Bringing Early Benefits … Building Momentum … Converging !

Slides:



Advertisements
Similar presentations
EUROCAE WG 73: UAS integration Elements for the European Commission UAS panel Presentation at Workshop 2 UAS insertion into airspace Gérard Mardiné (SAFRAN-Sagem)
Advertisements

Transport TEN-T 2012 Calls for Proposals Info Day SESSION 2 MULTIMODAL AND CROSS-CUTTING PRIORITIES AIR TRAFFIC MANAGEMENT Unit Single European Sky - DG.
Federal Aviation Administration International Civil Aviation Organization INFORMATION PAPER AERONAUTICAL COMMUNICATIONS PANEL (ACP) 14th MEETING OF WORKING.
GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
Jeffrey T. Williams Manager, RNAV & RNP Group Air Traffic Organization
Federal Aviation Administration International Civil Aviation Organization INFORMATION PAPER AERONAUTICAL COMMUNICATIONS PANEL (ACP) 13th MEETING OF WORKING.
EUROCAE WG82: Airport Data Link System ACP WGW3 IP 8 Montreal, January 2010.
International Civil Aviation Organization
Data Communications Program
A GLOBALink ARINC VDL Mode 2 AOA and ATN Program Status & Deployment Activities November, 2000 AMCPWGM1 WP23.
Page 1STNApresentation of data-link activities DATA-LINK IMPLEMENTATION IN FRANCE Initial data-link services with ACARS - Departure Clearance, ATIS - CPDLC.
SC-214 / WG-78 Mgt Meeting Nov 2010 Rockville, MD – Lockheed Martin.
PBN ICAO HQ Activities Overview
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
WG78 / SC214 – Plenary 12 (Berlin)
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-15/PIA 1 Improve Traffic Flow Through Runway Sequencing (AMAN/DMAN)
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
Closing the Loop on NextGen Air- Ground Data Communications John Gonda SC 214/WG 78 U. S. Lead for Operational Requirements Tracing and Validation.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
24 Sept '02Page 1 FANS-1/A Accommodation in an ATN Environment.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/2012/ASBU/Nairobi.
SESAR and ASAS Opportunity
Marc Baumgartner FANS Committee EATCHIP 1996 Free Route ATM Global concept WTT 2002.
Mr. Hooper Harris FAA/JAA Annual Meeting Phoenix, AZ June 3 - 7, 2002
> >
Agenda Model migration vs MDS upgrade Model migration overview Model migration – how does it work? Model package Demo.
EVOLUTION TOWARDS PERFORMANCE BASED NAVIGATION AND INCREASED OPERATIONAL FLEXIBILITY WORLDWIDE ALAIN BELANGER MANAGER PRODUCT PLANNING MARCH 12,
ATN2001 Rev New Kent Fisher, Program Manager Boeing Air Traffic Management Kent Fisher, Program Manager Boeing Air Traffic Management.
CNS/ATM Overview Aramco 4/21/2017 1:46 AM
Data Link Communications
Objective ATC 02.7 ESSIP Plan 2014 Ingrid FEIJT DSS/PEPR
FANS-1/A and ATN Data Link: An Avionics Perspective Bob Kerr
Episode 3 EP3 WP6 - Excom - December 15th, Brussels 1 WP6 - Technology EP3 Final Report Technology results December 2009.
3rd ASAS TN Workshop 19 April – 21 April rd ASAS TN Workshop Session 4: Strategy and Implementation Package I Requirements Focus Group (“Rapid.
System Wide Information Management (SWIM). FAA Transition to Service Oriented Architecture (SOA) - System Wide Information Management (SWIM) Initiative.
Page 1 FAA Future Air/Ground Communications System Architecture James Williams Integrated Product Team Lead Communications Systems ATN September.
ASAS Thematic Network 2.5 Towards an ASAS-Global Network.
Aircraft Manufacturer Plans - Airbus Stéphane Marché – Airbus ASAS TN Glasgow, September 2006.
Federal Aviation Administration Data Communications Program FAA Prototype & Validation Activities Presented to:Data Comm Implementation Team By:Craig Morris.
ASAS Opportunities SESAR and NextGen. SESAR D4 Time is very short – we only have until the end of October Lines of Change, Operational Improvements and.

ASAS in ATC Domain plans ADAS Initiative Dragos TONEA Eurocontrol Glasgow,13 th of September 2006 European Organisation for.
10 Dec 15 COMMUNICATIONS PANEL (CP) WORKING GROUP I (WG-I) Montreal, QC Canada January 2016 AEEC IPS Update (Prepared by Luc Emberger, Greg Saccone)
FAA NextGen Data Comm Tower Service: CPDLC DCL New Operator Introduction.
WORKING GROUP I (WG-I) AEEC IPS Update
International Civil Aviation Organization
FAA Data Comm Program Status AERONAUTICAL COMMUNICATIONS PANEL (ACP)
Workshop on preparations for ANConf/12 − ASBU methodology
ESA Iris Programme workplan of activities
Overview of Continental En-route Navigation Specifications
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Communication Roadmap ACP WGW04 – AI5 Jacky Pouzet, EUROCONTROL
GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
Workshop on preparations for ANConf/12 − ASBU methodology
International Civil Aviation Organization
System Wide Information Management (SWIM)
Workshop on preparations for ANConf/12 − ASBU methodology
ATSEP training - general SJCS Latvijas Gaisa Satiksme (LGS) Latvia
NEXCOM by Bruce Eckstein FAA.
IBAC – CNS/ATM Datalink Briefing
15-19 Nov 2010 Rockville, MD – Lockheed Martin
GeoMesh Blockchain Networking - Slide Presentation
London 14 October 2015 Freek De Witte Head of Stakeholder Relations
ASEAN PBN Routes Objectives:
Oceanic and International Operations
USER’S EXPECTATIONS AND CONCERNS Aena’s ADS Programme Manager
Presentation transcript:

Bringing Early Benefits … Building Momentum … Converging ! 2012 2014 2016 2018 2020 2022 2024 2013 2015 2017 2019 2021 2023 2025 Bringing Early Benefits … Building Momentum … Converging ! DCL FANS 1/A (DC S1P1) FANS 1/A En-Route Initial (DC S1P2-i) FANS 1/A En-Route Full (DC S1P2-f) B2 (DC S2) NextGen Implementation Plan (FAA) IOC B2 Rev B B2 D-RNP Adv-IM ATC Winds Indust. Syst Dev & Certif B2 Rev B is the convergence package leading the path for global convergence (gradual upgrades, including remote & oceanic ground systems) Validation results only No new functionality Standards WG78 / SC214 WG78/SC214 terminates (per TOR) B2 Rev B Validated B2-Initial Validated B2 Rev A Unvalidated Standards Available Standards Available Validation Period Legacy services (ATN B1 & FANS 1/A) 4DTRAD D-TAXI Indust. Syst Dev & Certif Indust. Syst Dev & Certif IOC B2 Rev B (Rev is TBC) European Master Plan (SESAR) IOC ATN B2 ATN B2 ADS-C EPP PCP Deployment (SESAR Step1 & 2) ATN B1 Bringing Early Benefits … Building Momentum … Converging ! December 18