L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,

Slides:



Advertisements
Similar presentations
LBNL PIXEL IPHC 2009_06_LG1 Flex Cable Development The development of the flex cable for sensor readout and control is envisioned as a 4 stage process.
Advertisements

STAR Pixel Detector Phase-1 testing. 22 Testing interrupted LBNL-IPHC 06/ LG Lena Weronika Szelezniak born on May 30, 2009 at 10:04 am weighing.
HFT PXL Mechanical WBS 1.2 March 2010 Howard Wieman LBNL 1.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
M. Szelezniak1PXL Sensor and RDO review – 06/23/2010 STAR PXL Sensors Overview.
HFT PIXEL Mechanical Progress Strasbourg June-2009 Wieman 1.
PXL RDO System Requirements And meeting goals 11/12/2009BNL_CD-1_SENSOR_RDO - LG1.
Naming Convention HFT PIXEL 12-June pixel identification sector – ladder – chip - row - column 1-10in out1 out2 out Alternative.
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT Plans for the next year A short report on review results and plans for TPC – Time Projection.
L. Greiner1SLAC Test Beam 03/17/2011 STAR LBNL Leo Greiner, Eric Anderssen, Howard Matis, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
LBNL Michal Szelezniak, Eric Anderssen, Leo Greiner, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Chinh Vu, Howard Wieman UTA Jerry Hoffman, Jo Schambach.
PXL Electronics Status update for HFT TC meeting on May 11, 2010 at LBNL 1HFT TC 05/11/ LG.
Research and Development for the HFT at STAR Leo Greiner BNL DAC 03/15/2006.
L. Greiner 1PXL BNL Safety Review– September 26, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal.
HFT PXL Mechanical July 2010 Howard Wieman LBNL 1.
L. Greiner1PXL Sensor and RDO review – 06/23/2010 STAR Heavy Flavor Tracker Overview With parameters pertinent to the PXL Sensor and RDO design.
MS, LG, XS PXL ladder tests at IPHC, May 1-7, Preliminary Ladder Testing Results At IPHC MS, XS, LG.
Naming Convention HFT PIXEL 12-June-2009 Updated 03/08/2013 By LG to include row and column information for Ultimate sensors.
L. Greiner 1HFT PXL BNL FTF– September 27, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
EUDET Annual Meeting, Munich, October EUDET Beam Telescope: status of sensor’s PCBs Wojciech Dulinski on behalf.
Better pointing with HFT PIXELS a focus on the mechanics 15-Jan-2009 Wieman.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
M. Szelezniak1PXL Sensor and RDO review – 06/23/2010 STAR Hardware Prototyping Status.
X,Sun1USTC discussion, Oct 15, 2010 STAR STAR Heavy Flavor Tracker Upgrade --Status of PXL Detector Xiangming Sun Lawrence Berkeley National Lab L. Greiner,
H. Wieman1STAR HFT CD1 Review, BNL, November 2009 STAR HFT PIXEL Detector WBS 1.2 Howard Wieman LBNL.
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
L. Greiner 1PXL Detector Progress – July 2013 STAR HFT LBNL Leo Greiner, Eric Anderssen, Giacomo Contin, Thorsten Stezelberger, Joe Silber, Xiangming Sun,
L. Greiner1IPHC-LBNL Phone Conference 05/2011 STAR IPHC-LBNL Phone Conference News and PXL sensor (Ultimate) testing at LBNL.
HFT PIXEL Detector Pre-practice CDR-1 Review 3-Sept Wieman 1.
Leo Greiner IPHC meeting HFT PIXEL DAQ Prototype Testing.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
1 PIXEL H. Wieman HFT CDO LBNL Feb topics  Pixel specifications and parameters  Pixel silicon  Pixel Readout uSTAR telescope tests 
Phase-1 Design. i PHC Phase /04/2008 System Overview Clock, JTAG, sync marker and power supply connections Digital output.
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
Testing results of PXL RDO board JTAG daisy chain
MAPS based vertex detector at STAR Michal Szelezniak 1 on behalf of: E. Anderssen 1, X. Dong 1, L. Greiner 1, J. Kapitan 2,S. Margetis 3, H. Matis 1, H.G.
Leo Greiner IPHC DAQ Readout for the PIXEL detector for the Heavy Flavor Tracker upgrade at STAR.
HFT PIXEL Detector Director’s review May-2009 Wieman 1.
PXL Cable Options LG 1HFT Hardware Meeting 02/11/2010.
L. Greiner1PXL Sensor and RDO review – 06/23/2010 STAR PXL Detector Sensor and RDO Review Introduction.
Michal Szelezniak – LBL-IPHC meeting – May 2007 Prototype HFT readout system Telescope prototype based on three Mimostar2 chips.
Leo Greiner PIXEL Hardware meeting HFT PIXEL detector LVDS Data Path Testing.
MS IPHC-LBL phone meeting, July 10, Ladder Testing at IPHC and LBL.
Xiangming Sun1PXL Sensor and RDO review – 06/23/2010 STAR XIANGMING SUN LAWRENCE BERKELEY NATIONAL LAB Firmware and Software Architecture for PIXEL L.
J. Crooks STFC Rutherford Appleton Laboratory
HFT DOE Review July 17-18, 2012 The Silicon Strip Detector WBS 1.4 Jim Thomas Lawrence Berkeley National Laboratory SSD.
1 The STAR Pixel Upgrade H. Wieman Heavy Quark Workshop LBNL 1-Nov-2007.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
L. Greiner 1FEE 2014 – STAR PXL Vertex Detector STAR HFT LBNL Leo Greiner, Eric Anderssen, Giacomo Contin, Thorsten Stezelberger, Joe Silber, Xiangming.
L. Greiner 1St. Odile CMOS Workshop – September 6-9, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun,
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
L. Greiner 1ATLAS Workshop LBL - September, 2013 STAR HFT LBNL Leo Greiner, Eric Anderssen, Giacomo Contin, Thorsten Stezelberger, Joe Silber, Xiangming.
Vertex 2008 July 28–August 1, 2008, Utö Island, Sweden CMOS pixel vertex detector at STAR Michal Szelezniak on behalf of: LBNL: E. Anderssen, L. Greiner,
MS, LG, XS PXL ladder tests at IPHC, May 1-7, Preliminary Ladder Testing Results (part 2) At IPHC MS, XS, LG.
Leo Greiner IPHC beam test Beam tests at the ALS and RHIC with a Mimostar-2 telescope.
Leo Greiner IPHC1 STAR Vertex Detector Environment with Implications for Design and Testing.
STAR Pixel Detector readout prototyping status. LBNL-IPHC-06/ LG22 Talk Outline Quick review of requirements and system design Status at last meeting.
L. Greiner1IPHC-LBNL Phone Conference 07/10/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
X,Sun1CERN meeting, May 29, 2011 STAR STAR Heavy Flavor Tracker Upgrade --PXL Detector Xiangming Sun Lawrence Berkeley National Lab L. Greiner, H. Matis.
.1PXL READOUT STAR PXL READOUT requirement and one solution Xiangming Sun.
IPHC-LBL-BNL video conference 19 Jan 2007 HFT development MimoStar2 based telescope.
1 HFT Wieman 11/6/ Outline  Development Status uMIMOSTAR pixel detectors uMIMOSA5 Electronic Readout uLadder mechanics uBeam pipe  Interface.
LBNL Eric Anderssen, Leo Greiner, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak, Chinh Vu, Howard Wieman UTA Jerry Hoffman, Jo Schambach.
L. Greiner 1Project X Physics Study, Fermilab, June 18, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun,
1 PIXEL H. Wieman HFT CDO LBNL Feb topics  Pixel specifications and parameters  Pixel silicon  Pixel Readout uSTAR telescope tests 
The STAR PXL detector cooling system LBNL: Eric Anderssen, Giacomo Contin, Leo Greiner, Joe Silber, Thorsten Stezelberger, Xiangming Sun, Michal Szelezniak,
The STAR Heavy Flavor Tracker PXL detector readout electronics
Leo Greiner, Eric Anderssen, Howard Matis,
Presentation transcript:

L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak, Chinh Vu, Howard Wieman UTA Jerry Hoffman, Jo Schambach IPHC Strasburg Marc Winter CMOS group STAR Pixel Detector Probe Testing

2IPHC meeting – September 5-6, 2011 L. Greiner STAR HFT Talk Outline Phase-1/2 probe testing system design Current capabilities Ultimate sensor probe testing Summary

3IPHC meeting – September 5-6, 2011 L. Greiner STAR HFT Probe Test System Design Probe Card Probe Station Power Supply RDO Board Control PC CUSTOM USB SERIAL POWER The probe test system is based on our prototype readout board.

4IPHC meeting – September 5-6, 2011 L. Greiner STAR HFT Probe Testing Mechanical Design Vacuum chuck for probe testing 20 (50 μm thick) MAPS sensors per testing session. Automated test system based on the prototype RDO system gives a qualitative analysis of probed sensors including identification of dead/stuck pixels/columns.

5IPHC meeting – September 5-6, 2011 L. Greiner STAR HFT Phase-1 Probe Card Ribbon cable connection to RDO Board Analog buffering Probe pins Digital section 55 Fe source shield Power regulation/switching

6IPHC meeting – September 5-6, 2011 L. Greiner STAR HFT Probe card testing We wire bond a sensor to the probe card to test the full functionality of the probe card and testing system before the probes are mounted to the card.

7IPHC meeting – September 5-6, 2011 L. Greiner STAR HFT System Attributes We have a scripted probe testing setup based on our individual testing board scripts. We test at full RDO speed of 160 MHz. Power is regulated and switched on the probe card. Transfer function data is taken and analyzed in root with scripts.

8IPHC meeting – September 5-6, 2011 L. Greiner STAR HFT Sensor Test Sequence Current draw (power on) Chip id (JTAG) Test JTAG multiple patterns Load Default JTAG Measure current draw Measure DACs - scan VREF2, then scan to find VREF1 so that threshold = 0 threshold scan LED test + power consumption Analog RDO noise measurement on all sensors Source measurement on 1 sensor/wafer Repeat sequence for 3.0V and 2.9V All results are saved to a database that will be used for selecting sensors to build into ladders and sectors and for building configuration JTAG commands.

9IPHC meeting – September 5-6, 2011 L. Greiner STAR HFT Ultimate Sensor Probe Card Based on the successful Phase-1 probe card. Schematic in progress at LBNL Expected to be complete by September 15 Is IPHC interested in probe cards for Ultimate?

10IPHC meeting – September 5-6, 2011 L. Greiner STAR HFT

11IPHC meeting – September 5-6, 2011 L. Greiner STAR HFT PXL Mechanical Construction PXL Mechanical D-tube and sectors Ladder fixturing Vacuum chuck for 50um sensors