GAUSS Work plan Software Week 6 March 2002 F.Ranjard / CERN.

Slides:



Advertisements
Similar presentations
LHCbComputing LHCb Computing Tasks. December Status of Computing Personnel m Currently available people insufficient to cover all activities o Estimate.
Advertisements

Simulation Project Major achievements (past 6 months 2007)
St Testing, Simulation and Monitoring (actually mostly simulation) Stephen Hillier Joint Meeting, Mainz, June 2001.
In-Line Cell Manager Configuration and Loading Date: Octobre2014.
Software Common Task Group Report Akiya Miyamoto KEK ALCPG09 30 September 2009.
5 November 2001F Harris GridPP Edinburgh 1 WP8 status for validating Testbed1 and middleware F Harris(LHCb/Oxford)
LHCb and DataGRID - the workplan for 2001 Eric van Herwijnen Wednesday, 28 march 2001.
ATLAS and GridPP GridPP Collaboration Meeting, Edinburgh, 5 th November 2001 RWL Jones, Lancaster University.
The huge amount of resources available in the Grids, and the necessity to have the most up-to-date experimental software deployed in all the sites within.
Event Data History David Adams BNL Atlas Software Week December 2001.
LCG Generator Meeting, December 11 th 2003 Introduction to the LCG Generator Monthly Meeting.
LHCb production experience with Geant4 LCG Applications Area Meeting October F.Ranjard/ CERN.
ATLAS is a general-purpose particle physics experiment which will study topics including the origin of mass, the processes that allowed an excess of matter.
5/2/  Online  Offline 5/2/20072  Online  Raw data : within the DAQ monitoring framework  Reconstructed data : with the HLT monitoring framework.
LHCb-ATLAS GANGA Workshop, 21 April 2004, CERN 1 DIRAC Software distribution A.Tsaregorodtsev, CPPM, Marseille LHCb-ATLAS GANGA Workshop, 21 April 2004.
Cisco Confidential © 2012 Cisco and/or its affiliates. All rights reserved. 1 Cisco UCS Director – Carmel (5.0) Ravikumar Pisupati Senior Manager, Engineering.
EGEE is a project funded by the European Union under contract IST “Interfacing to the gLite Prototype” Andrew Maier / CERN LCG-SC2, 13 August.
Post-DC2/Rome Production Kaushik De, Mark Sosebee University of Texas at Arlington U.S. Grid Phone Meeting July 13, 2005.
AliEn AliEn at OSC The ALICE distributed computing environment by Bjørn S. Nilsen The Ohio State University.
Server Installation Wshlab, EE. KUAS. Software  Windows 2000 Server that includes Service Pack3  ASP.NET ASP.NET 網頁製作教本, 王國榮, 旗標  Visual Studio.NET.
PDS4 Build 3b System Readiness PDS Management Council Face-to-Face Columbia, Maryland April 2-3, 2013 Sean Hardman.
INFSO-RI Enabling Grids for E-sciencE Using of GANGA interface for Athena applications A. Zalite / PNPI.
1 A Scalable Distributed Data Management System for ATLAS David Cameron CERN CHEP 2006 Mumbai, India.
Peter ClarkeATLAS software week / Berkley 9-13 May 2000ATLFAST status report Status of ATLFAST integration into Gaudi P.Clarke H.Phillips E. Richter-Was.
Resource Certification in MyAPNIC Robert Loomans Senior Software Engineer, APNIC.
MAUS Status A. Dobbs CM43 29 th October Contents MAUS Overview Infrastructure Geometry and CDB Detector Updates CKOV EMR KL TOF Tracker Global Tracking.
David Adams ATLAS Hybrid Event Store Integration with Athena/StoreGate David Adams BNL March 5, 2002 ATLAS Software Week Event Data Model and Detector.
WLCG Operations Coordination Andrea Sciabà IT/SDC GDB 11 th September 2013.
LHCb Simulation LHCC Computing Manpower Review 3 September 2003 F.Ranjard / CERN.
Availability of ALICE Grid resources in Germany Kilian Schwarz GSI Darmstadt ALICE Offline Week.
Virtualization and Clouds ATLAS position
GAUSS GiGa (G4 Interface for Gaudi Geant 4
Progress on NA61/NA49 software virtualisation Dag Toppe Larsen Wrocław
Migration of reconstruction and analysis software to C++
20th CAA/DAA Cross Calibration Meeting
European Organization for Nuclear Research
Elisabetta Ronchieri WP3
1. Open any Office 2016 app, such as Word, and create a new document.
Artem Petrosyan (JINR), Danila Oleynik (JINR), Julia Andreeva (CERN)
What are the steps to install Norton antivirus on PC?
LHCb Software Tutorial
Online Software Status
Operating systems and Internet services
MicroMegas Mechanical Meeting --- Cern April 2014
CernVM Status Report Predrag Buncic (CERN/PH-SFT).
How to Install AVG Antivirus?
US ATLAS Physics & Computing
District Test Coordinators Meeting
Year 2 Autumn Term Week 12 Lesson 1
Chapter 2: The Linux System Part 1
Various News From Detector Description
SICB under CMT Why? What is CMT? How to work with CMT? Package layout
What’s new in version 5 of GAUDI
Control and monitoring of trigger algorithms using Gaucho
Year 2 Autumn Term Week 12 Lesson 1
Course Preparation Check List
Simulation Project Structure and tasks
Muon Group Software Report
Eric van Herwijnen March 10th 2005
ATLAS DC2 & Continuous production
What’s new in version 4 of GAUDI
Agenda SICb Session Status of SICb software migration F.Ranjard
Andrea Valassi Pere Mato
Scrum: Daily Stand Up Meeting
SEAL Project Core Libraries and Services
Search for Manage Procurement Agents task in the Setup and Maintenance work area, Procurement offering, Procurement Foundation functional area. Select.
Planning next release of GAUDI
E W ©
2015 January February March April May June July August September
Presentation transcript:

GAUSS Work plan Software Week 6 March 2002 F.Ranjard / CERN

Contents Work plan set in October 2001 Gauss today Planning 5 December 2018 GAUSS Work plan

Work plan as set in October 2001 GAUSS should be able to read HepMC files is done A task for GAUDI GAUSS should be able to write an output at various levels of the processing and to restart the processing from where it was stopped. is done A task for GAUDI (writing) and GAUSS (reprocessing) GAUSS should be able to simulate various setups selected with job options. A task for GAUDI (condition data base) and GAUSS not yet done (see Sebastien’s talk on Friday) These tasks do not need all detectors in , they could be achieved by June 2002. Will be achieved before June 2002 5 December 2018 GAUSS Work plan

Gauss today The following packages have been installed yesterday on Lxplus. Gen/GeneratorModules/v1r0 ATLAS origin Gen/GeneratorObjects/v1r0 Gen/GeneratorUtils/v1r0 Gen/Pythia_i/v1r0 Gen/PYTIA/v61r52 interface package Sim/HepMC/v1r2 ATLAS package Sim/GiGaCnv/v4r0 Sim/Gauss/v1r0 application package 5 December 2018 GAUSS Work plan

Update of the work plan http://lhcb-comp.web.cern.ch/lhcb-comp/Simulation/planning/GAUSS.html 5 December 2018 GAUSS Work plan

Planning We still expect to have a framework with full functionality by June 2002. That would allow to add detectors when they are ready to come in. 5 December 2018 GAUSS Work plan