THE ANTARES SITE SECONDARY JUNCTION BOX

Slides:



Advertisements
Similar presentations
John A. Orcutt Deputy Director, SIO Ocean Observations Initiative NSF MREFC Chair, NSF/CORE DEOS Comm.
Advertisements

MeDON Phase II - Outline MeDON Partners Meeting, Plymouth. March 8 th 2012 Chris Gallienne, PML An initial investigation of potential development of MeDON.
MeDON meeting 09 mars IFREMER PROGRESS REPORT WP 3.5 dev & fabrication of the proof of concept architecture and description electronics and sofware.
Communication & Storage Front-end, 2 nd generation Jérôme Blandin, Julien Legrand, Laurent Gautier Ifremer COSTOF2 Handling large amounts of data with.
Jan 2009 U. Katz: Astroparticle Physics 1 What is KM3NeT – the Vision  Future cubic-kilometre sized neutrino telescope in the Mediterranean Sea  Exceeds.
Networking for Ocean Bottom Observatories Taken from the Cabled Observatory Presentation School of Ocean and Earth Science and Technology February 2006.
6/10/2003 – e.heineVLVnT facility-power1 EFNI H K Introduction Hypothesis Topology, technical constrains Redundancy, budget constrains Grounding Reliability.
Introduction to future synergy options Uli Katz ECAP, Univ. Erlangen Deep Ocean Cabled Observatories Amsterdam, May 2012.
All Regions Workshop #2, 5-7 Oct , Paris, France G. Riccobene – LNS / INFN The East Sicily Node Facilities Giorgio Riccobene INFN-LNS, Catania
LIGURIAN NODE : MULTIDISCIPLINARY SCIENCE Dominique Lefèvre LMGEM Christian Tamburini LMGEM Anne Robert LMGEM Stéphanie Escoffier.
Hanoi, Aug. 6-12, 2006 Pascal Vernin 1 Antares Status report P.Vernin CEA Saclay, Dapnia On behalf of the Antares collaboration P.Vernin
1 Product & Technology Quality Excellence Support American Global Products Product & Technology TeSysPort Ethernet Interface for TeSys June 5, 2007.
Overview of PlanetLab and Allied Research Test Beds.
V.Bertin CPPM / ANTARES Coll. - Moriond ANTARES : A deep-sea 0.1 km² neutrino telescope Vincent Bertin - CPPM-Marseille on behalf of the Antares.
The HEAP-MM proposal P. Piattelli VLVnT The call  INFRA Research Infrastructures for astroparticle physics: High energy cosmic rays,
Labeled Test-site of the European projects ESONET & EMSO Dr. Juanjo Dañobeitia UTM – CSIC & SARTI (UPC) SPAIN.
OOI Annual Review Year 2 May 16 – 20, 2011 Ocean Observatories Initiative Surface and Subsurface Mooring Telemetry Inductive and acoustic technology and.
A sensor architecture for neutrino telescopes on behalf of the KM3NeT consortium Els de Wolf Thank you, Claudio!
25 km E offshore Catania 2000 m depth TSS Frame Buoy Junction Box e.o. connection e.o. cable from shore Shore laboratory, Port of Catania e.o. cable.
Laura Beranzoli Istituto Nazionale di Geofisica e Vulcanologia October 5-7, 2009ESONET NoE - 2nd All Region Workshop WP4 – Demonstration Missions.
Maintenance of the ANTARES deep-sea neutrino telescope 1 Marco Circella --- INFN Bari on behalf of the ANTARES Collaboration.
IES Integration of research activities on a long-term perspective Co-operation between universities, research institutes, enterprises and technology organisations.
Overview – HOT Site Hawaii Ocean Time-series “HOT” Site –3 Stations: Kahe, Kaena & ALOHA –monthly cruises for 15 years –ALOHA Station 100km N of Oahu.
Green Cables for ocean and climate monitoring and disaster warning Erica Campilongo, ITU.
August 3, March, The AC3 GRID An investment in the future of Atlantic Canadian R&D Infrastructure Dr. Virendra C. Bhavsar UNB, Fredericton.
1 Recommendations Now that 40 GbE has been adopted as part of the 802.3ba Task Force, there is a need to consider inter-switch links applications at 40.
Authorities point of view How TOSCA can be a relevant tool for antipollution control? -> Commissaire Général (Ret) Alain VERDEAUX, PREMAR MED Authorities.
Antares Slow Control Status 2007 International Conference on Accelerator and Large Experimental Physics Control Systems - Knoxville, Tennessee - October.
The KM3NeT consortium ( - supported through the European Union's 6th framework programme in a 3-year Design Study - aims at the construction.
Towards a model for European Seas Observatory Network Implementation Michael Gillooly, Glenn Nolan and ESONIM team A Specific Support Action funded under.
Unit 19 Computer Music Systems 1 Examine the hardware options available for the composition and production of music using computer technology assess the.
International Oceanographic Data and Information Exchange - Ocean Data Portal (IODE ODP) Enabling science through seamless and open access to marine data.
What? Deployment of the first full KM3NeT string, a.k.a Detection Unit. Thanks to Aart Heijboer for the nice drawings!
VLVnT08 Transformative Ocean Science through the VENUS and NEPTUNE Canada Ocean Observing Systems Martin Taylor President and CEO Ocean Networks Canada.
Status and Advances on the Acoustic Positioning System for KM3NeT Giuseppina Larosa, IGIC-UPV KM3NeT General Meeting, Nikhef 28-31/03/2011.
KM3NeT-Toulon Infrastructure 22/06/121 NB: focus on latest developments, see February presentation in Catania for details KM3NeT meeting Erlangen,
Seafloor Network KM3NeT Italia Strategy, Milestones and Cost R. Papaleo 22 june 2012.
M. Circella – ANTARES connectionINFN Comm. II, 5/6/2008 The ANTARES Connection Marco Circella --- INFN Bari 1.
SEA operations – June 2012 Short summary report R. Papaleo 22 june 2012.
Site for the PPM-DU String Layout Possible Site / Properties Power / Communication Contribution / Planning R.Papaleo, P.Lamare, E.Heine Bologna.
Earth-Sea Science Junction Boxes
Deep sea infrastructure: ROV M. Musumeci KM3NET meeting Paris October 2008.
WP F/L Seafloor network, deployment vessels and ROVs for PPM P. Lamare – CEA Irfu 1WPF/L- PPM DU site- P. Lamare30/03/2011.
CLB/DAQ meeting, Paris APC, 05 September DAQ in infrastructure and DU foot P. Lamare (CPPM)
CAMBIUM NETWORKS RURAL BROADBAND: CONNECT THE UNCONNECTED AND UNDERCONNECTED SIMON STADDON REGIONAL TECHNICAL MANAGER UK, IRELAND & NORDICS.
Shebli Anvar – CEA Saclay, Irfu On behalf of the KM3Net Consortium
ECHORD++: An Experiment in Robotics Innovation
Some developing ideas on Seafloor cabling and copper/fibreoptic split points where this talks builds and borrows from the work of VENUS, MARS, NEPTUNE.
Deep-sea neutrino telescopes
MARIGOLD the MEUST deep sea network
USNA Next Generation Ground Station
OpenLab Enterasys Meeting
Work Package 2 TECHNOLOGICAL HARMONISATION Reporting period
Pasquale Migliozzi INFN Napoli
Marine and Environmental Agencies
Satellite communications: WMO-IOC Satcom Forum
Interdisciplinary Activity ANTARES
Proof of Concept – preliminary NIIFI plan
Catania Jan ’14 KM3NET Italy Marine Operations CTF change out
Design and realization of Payload Operation and Application system of China’s Space Station Wang HongFei 首页.
A New Era in Critical Communications
Expandable Seafloor Observatory
Internet2 Cloud Integration Plans
Junction Boxes for KM3NeT
SwafS : Mobilising Research Excellence in EU Outermost Regions (OR)
Design central EMODnet portal Objectives and Technical description Initial draft prepared by the Flanders Marine Institute.
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Coordination : R. Person & I. Puillat
AKSUM UNIVERSITY ICT Directorate Oct 10, 2018 Axum, Tigray, Ethiopia
On-Site Facilities for Pre-production deployment
Presentation transcript:

THE ANTARES SITE SECONDARY JUNCTION BOX A DEEP SEA TEST BED FOR ESONET INSTRUMENTATION DEVELOPMENTS Meeting in CPPM _ Demonstration mission in ESONET 16 sept 2008

Meeting in CPPM _ Demonstration mission in ESONET 16 sept 2008 Objectives To take benefits of the ANTARES infrastructure in order to propose cabled access by great depth to scientific, technological and industrial tests and demonstrations, with remote-control from the shore Without any disturbance for the telescope Main partners : Ifremer , CPPM , Geosciences Azur , INSU Sponsored by Region PACA Meeting in CPPM _ Demonstration mission in ESONET 16 sept 2008

BJS general principles and specifications No disturbance for the telescope thanks to precise & planned control of the equipments deployment, connecting and operating Offering at least 4 downlink interfaces compatible with emerging standards for science instrumentation net nodes Power 1KW 300 to 400VDC and data thru 100Mb Ethernet Options to be investigated : 48 VDC FO 1000Mb Ethernet DeepSeaNet instrumentation network shore link access Meeting in CPPM _ Demonstration mission in ESONET 16 sept 2008

Proposed general lay out Michel PACHA Shore station Antares Exp. Antares UW cable Antares JB BJS and users MMI & Control DeepSeaNet Opt Fiber link DeepSeaNet Node BJS Deepseanet User Exp User Exp User Exp Meeting in CPPM _ Demonstration mission in ESONET 16 sept 2008

Meeting in CPPM _ Demonstration mission in ESONET 16 sept 2008 Schedule Organization set up (Infrastructure Access Service /SAI & Access Technical Commission /CTA to examine and evaluate connexion requests) Going on BJS Junction Box installation expected by summer 2009 First operations end of 2009 Meeting in CPPM _ Demonstration mission in ESONET 16 sept 2008