AIChE Contest Organization

Slides:



Advertisements
Similar presentations
Advanced Technical Writing Lecture 2 Progress report.
Advertisements

Engineering H193 - Team Project Spring Quarter 2003 P. 1 Progress Reports Week 4 Day 1.
Introduction to Computers Lab Assignments. Introduction to Computers Laboratory Schedule All Lab Sessions are held in the classroom. The completion of.
Advanced Technical Writing
Batch Processing Optimal Design and Scheduling
CHEN 4470 – Process Design Practice Dr. Mario Richard Eden Department of Chemical Engineering Auburn University Lecture No. 1 – Course Introduction and.
1 Introduction to Engineering Second Semester Overview Agenda Team Assignments and Information Exchange Course Overview.
Tm&i 2010 VI.1 technology management & innovation introduction to project management (ii) project planning methods & tools.
Senior Design Experience Semester II Project Requirements and Timeline
Senior Design Project Chapter 22. Project Overview –Feed Pre- conditioners –Reactor(s) –Separator(s) –Product Conditioners –Recycle –Heat Integration.
Facilitators: Dr. Wanda Zagozdzon-Wosik Dr. Dr. Jung-Uk Lim ECE 4336: CAPSTONE DESIGN II.
ECE791 Senior Design Experience Project Requirements and Timeline.
Lecture 1: Introduction – Graduation Projects Topics to Discuss in Lectures 1. Project Deliverables 2. Course grading 3. Project Concept Writing.
Course Instructor Professor Clark J. Radcliffe Office hours: MWF 11:30-12: EB ME 481.
TA Meetings ECE 445: Senior Design - 09/15/15. Overview  Meeting expectations  How to prepare  Evaluation.
1 Weekly Summary Titan EDD Fall Semester 9/15/2008 Andrew Welsh.
Engineering H193 - Team Project Spring Quarter Gateway Engineering Education Coalition P. 1 Progress Reports Week 4 Day 1.
Short Design Report Terry Ring CH EN 5253 Process Design II.
Slide 1ICT 327 Management of IT ProjectsSemester 1, 2005 Topic 3 Executing & Controlling & Closing Projects.
Project Work Week 2 Terry A. Ring Chemical Engineering.
Batch Processing Optimal Design and Scheduling Chapter 11 Terry A. Ring Chemical Engineering.
© 2008 Prentice Hall6-1 Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and.
Life Science Advanced Science Fair
The Vertically-Integrated Projects (VIP) Program: Integrating Undergraduate Education and Graduate Research Bloom, B. S. (Ed.). (1956). Taxonomy of educational.
A Helpful Guide to CSCE 145 or How I Learned to Love the Machines
Writing the Progress Status Report
Miscellaneous CHEN 4470 – Process Design Practice
Introduction to MA Day 1.
Introduction to MA Day 1.
February 16th Meeting.
Terry Ring Chemical Engineering University of Utah
Introduction to CHEN Process Design II
AIChE Contest Organization
WU WK#17 Monday 5/9/16 CW: a) Exam Chapter 9:Stoichiometry b)COPY Conclusion guidelines paragraph 3-6 on LNB p3 HW: a) Stoichiometry Lab-LNB:COMPLETE Conclusion.
Team member1 Team member2 Team member3 Team member4 17 September 2009
Your Project Title MEXX
Progress Reports Form and Structure
GANTT CHARTS Example Text Text Here Text Here Text Here Text Here
Overview Basic Information Lecture Labs Lab Reports Homework Exams
Terry A. Ring Chemical Engineering University of Utah
Terry Ring CH EN 5253 Process Design II
Name Mrs. Bivins English 11 – Period ____ Date Assignment
Week 13 BA9 Questions?.
Geography of Sports Spring 2010
A Helpful Guide to CSCE 146 or “Dankest Data Structures”
No Warm-Up 5/16/17 Happy Tuesday!  We have 8 school days left this year! (and 1 more Tuesday after today!) You can choose your seat today; if you move.
Advanced Technical Writing
Course calendar (page 1 of 2)
Administrative Issues
Lecture 7 PROJECT SCHEDULING Ferdinand Fassa.
Week of May 28-June 1 Memorial Day No School Test SOL 4.4 Plants Test
Terry A Ring Chemical Engineering University of Utah
Administrative Issues
No Warm-Up 5/15/17 Happy Monday!  We have 9 school days left this year! (and 1 more Monday after today!) You can choose your seat today; if you move.
Monday, May 20 Reminders: Final/Semester Exam for everyone this Wednesday, May 22 Last Friday (5-17) - Electricity Unit Test Test and lab make-up is today.
Project Plan MS Project Example (Optional)
Chemistry Interactive Notebook Rubric (18 week)
Planning for AIChE Contest Problem
No Warm-Up 5/19/17 Happy Friday!  We have 5 school days left this year! You can choose your seat today; if you move the seats around, please put them.
September Important Dates 9/7/18: Signed Course Contract due
Technical Communication
Terry A. Ring Chemical Engineering University of Utah
No Warm-Up 5/18/17 Happy Thursday!  We have 6 school days left this year! (and 1 more Thursday after today!) You can choose your seat today; if you.
Terry A. Ring Chemical Engineering University of Utah

September Important Dates 9/7/18: Signed Course Contract due
Tuesday, May 21 Reminders:
MPATE-GE 2626: Thesis in Music Technology Spring 2019
Miscellaneous CHEN 4470 – Process Design Practice
You will need a new part in your notebook
Presentation transcript:

AIChE Contest Organization Terry A. Ring University of Utah

Project Organization Senior Design Project

Project Schedule CH EN 5253 Design II - Spring 2018 Week Day Lecture Topic Assignments Due Date Lecture No. Screen Cast 12 26-Mar AIChE Contest Problem Kick Off Design Contest Problems Assigned 28-Mar AIChE Contest Problem for 30 Days Sieder Chapter 23 30-Mar Memo 1 Due - Planning Memo Memo 1 13 2-Apr 4-Apr Memo 2 Due - Progress Report Memo 2 6-Apr 14 9-Apr 11-Apr Memo 3 Due - Progress Report Memo 3 13-Apr 15 16-Apr 18-Apr Memo 4 Due - Progress Report Memo 4 20-Apr 16 23-Apr 24-Apr Last Day of Classes (Tuesday) Contest Projects due at Midnight Report Due No Final Exam

Deliverables Memo Due Each Wednesday for Each Team Friday 3/30 Planning Memo 4/6, 4/13, 4/20 Progress Report Memos 4/24 Final Report Due at Midnight Electronic copy in Canvas For submission to AICHE

Planning Memo Introduction Paragraph The plan Gantt Chart Paragraph of Plan overview Short Paragraph for each task Gantt Chart Sequential Order of Tasks Times Required for Each Task Conclusion Paragraph Task wk 1 wk 2 wk 3 wk 4 Design Research Reactor Kinetics x Aspen Simulation of Reactor Aspen Simulation of Separation System Heat Integration Plant-wide Control Plant Hazard Analysis and Chemical Safety Costing of Reactor Separation System Other Report Writing

Progress Report Memo Introduction Body Conclusion Give and Report on the Updated Old Gantt Chart State past progress and list what has been finished Discuss the progress since the last progress report. Explain any overdue problems Why they occurred Implication on project Efforts you will use to overcome problems Conclusion Give prognosis for total project Progress Report Memo 1 After 1st Week Task wk 1 wk 2 wk 3 wk 4 Design Research Reactor Kinetics 85% Aspen Simulation of Reactor 5% x Aspen Simulation of Separation System Heat Integration Plant-wide Control Plant Hazard Analysis and Chemical Safety 25% Costing of Reactor Separation System Other Report Writing

Organize Project Teams – presently 19 Teams (of 26 possible teams) 3 Individuals/team Individuals 1 individual has signed up Richmond Thornley is looking to join a team

Competition Rules Project Rules Departments, including advisors, faculty, or any other instructor, cannot provide technical aid specifically directed at the solution of the national student design competition. The problem may not be discussed with anyone (students, faculty, or others, in or out of class) before or during the period allowed for solutions.

Rules

Rules

Rules