UCSD Medical Center - Hillcrest Campus Case Study Gerry White Facilities Design & Construction University of California, San Diego.
Advertisements

S. L. King & Associates, Inc. Engineers Planners Managers Aviation Safety, Security & The Environment Asset Management and Planning of Utilities Infrastructure.
Pentagon Washington, D.C. UMCS contract for modernization of the Pentagon Scope includes: Design, engineering and commissioning of the Building Operations.
Integration of CHP Into Waste Water Treatment Processes London 5 th November 2014 Peter Bense.
Worldwide Applied Systems Group 1 Comprehensive Comfort Solutions Trane’s Global ESCO Strategy Don Anderson Global Process Owner.
Alabama Department of Economic and Community Affairs.
LESSONS LEARNED ON GOING GREEN Kevin Meikle, Architect Airports Planning Manager 4995 E. Clinton Way Fresno, Ca (559)
Franklin County Technical School Performance Contract Project.
ORNL ESPC Overview GovEnergy ESPC Project Summary  $89M project funded by $8.2M in guaranteed annual savings  Energy Conservation Measures: 1.Select.
Energy Security & Resiliency A Conceptual Plan to Provide Affordable Infrastructure Resiliency, while Ensuring Persistence of Mission Capabilities within.
Month Year Working together to achieve your desired outcomes, by delivering service excellence. Building Engineering Solutions for the optimisation of.
The Role of Tenant and Property Operations in Implementing Sustainable Practices Public Building Services October. 17, 2007 Om Taneja PBS Tenant and Property.
Katrina Pielli U.S. Environmental Protection Agency CHP Partnership
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 14 Energy Efficiency Module 14: DEMAND-SIDE MANAGEMENT.
Performance Contracting The Honeywell One Source Solution.
Green School Design Gary A. Jerue ED 846 Spring 2010.
Upstate Energy Expo 2010 NYSERDA Program Overview March 30, 2010 Cheryl Glanton, Project Manager.
Steve Craker K-12 Team Lead Geoff Overland IT and Data Center Focus on Energy Increase IT Budgets with Energy Efficiency.
“Specializing in Operational Excellence” Outsourcing Is it right for you? Texas Technology Showcase Houston, Texas March 18, 2003 Integrated Process Solutions.
“Biomass in our Schools” EPMA Presentation Presented by: April 10, 2013.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
October 2007 Energy Efficiency Partnership For Greater Washington.
Regulatory Flexibility Committee Competitive Procurement September 18 th Joe Kerecman Director Government and Regulatory Affairs
PASBO Building Considerations for Vo-Tech Education March 17, 2011 Pat Adams Dave Kramer Collin Sandifer.
Working to your advantage. The Vital Link in the Supply Chain Graybar is a leading distributor of electrical, and security products. We help customers.
A N N I S T O N A R M Y D E P O T Environmental Management System Implementation at Anniston Army Depot April 8, 2004.
Phoenix Convention Center Phoenix, Arizona Solution Showcase GSA’s NDER Program: Doubling the Energy Savings from Financed Projects Kevin Vaughn Schneider.
Energy efficiency in buildings Monga Mehlwana Tuesday, 05 October 2010.
Biomass CHP Project at Pilgrim Hospital Boston United Lincolnshire Hospitals NHS Trust.
Overview of Distributed Generation Applications June 16, 2003 Harrisburg, PA Joel Bluestein Energy and Environmental Analysis, Inc.
0 This document is confidential and is intended solely for the use and information of the client to whom it is addressed. Public-Public and Public-Private.
© 2008 Cisco Systems, Inc. All rights reserved.Cisco ConfidentialPresentation_ID 1 Acquiring for your technology doesn’t need to be challenging…
Energy and Air Quality Conference April 5, 2004 Innovative financing, support, and solutions for Implementing Energy Projects.
Energy Management Sara Hudson Christine Richardson Colleen Tiernan Joanna Wirkus.
The Christman Company - Green MSU’s Greening the Supply Chain Conference April 21, 2014.
Utah State University Logan Utah. Founded 1888 as a Land Grant Institution Host City – Logan, Utah (48,ooo+ population) ~ 15,000 Students (~ 28,700 students.
Johnson Controls, Inc. — 1 1/6 2/6 4/6 5/6 1/4 3/4 1/2 WAHOO PUBLIC SCHOOL SENIOR/JUNIOR HIGH & ELEMENTARY ENERGY PERFORMANCE CONTRACT FEASIBILITY March.
04/16/ Planning New Generation APPA Operations & Engineering Conference April 10, 2006 Jay Hudson, PE Manager, Environmental Management.
Energy and Environmental Solutions Company Confidential—Siemens Building Technologies 2008 SLS 242/342: Performance Contracting - Proposing Opportunities.
Harness the Power of your Operating Budget to Enhance your Learning Environment MASBO Winer Conference – Jackson, MS.
Green Building: What does the Fourth Little Pig Need to Know Before Choosing a Green Home.
Parts Management Agreements
APTA Sustainability Workshop 2016
Sustainable Future – Trends and Reality
Irvine Ranch Water District Distributed Energy Storage Case Study
EDENTON-CHOWAN SCHOOLS
Metrus Energy – Selling Energy Efficiency “As-a-Service”
Guaranteed Energy Savings Performance Contracting
FUEL CELLS.
Energy Saving Bureau Industrial energy audits in coherence with Directive on the promotion of end-use efficiency and energy services.
UMCP Learning Objectives
Toronto Waterfront Scan and Environmental Improvement Strategy Project - Economic Opportunity in a Sustainable Waterfront Presentation to the Federation.
DOE Data Center Energy Efficiency Program and Tool Strategy
Affordable Energy Production from Renewable Fuel
Implementing Effective Energy O&M Strategies on a Limited Budget
FUNDING FOR ENERGY UPGRADES
Horizon 2020 Information Day

GUARANTEED ENERGY SAVINGS Performance Contracting
APTA Sustainability Workshop 2016
Enron Energy Services Energy Management Outsourcing Overview
Improving Energy Reliability & Performance
State Allocation Board Hearing Solar Energy and Energy Efficiency Project Options for California Schools Mark Johnson, Energy Solutions Manager - Schools.
Energy Conservation CERD /12/2017
Plug & Play CHP? Is Your Pocket About to be Picked?
State of Vermont Energy Stimulus Plan
EDENTON-CHOWAN SCHOOLS
No out of pocket cost No payback period Generate $$$ in energy savings Eliminate your electric bill Give you money annually to spend on other things.
The Project Overview and Status Report
Energy Management Introduction Rantharu Attanayake BSc. (Eng), MSc, MBA EE – Energy Management Mobile :
Presentation transcript:

Improving Energy Reliability & Performance

Energy & Environmental Solutions Part of the Siemens history Over 100 years of providing Energy Management Systems and Services Historical advocate and proponent of energy conservation in facilities Documented $1 Billion in energy cost savings in past 10 years Early energy innovator – Siemens holds over 6000 energy related patents

Cooperation in a spirit of partnership Our mission is to help our customers reduce energy costs while improving reliability and performance and minimizing the impact on the environment.

Total Energy Resource Value Chain Management The EES Offerings Total Energy Resource Value Chain Management Rate Analysis Gas and Electric Procurement Alternate Fuel Analysis Incentives/Rebates M&V Benchmarking Mechanical upgrades/retrofits Electrical system upgrades Controls/EMS Sustainability Renewable Energy LEED Certification Energy Star Risk mitigation Reliability Finance

Demand Side Management Mechanical System upgrades/retrofits Electrical upgrades Controls and automation development System Integration Building Infrastructure Other capital improvements The financial model of a classical Performance Contracting Solutions

Performance Contracting which finance Modernizations in  Building automation and control  Heating, refrigeration  Ventilation, air conditioning  Water treatment  Lightning  Energy management  Service Savings in  Heating  Electricity  Refrigeration  Water  Compressed air  Operation results in

Performance Contracting Modernization financed with energy savings  Modernization enhances building value Savings pay back investment No risk thanks to guaranteed savings Sustainable quality assurance due to energy management Secure investment budget

Major Energy Projects Capability Onsite generation - Under a single source of responsibility, Siemens can provide turnkey services for. Concept development and strategic energy master planning Design\build Comprehensive maintenance services Operations services Renewable energy sourcing Gasification of solid fuels (carpet, tires) and biomass Landfill gas, digester gas and other methane gas projects Financial Programs Energy Asset Programs - Integrates technical and financial elements under a single contract agreement with the client. Utility Service Agreement – payment based upon availability of the delivered utility or energy stream.  Siemens retains the risk and burdens associated with owning and maintaining energy asset. We now get to the specifics of the major projects offering. The best starting point, and one of the key reasons for the customer to avoid “tendering” a central plant, is the idea that concept development and strategic energy planning are key elements of a new central plant. Strategic energy planning encompasses many things, including reliability needs analysis, distribution infrastructure analysis (present and future), load growth strategies, financial analysis, operational requirements, etc. A central plant, properly built and operated, involved much more than simply selecting and installing equipment. We are also able to guarantee program outcomes. Such guarantees can take the form of guaranteed equipment performance and efficiency, capacity availability, and potentially dollar savings. The financial aspects of these programs are also important. Many different financing options and mechanisms are available; determining the suitability of any given option requires understanding the client’s current financial needs. Issues of cash flow, tax implications, accounting treatment (ie on- or off-balance sheet), impact on bond rating, and others, all need to be considered when assembling the right financial solution.

Projects Siemens has created and guaranteed the efficient operation of dozens of high reliability energy facilities including: Landfill and Wastewater Methane gas Electrical and steam Generation Co-generation Central Utility Plants and Distribution Steam Chilled Water Thermal Storage Gasification Carpet scraps to Steam (under construction)

Customer Benefits Stabilized energy costs and supply reliability We can provide fixed operating costs and stabilized energy costs Reduced downtime, enhanced comfort Single source accountability for guaranteed results Siemens is responsible for asset value and equipment performance We regularly measure and report on our actual performance compared to predicted Integrated energy and building management strategies Central plant design, construction, operation and maintenance are parts of a larger strategy to enhance overall facility performance Speed We can implement solutions much faster than traditional contracting Innovative financial solutions We can provide a wide range of financing options to help preserve capital for the core business mission These points constitute the basic value proposition. The relative importance of these points will vary depending on the client and his circumstance. Healthcare clients, for example, tend to value reliability and predictability of supply very highly.

Sample Projects Monroe County Shaw Industries Two new combined heat and power plants, incorporating three 1.35 MW generators and associated heat recovery equipment at each site. Heating is provided by three 350 hp high-pressure steam boilers. Approx $21.5 million Shaw Industries Waste-to-energy plant providing 50,000 pounds per hour of process steam for a 24 hour a day, 5 day per week operation. Provides steam base load (approximately 70%) for Shaw’s carpet manufacturing facility. We guarantee quality, reliable steam to Shaw’s plant for 10 years, and we provide a 10-year comprehensive maintenance program. St. Elizabeth Health Center New cooling plant, lighting and control retrofits, water conservation and new waste management equipment have reduced labor by 5 FTE’s and saved over $1.2 m annually in energy and operations costs.