MyProject Edit WG Web Site Data.

Slides:



Advertisements
Similar presentations
Overview of the IEEE Process. Overview of Process l Project Approval l Develop Draft Standards l Ballot Draft l IEEE-SA Standards Board Approval l Publish.
Advertisements

Two Components IMAT consists of two components
IEEE Automated Meeting Attendance Tool Attendee Enrollment Process Michael Kipness Christina Sahr
Searching for Information Search engines vs. subscription services.
How to Fill out a PAR for a New Standard Revised 8 July 2010.
Web Screen Saver 2008  Display content on a screensaver  PowerPoint slideshows  Video files  Flash animations  Web pages and RSS feeds  Update the.
P802.16q to Sponsor Ballot: Conditional Approval Request 17 July 2014 IEEE Gdoc.
Wireless Guest Access Allows short-term visitors to have temporary access to the wireless network without going through the temporary affiliate process.
Static VS Dynamic websites. 1-What are the advantages and disadvantages? 2- Which one should you choose and why?
Play The Web 2010  Digital signage solution  Display content on a web kiosk  PowerPoint slideshows  Video files  Flash animations  Web pages and.
IEEE-SA Attendance Tracking Tool Project Wrap Up for 802 Implementation Dallas – November 2008.
Eurotrace Hands-On The Eurotrace File System. 2 The Eurotrace file system Under MS ACCESS EUROTRACE generates several different files when you create.
 Auditing  Add User Accounts from NAP – Privileged and Non-Privileged  Remove a User Account from Enterprise – this does not affect the NAP account.
Doc.: IEEE /0058r0 Submission January 2008 Harry Worstell, AT&TSlide 1 Opening Network Information, Attendance and Documentation for January 2008.
IEEE-SA Public Review IEEE/PES PE/SPDC Committee San Diego, CA May 2015.
Doc.: IEEE /197R0 Submission March 2003 Terry Cole, AMDSlide WG Technical Editor’s Report Terry Cole, AMD (WG technical editor status.
Doc.: IEEE COEX-01/004r0 Submission July 2001 Jim Lansford, Mobilian CorporationSlide 1 IEEE Coexistence Study Group Recommendations to create a Coexistence.
Doc.: IEEE r Submission April 2007 Michael Lynch, Nortel 22 March Agenda Opening comments and attendance Schedule of meetings/deadlines.
Works Cited Page To create a Words Cited page… Press “Ctrl” and “Enter” to begin your Works Cited page (this will jump you down to the next page in your.
And Uploading Documents.  Pick between the databases  PBWorks PBWorks  Wet Paint Wet Paint  Most classroom sites are with pbworks.
IEEE-SA Meeting Attendance Tool Attendee Enrollment Process Christina Sahr
IEEE-SA 802 EC – March 2013 Plenary Standards Development Solutions & ETools Update DCN:
Doc.: IEEE Submission March 2007 Michael Lynch, Nortel 22 March Agenda Opening comments and attendance Schedule of meetings/deadlines.
Deploying Content College of Life Sciences / College of Medicine, Dentistry and Nursing Andrew Millar, Web Services Manager.
Doc.: IEEE /1157r0 Submission September 2010 Dorothy Stanley (Aruba Networks)Slide 1 September 2010 Closing Report -TGmb Date: Authors:
How to change a Sponsor ballot vote in myProject Sponsor Ballot – Vote Change Updated : 2 September 2011.
Central Desktop Online Collaboration Tool. Background to E-Tools Identify, develop, integrate, and make available a set of best-in- class electronic tools.
Administrative System for a Speech Pathology Office By Devin Peterman.
IEEE PCIC Standards Working Group Officers’ Workshop IEEE-SA Public Review Overview for Sponsor Chairs, Working Group Chairs and Ballot Designees Pat Roder.
Sponsor Ballot Process
Spam Database Tool Use The purpose of this Tool is to Store all SPAM Numbers in Database for matching and excluding from CDRs. Note All files will be stored.
WG Technical Editor’s Report
IEEE Coexistence Study Group
IEEE 1914 NGFI IEEE RoE TF Opening Report
myProject Redesign: Status & Preview
LMSC Policies and Procedures Subcommittee Inputs
The Standards Development Process
Introduction to the MS Word template for IEEE standards drafts
Chair of Tech Committee, BetterGrids.org
myProject Redesign Report
IEEE-SA MEETING ATTENDANCE TOOL NOTE: This is for attendance and voting rights in the meeting; make sure you register for the meeting STEP 1. Do you have.
Explanation of Awards available to Switchgear Committee Education, Recognition, and Planning (ERP) Subcommittee.
[Document title] [Author Name and affiliation].
Title: LE TG Closing Report for Session #56
WG Technical Editor’s Report
IEEE Coexistence Study Group
IEEE Standard Roll-up Report
Task Group G Report March 10, 2003
IEEE Motions at the November Plenary EC Meeting
WG Technical Editor’s Report
Automating and Validating Edits
NesCom PAR Review Period Comment Dialog
IEEE 1914 NGFI IEEE RoE TF Closing Report
IEEE P1666 SystemC Standardization Working Group Status and Plans
EC Monday Meeting Report March 17, 2008 Orlando, Florida, USA
802.11bd Timeline Date: Authors: January 2019
EC Update on LMSC Policy and Procedures
Submission Title: [Proposed project timeline]
WG Technical Editor’s Report
Liaison Report Date: Authors: January 2012
Policies and Procedures Status and Plans
EC LMSC Policy and Procedures Update
P802.11aq Waiver Request Introduction
Major PAR Modification request form questions
July 2019 IEEE P Spectrum Characterization and Occupancy to Sponsor Ballot Bob Heile Chair, IEEE Bob Heile, Decawave.
Report on Date: Authors: July 2017 July 2013
<month year> doc.: IEEE < e> <March 2019>
July 2019 TG22 TVWS Closing Report Austria Center, Vienna, Austria Apurva Mody Chair, TG22 Apurva Mody, BAE Systems.
<month year> doc.: IEEE < e> <September 2019>
Presentation transcript:

myProject Edit WG Web Site Data

Why do I have to keep myProject up-to-date? myProject feeds data into other systems and databases, so it is important that you keep the information in myProject fresh. For example, the data that is in myProject is exported to: IEEE SA DB (SA Database) Data from the SADB feeds the product store and other data bases IEEE SA Eproject Files 12/5/2018

Who updates the data? Some data is updated by the system automatically upon a process running. Some data is updated by users who do some action in the system. Some examples include: Sponsor ballot Start Date PAR submission Date Some data is updated manually by users. Some key info is updated by SA Staff: Sponsor Information Sponsor Name Sponsor Web Site Sponsor Chair WG Information WG Name WG Web site WG Chair (updated by the Sponsor Chair) 12/5/2018

Sponsor Information 12/5/2018

WG Information 12/5/2018