ARIEL Phase I Operations March 29, 2012
What’s in the VECC MoU3 Target Station Target Module Source Tray TM Support Structure E-beam diagnostics E-beam raster Front-End Pre-separator and PS 50m beamline [West target station to b-NMR] at $20k/m, incl. optics, diagnostics, vacuum, power supplies, support structures
What’s in the VECC MoU3 Beam Test High Voltage Cooling Vacuum Control Shielding blocks Development Quick Disconnect Pillow seals Source tray Ion Source Ion beam diagnostics
No ok ok No ok No ? No ok ? ? 12/5/2018 All Hands - May 2010
ARIEL Services (Remy’s list) Hazard analysis Shielding within the building shell Nuclear ventilation from stub ducts Air heat removal required beyond base install Water cooling from raw water supply/return Electrical distribution from main panels Air compressor and all compressed air distribution from trunk headers License to operate!
Action List Target Hall and RIB services and infrastructure Resource-loaded schedule for ATM (ARIEL Target Module), incl. development – PB - Design of Low energy beam transport from West TS to b-NMR - Layout/Optics - Diagnostics - Enumerate components - Detailed budget