UCSB Module Assembly Week of 11/28 – 12/2/05 Week of 11/28 – 12/2/2005.

Slides:



Advertisements
Similar presentations
Clean Room Plans Monday, August 23, Hybrids--- Frames--- SensorsModules.
Advertisements

Tracker Week – UCSB Gantry Status – April 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara Dean White.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
1 UCSB Module Assembly Week of 5/16-5/20. 2 UCSB Parts Inventory 5/23/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd
TOB Status Joe Incandela University of California, Santa Barbara For the TOB Group Tracker General Meeting Sep. 21, 2001 at CERN Slides courtesy of: A.
CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 1 Status of the UCSB Gantry Dean White University of California Santa Barbara October.
DOE REVIEW 1/20/04 – Dean White 1 Gantry Module Assembly TOB & TEC Dean White University of California, Santa Barbara.
1 Hybrid & Module Testing Status Week of 4/25-4/29.
Recent TOB Developments First LT failure and Stereo Module Status J. Incandela With slides provided by E. Chabalina, A. Affolder, Dean White.
Tracker Week – UCSB Gantry Status – Febuary 10, 2004 – Dean White 1 Gantry Status University of California Santa Barbara UCSB Gantry Team: Andrea Allen.
CMS Week – UCSB Gantry Status – March 15, 2005 – Dean White 1 Weekly Status Report Production: 84 hybrids bonded last week, all tested fine. 45 modules.
1 UCSB Module Assembly Week of 5/23-5/27. 2 FNAL & UCSB Inventory HybridsSensorsFrames FNALUCSBFNALUCSBFNALUCSB STHPKITSTHPKITSTHPKITSTHPKIT L12pu /
1 UCSB Module Assembly Week of 4/11 – 4/15. 2 UCSB Parts Inventory 4/4/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu ST193 L12pd ST193.
1 CMS week 15/03/05, Module Production Meeting, Dean White - UCSB Status of Sensor Bias Connection Dean White For the US CMS Group.
1 Hybrid & Module Testing Status Week of 6/6-6/10.
1 UCSB Module Assembly Week of 5/9-5/13. 2 UCSB Parts Inventory 5/9/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd L12su
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
CMS Week – UCSB Gantry Status – June 8, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave Staszak.
US Module Production June 2, 2005 J. Incandela For the US CMS Tracker Group.
1 UCSB Module Assembly Week of 5/2-5/6. 2 UCSB Parts Inventory 5/9/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd L12su
1 UCSB Module Assembly Week of 4/25 – 4/29. 2 UCSB Parts Inventory 5/2/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu ST193 L12pd ST193.
Status Brussels GANTRY
Hybrid & Module Testing Status
US Module Production Status
Results from module testing
Vienna Module Production
FNAL Module Testing Status
Operations/Failure Analysis
TEC Module Production Overview
FNAL Module Testing Status
UCSB Qualification Module Grading
Module Production in Brussels
Hybrid Status/Deliveries
OGP Surveying & DB Entry
Sensor probing (Summary)
Hybrid & Module Testing Status
FNAL LT Testing Status Modules – were tested during Aug 2 – Aug 9.
Passitivation Location
L.Fiore Gantry Meeting during the CMS TK week
FNAL Hybrid Testing Status
Module Production in Brussels
Module Testing Status Week of 6/14-6/20.
UCSB Module Assembly Week of 12/5 – 12/9/05 Week of 12/5 – 12/9/2005.
Hybrid & Module Testing Status
Operations/Failure Analysis
FNAL Hybrid Testing Status
Is Increased Bias Current and CMN Correlated?
TEC module quality overview
TOB Module Production Overview and Plan
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Wirebonding UCSB FNAL Machines
Recent TOB Developments
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Recent TOB Developments
Module Testing Status Week of 3/14-3/18.
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
FNAL Hybrid Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
FNAL Bonding Since our last report we have built and bonded an additional 10 TOB 4-chip modules 3 RMT pitch adapters 7 Planar pitch adapters By adjusting.
FNAL Hybrid Testing Status
FNAL Hybrid Testing Status
FNAL Hybrid Testing Status
Presentation transcript:

UCSB Module Assembly Week of 11/28 – 12/2/05 Week of 11/28 – 12/2/2005

FNAL & UCSB Inventory – 11/28/05   Hybrids Sensors Frames FNAL UCSB ST HPK IT L12sd 57 204 73 213 541 276 735 - 190 498 L12su 89 257 L12pd 98 152 308 423 L12pu 56 187 85 395 L34pu 52 349 L56pu 103 216 2 272 5 153 32 R5p 102 23 78 168 R5s 6 88 68 130 R6 70 53 223 269 R7 14 93 282 Week of 11/28 – 12/2/2005

FNAL Module Assembly Weekly Cumulative A B C % A or B L12pu 109 2   A B C % A or B L12pu 109 2 100.0% L12pd 169 5 97.2% L12su 170 17 14 93.0% L12sd 23 1 132 18 3 98.0% L34p 43 623 29 8 98.8% L56p 768 31 98.3% Total 66 1971 102 44 97.9% Week of 11/28 – 12/2/2005

UCSB Module Assembly Weekly Cumulative A B C % A or B LEFT TO BUILD*   Weekly Cumulative A B C % A or B LEFT TO BUILD* % to Build L12pu 107 5 2 98.2% 158 58.5% L12pd 116 1 100.0% 153 56.7% L12su 31 237 87.8% L12sd 37 231 85.6% L34p 6 449 229 33.5% L56p 718 11 99.7% 111 13.2% TOB total 1458 27 4 1119 43.0% R5N 16 220 8 99.6% 132 36.7% R5S 98.0% 115 31.9% R6 12 309 13 182 36.1% R7 26 230 17 99.2% 14 5.4% TEC total 54 996 46 9 99.1% 443 29.8% Grand Total 60 2454 73 99.5% 1562 38.2% * This is based on UCSB building 50% of the minimum number of modules needed of each type. Includes no spares. Grade C not included. For R7, this assumes 261(18%) modules built at UCSB, 400(28%) at FNAL & 779(54%) at Lyon. Week of 11/28 – 12/2/2005

US Module Assembly Weekly Cumulative A B C % A or B L12pu 213 7 2   A B C % A or B L12pu 213 7 2 99.0% L12pd 285 6 5 98.3% L12su 201 19 14 94.0% L12sd 23 1 169 20 3 98.4% L34p 49 1072 35 8 99.3% L56p 1486 42 16 R5N 220 99.5% R5S 237 97.9% R6 12 309 13 99.7% R7 26 230 17 99.1% Total 126 4 4425 175 57 98.8% Week of 11/28 – 12/2/2005

Wire Bonding at UCSB Modules: Backsides: Bias retrofits: Hybrids: 42 TEC R5 6 TEC R5 STEREO 18 TEC R7 6 TOB 4 CHIP Backsides: All above plus 48 TOB 6 chip 12 TOB 4 chip Bias retrofits: 136 TOB 6 chip Hybrids: 12 TOB P 4U 30 TEC 6D.5.1 8 TEC 4U.6 20 TOB 6 chip modules have been sent to FNAL for the wire bias retrofit. Week of 11/28 – 12/2/2005

Module Assembly The gantry U-axis has gotten an encoder error several times over the last couple days. This requires restarting the assembly of the plate. Usually using recover mode. We reconnected all the cables and reseated the U-axis amplifier card. In the past, one of these cards went bad with similar symptoms. On the last plate assembled on Friday, the U-motor went into oscillation and emergency stopped. This resulted in the chipping of the corner of a TEC R7 sensor. This failure of the U-motor has happened 2 or 3 times in the last year. It may or may not be related to the encoder error problem. FNAl is sending a spare amplifier card they have for the gantry U axis. We will install this today and do some test runs. Week of 11/28 – 12/2/2005