SVX Software Overview Sasha Lebedev VTX meeting 09/07/ SVX Software web page:
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
Real data reconstruction A. De Caro (University and INFN of Salerno) CERN Building 29, December 9th, 2009ALICE TOF General meeting.
Chris Parkes for VELO software Group VELO Software Overview & Shutdown Planning Organisation Milestones 3 Critical Areas.
Chris Parkes First results from the LHCb Vertex Locator Act 1: LHCb Intro. Act 2: Velo Design Act 3: Initial Performance for LHCb VELO groupVienna Conference.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
Prediction W. Buchmueller (DESY) arXiv:hep-ph/ (1999)
1 xCAL monitoring Yu. Guz, IHEP, Protvino I.Machikhiliyan, ITEP, Moscow.
GLAST LAT Project LAT Instrument Analysis Workshop – Feb 27, 2006 Hiro Tajima, TKR Data Processing Overview 1 GLAST Large Area Telescope: TKR Data Processing.
LM Feb SSD status and Plans for Year 5 Lilian Martin - SUBATECH STAR Collaboration Meeting BNL - February 2005.
1 A first look at the KEK tracker data with G4MICE Malcolm Ellis 2 nd December 2005.
Online System Status LHCb Week Beat Jost / Cern 9 June 2015.
M. Ellis - MICE Collaboration Meeting - Thursday 28th October Sci-Fi Tracker Performance Software Status –RF background simulation –Beam simulation.
LHCb VELO Upgrade Strip Chip Option: Data Processing Algorithms Giulio Forcolin, Abdul Afandi, Chris Parkes, Tomasz Szumlak* * AGH-Krakow Part I: LCMS.
Peter W. PhillipsATLAS SCT Week, CERN, September/October 2002 Electrical Tests of SCT modules using RODs Peter W Phillips Rutherford Appleton Laboratory.
David Hutchcroft 1 VELO software. Lite clusters in Kalman fit 2 The VELO clusters are available both as a lite and “full” version Two consecutive blocks.
CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 1/15 Jeroen van Tilburg (Universität Zürich) LHCb: Preparation for LHC.
FIRST RESULTS OF THE SILICON STRIP DETECTOR at STAR Jörg Reinnarth, Jonathan Bouchet, Lilian Martin, Jerome Baudot and the SSD teams in Nantes and Strasbourg.
Summary of User Requirements for Calibration and Alignment Database Magali Gruwé CERN PH/AIP ALICE Offline Week Alignment and Calibration Workshop February.
Chris Parkes, Silvia Borghi, Christoph Hombach WP2 Alignment Task: Status Report Introduction Alignment Monitoring – LHCb VELO Weak Modes – LHCb VELO AIDA.
06/2006I.Larin PrimEx Collaboration meeting  0 analysis.
Online Consumers produce histograms (from a limited sample of events) which provide information about the status of the different sub-detectors. The DQM.
S.MonteilPS COMMISSIONING1 MaPMT-VFE-FE ELECTRONICS COMMISSIONING AND MONITORING. OUTLINE 1)Ma-PMT TEST BENCHES MEASUREMENTS 2)VFE AND FE ELECTRONICS FEATURES.
A novel approach to detector calibration parameter determination and detector monitoring Eduardo Rodrigues On behalf of the LHCb VELO Group CHEP 2010,
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
Aras Papadelis, NIKHEF Jaarvergadering 19/12/06 1 Fresh results from the LHCb Vertex Locator test beam Aras Papadelis Ann Van Lysebetten, Anne Keune, Eddy.
ST Analysis: Introduction M. Needham EPFL. Outline Aims of the meeting Releasing code Performance Monitoring Results (IT and TT): Active fraction, noise.
Custom Classes DetectorShapeView2D: Detector mouseover callbacks (default is mouse click). EventControl:
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
L1Calo Databases ● Overview ● Trigger Configuration DB ● L1Calo OKS Database ● L1Calo COOL Database ● ACE Murrough Landon 16 June 2008.
L1Calo DBs: Status and Plans ● Overview of L1Calo databases ● Present status ● Plans Murrough Landon 20 November 2006.
DB and Information Flow Issues ● Selecting types of run ● L1Calo databases ● Archiving run parameters ● Tools Murrough Landon 28 April 2009.
L1Calo Databases ● Overview ● Recent Activitity ● To Do List ● Run types Murrough Landon 4 June 2007.
ATLAS Tile Calorimeter Data Quality Assessment and Performance
Rainer Stamen, Norman Gee
ST software status, Jeroen van Tilburg
Tomasz Szumlak (Glasgow University)
CMS Luminosity Status Report
On behalf of the LHCb VELO project
Project definition and organization milestones & work-plan
Marcin Chrząszcz Cracow University of Technology Itamar Levy
Massimo Masera INFN sezione di Torino
Commissioning of the ALICE HLT, TPC and PHOS systems
Remaining Online SW Tasks
Roberto Chierici - CERN
X5 quasi offline Analysis
LHCb Velo: commissioning, performance and High flux tests.
Alon Attal Martin von der Mey Jay Hauser Mike Lindgren
CMS Pixel Data Quality Monitoring
Commissioning of the ALICE-PHOS trigger
The CMS Tracking Readout and Front End Driver Testing
VELO Software Update TELL1 Algorithms Error analysis
Current Status of the VTX analysis
The LHCb Front-end Electronics System Status and Future Development
First results from the LHCb Vertex Locator
Presentation transcript:

VELO Software Status Some highlights of recent work LHC beam on absorber data (TED) Alignment Timing TELL1 Algorithms & Uploading Monitoring Current/future Focus areas Error Banks Noisy Strips Simulation/reconstruction activities

Highlights Selected highlights, illustrated with TED run performance See slides of talks this week: Aras – Traversing Track Finder (velo commisioning meeting) Tomasz – Vetra Python Configurables Silvia – TED results James – Velo Monitoring

LHC beam on absorber: 6th & 7th June Total ~ 60k Tracks (last year ~2000) Single bunches every 48s Typically 5x109 particles per bunch Time alignment events +/-2 Bunch trains 12 consecutive bunches 25ns spacing Mostly 1x1010 particles per bunch, some 5x1010 particles per bunch See talk from Silvia Borghi on Thursday

First determination of separation of two VELO halves Silvia Borghi & Aras Papadelis V. Preliminary Separation was set to 2mm in motion system (photogrametry error +/- 200μm) Reconstruct with Histogram & Millepede Method Use tracks traversing both halves of VELO (New pattern recognition Aras Papadelis) Data taken in two VELO positions Difference reconstructed by Silvia at 450 chocolates

Velo timing calibrated Kazu Akiba & Ivan Mous Velo timing calibrated to +/- 2ns Timed to ~ +/- 2ns Data taken at 4 timing steps 0, 6.5, 12.5, 19 ns Fit pulse shapes Fast turn around on procedure Cross-checked for stability with later data sample

TELL1 Algorithm Parameters Tomasz Szumlak, Kurt Rinnert Mean Value of Pedestals Bad A-Link masked Automated (and documented) procedure to determine TELL1 Algorithm parameters Pedestals, Clustering Thresholds determined on a noise run with Vetra Noisy strips, A-links masked out Xml produced, stored in database and uploaded to TELL1, read back and verfied Configuration of Vetra – see slides of talk from Tomasz on Tuesday

Extensive use of Online & Offline Monitoring Offline on plus – 5 min turnaround Plots from one example run Kurt Rinnert Eduardo Rodrigues Most probable value of Landau 30-35 ADC counts See talk from James Mylroie-Smith on Thursday

Current/future activities 50+ milestones over next months Pick a few items….

Error Banks Aim: develop effective monitoring for Beetle errors Chiara Farinelli Ann van Lysbetten Aim: develop effective monitoring for Beetle errors Velo Error banks sent out by TELL1 if problems occur Beetle Desynchronisation FIFO errors Headers not decoded Error banks turned off for TED run Decoding in place (Tomasz Szumlak) Progress made on understanding all three error types Monitoring in Development

Noisy Strips/Links Sara Traynor James Keaveney Issues: Noisy strips that give high occupancy Bad Analogue Links (groups of 32 channels) Stuck Bits on digitisation cards Monitoring under development based on noise measurements with additional input from module construction And on occupancy Initial masks & monitoring in place for TED

Simulation/Reconstruction Activities Clustering (Tomasz Szumlak) (finally) move to TELL1 Velo clustering algorithm Study delta ray effect (David Hutchcroft & James Mylroie-Smith) Evaluate effect Material Description updates (Tom Latham, Mark Whitehead) Pile-up, Tank, rf-foil Pattern Recognition (David Hutchcroft) Improve standard VELO algorithms Integrate new work from Aras

Summary TED run demonstrated performance of 3 critical areas TELL1 Parameters Timing Monitoring Additional highlight – alignment -separation of VELO halves Still much to be done… Error Banks Noisy Strips Simulation/Reconstruction Activities