ARIEL Phase I Operations

Slides:



Advertisements
Similar presentations
Technical Committees – the Brains of ASHRAE Section 1.0 — Fundamentals and General.
Advertisements

Cyclotron Refurbishing & Development Meeting March 6, 2008.
Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC , the State of Michigan.
Mar 13, Low-energy RHIC electron Cooler (LEReC) CRYOGENICS Mar 13, 2014.
CERN TS Department / Civil Engineering Group 8 February 2008 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC/ILC Collaboration Meeting 8 Feb 2008.
1 Stefan Moeller 1 AMO Instrument Schedule ARR AMO Instrument Schedule Stefan Moeller – XES Manager June 30, 2009.
Sector 13 Canted Undulator Upgrade Hutch Modification Requirements.
UK Costs Beam & Infrastructure Coils Tracking Detector.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/2 Design Geoff Vaughan University of Central Lancashire,
Gas Turbine Power Plant
Large-capacity Helium refrigeration : from state-of-the-art towards FCC reference solutions Francois Millet – March 2015.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
1 T2K Beam Operation Summary (earthquake recovery and beamline survey) NBI 2012 T. Ishii (KEK) for the T2K beam group.
NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page 1 1 Infrastructure Review - W.B.S Water Systems Water Systems –Upstream.
ACTIVITY J A J O J A Schedule( ) UCN Timeline & Major Milestones Remove.
TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC workshop – Working group: Two beam hardware.
NUMI NuMI Internal Review July 12, 2001 Infrastructure: Radiation Safety Page 1 Technical Components NuMI Beamline Radiation Safety Issues Radiation Safety.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
John LeRose March 12, A Program of three “projects” to assemble the Super BigBite Spectrometer for a series of experiments in Hall A There is a.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
NuMI NuMI Target Hall Air System Review Introduction July 30, 2003 Jim Hylen / FNAL Page 1 NuMI Target Hall Air System Review Introduction Air system for.
January 18, 2013 All Hands January ARIEL Completion and the next 5 Year Plan.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
September 19-20, 2007 L. Snydstrup Controls, Diagnostics, Vacuum, Cooling Systems, Installation DOE Annual Review Controls, Diagnostics, Vacuum, Cooling.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
COOLING & VENTILATION FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 16/9/2009 CLIC TWO BEAM MODULES REVIEW
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
Condensing Hydronic Heat Exchangers Make-Up Air Units Meets.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
March 22,  Overview of Asian Civil Design  Previous Case Study  Feature of Beam Tunnel  Tunnel Typical Cross Section  Beam Tunnel.
Extreme Light Infrastructure in Romania: progress Daniel URSESCU Technical contact point for ELI in Romania INFLPR, Magurele, Romania.
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
Restarting Cooling, Ventilation for PS and SPS. PS /SPS days 2006.
Installation of the T600 at Fermilab CSN2, September 22,
LINAC3 UPGRADE Source and LEBT modifications for YETS and recommissioning timetable 28/10/2015 Ville Toivanen.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
Mike Andrews May 10, Week 54 NuMI Activities Initial test controls on the MI65 RAW exchange skid Complete hydrostatic test of the MI65 exchange.
H. Weick, 8 th MAC meeting, GSI, Super-FRS Status Target Area H. Weick / M. Winkler 8th FAIR - Machine Advisory Committee Meeting
WBS – 30 Straight Section Reconfiguration g-2 Accelerator – 30 Straight Section Reconfiguration D. Still Fermilab Muon g-2 IDR, June 5-7.
Muon Long Term Schedule August 15, µ Points to discuss What is the schedule What is the schedule Shutdown schedules Shutdown schedules How do we.
The ESS Target Station Eric Pitcher Head of Target Division February 19, 2016.
Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada Propriété.
Report Technical Director Storage-Ring-Installation Completed
Cryoplant Controls Installation
I. Bergevoet - Training preparation
Beam Dump Hall Volume Beam Dump Meeting at SLAC May S.Ban
Schedule for the FAIR Antiproton Target
St. George Infrastructure
CBETA Technical Review
TOPIC: TRANSFORMER-BASICS ENROLLMENT NO:
IT-4189 Supply and installation of a cryogenic distribution system
E4 hall technical specifications
Budget specification EHN1 Extension: Infrastructure (WG2)
Vacuum chamber for experiment HIHEX at FAIR
352MHz Klystron Control for the 3MeV Linac test stand
ESS RF Development at Uppsala University
WP Coordinaten XFEL RF Operation
Section 1.0 — Fundamentals and General
SION Vacuum Circuit-Breaker For Standard Applications
Undulator System Installation
ARIEL Timeline ARIEL BL2A e-Linac 100 kW ARIEL Target West + FE
APTM and GRID interface requirement PBIP and PBW
Rack installation and local tests for the MEBT Chopper Rack
Polarized 3He target installation
Presentation transcript:

ARIEL Phase I Operations March 29, 2012

What’s in the VECC MoU3 Target Station Target Module Source Tray TM Support Structure E-beam diagnostics E-beam raster Front-End Pre-separator and PS 50m beamline [West target station to b-NMR] at $20k/m, incl. optics, diagnostics, vacuum, power supplies, support structures

What’s in the VECC MoU3 Beam Test High Voltage Cooling Vacuum Control Shielding blocks Development Quick Disconnect Pillow seals Source tray Ion Source Ion beam diagnostics  

No ok ok No ok No ? No ok ? ? 12/5/2018 All Hands - May 2010

ARIEL Services (Remy’s list) Hazard analysis Shielding within the building shell Nuclear ventilation from stub ducts Air heat removal required beyond base install Water cooling from raw water supply/return Electrical distribution from main panels Air compressor and all compressed air distribution from trunk headers License to operate!

Action List Target Hall and RIB services and infrastructure Resource-loaded schedule for ATM (ARIEL Target Module), incl. development – PB - Design of Low energy beam transport from West TS to b-NMR - Layout/Optics - Diagnostics - Enumerate components - Detailed budget