Mainttobe Breakdown Maintenance Process Production Operator/supervisor Investigate fault Breakdown event Quick Fix Yes No Fix it Maintenance Team Repair.

Slides:



Advertisements
Similar presentations
RECORD KEEPING Cooperative Development of Operational
Advertisements

Online Tenant Request System Reliable and accurate, the IMPAK online tenant request system significantly reduces telephone time and paperwork.
Operation & Maintenance Engineering Detailed activity description
© AMD Publishing/ Terry Hill 2005 T. Hill, Operations Management 2e. Palgrave Macmillan ISBN: / X Chapter 14 PROCESS AND DELIVERY SYSTEM.
Confidential - All Rights Reserved - © Capacity Analysis Fill in Supplier Name and Supplier Location (Address) Fill in Part Name (Ex: Bush, Button,
Build a Better Mousetrap: Quality Assurance and Call Specialist Performance Evaluation.
Fault location and Diagnosis
Workshop: Maintenance Work Requests May 3, Project Goals  Implement SAP Plant Maintenance system Provide integration with Finance, HR, and Materials.
Chapter 14 Network Design and Implementation. 2 Network Analysis and Design Aspects of network analysis and design Understanding the requirements for.
SIM5102 Software Evaluation
Maintenance and Reliability Ross L. Fink. Maintenance  All activities involved in keeping a system’s equipment in working order.
Lucas Phillips Anurag Nanajipuram FAILURE MODE AND EFFECT ANALYSIS.
The Agile vs. Waterfall Methodologies Systems Development:  the activity of creating new or modifying / enhancing existing business systems.  Objectives.
Total Productive Maintenance OVERVIEW. Target Audience : Senior Management Purpose of Module : To understand the need for TPM and the commitment required.
CBER Managed Review Process Sheryl A. Kochman Deputy Director, DBA, OBRR, CBER September 15, 2009.
Reliability Through Maintenance Planning and Scheduling Brad Simpkins MillerCoors Maintenance Process Manager MBAA-Rocky Mountain District Meeting March.
CalTime to PPS From a Timekeeper perspective: The timing of exempt employee leave reporting and how does the leave usage make its way to PPS. Controllers.
Front Page …..is an Asset Management tool designed to record and aid the analysis of activities affecting Production capability and costs. …..promotes.
SchedulingProducingControllingSchedulingProducingControlling.
Tango Asset Management Capabilities Presentation 1.Desktop & Web Architecture 2.Equipment Management 3.Condition Management 4.Data Mining 5.Parameter Trending.
RELIABILITY CENTRED MAINTENANCE (RCM)
1 Martin Lyall Terex Oklahoma Event May Factory World-wide Design, Engineering & Production Facility (28,000 m²) For TEREX ADT, RDT Trucks & Motor.
Module 4: Systems Development Chapter 13: Investigation and Analysis.
Advancing Productivity, Innovation, and Competitive Success The Association for Operations Management Achieving Inventory Accuracy G.L. (Jerry) Kilty,
Chapter 4 Process Design.
Quick Changeover Basics This material is provided by Industrial Solutions, Inc. and is intended for internal use only. Any reproduction or re-use outside.
Production Planning Group 4 Claudia· David· Lisa· Shakeia· Vicky.
Chapter 13 Project Management. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Define and give.
SchedulingProducingControllingSchedulingProducingControlling.
Planned Date of Action Person Responsible Completed (tick) Corrective Action Description of Malfunction Machine Name & Number Date of Insp’n Inspector.
PMO2000™ 1 Improved Reliability through PM Optimisation Project Team: Electrician Planner Mechanic Operator Reliability Engineer.
Autonomous Inspection Unit Seaham Quarry Site Contact: Richard Tomkins - Quarry Manager Phone:
06/01/20161 Benny Hoff TÜV NORD Sweden AB AFS 2002:1 Use of pressure equipment.
Module 4: Systems Development Chapter 13: Investigation and Analysis.
PC Support & Repair Chapter 4 Preventive Maintenance & Troubleshooting.
Tractor Safety, Operation, and Maintenance
Community Patrols of New Zealand National Database.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
Production Planning and control – ME 1009 Unit 1 Introduction.
Overview Rental Quote Overview
Principles of Information Systems Eighth Edition
Hour Savings Calculator Cost Savings Calculator
Tractor Safety, Operation, and Maintenance
8.4 Management of Postdelivery Maintenance
IENG 451 / 452 Stability: Total Productive Maintenance
“Prepare, Prevent, Respond”
Tractor Safety, Operation, and Maintenance
PDCA Problem Solving Guide
Off-Highway Diagnostic Improvement Project
IVG Driver Training Vehicle Inspection Report.
Conducting Self-Inspections
07 Master Data – Tools
Order-to-Cash (Project-Based Services) Scenario Overview
Chapter 13: Systems Analysis and Design
Total Productive Maintenance © Imants
Systems Analysis and Design
Quality Assurance Documentation
PREVENTIVE MAINTENANCE
Maintenance DA 5988-E. Maintenance DA 5988-E Maintenance DA 5988-E The data on DA Form 5988-E is divided into three sections. EQUIPMENT DATA The top.
Order-to-Cash (Project-Based Services) Scenario Overview
Designing an Experiment
April 4-5, 2018 The Four Seasons Baltimore
Designing an Experiment
Manufacturing Production Planning
Newton’s 2nd Law Investigation
OVERALL EQUIPMENT EFFECTIVENESS (O E E)
Change Tested or Implemented
Presentation transcript:

mainttobe Breakdown Maintenance Process Production Operator/supervisor Investigate fault Breakdown event Quick Fix Yes No Fix it Maintenance Team Repair fault Date & Time Recorded on production sheet Date & Time Recorded On Job Card Start and end date & time Recorded On Job Card Record repair details Include switch, valve, component numbers Etc. Immediate Action Request for maintenance mainttobe Job Card Nr: Equipment Name: Equipment Number: Date and Time requested: Requested by: Equipment Location: Cost Centre: dd/mm/yy hh:mm Fault Description: Containment Action: Work Completed Date and Time: Name: Sign: Maintenance Start Date & Time: Maintenance End Date & Time: Raise Immediate Action job card Record fault description Production sign Off on job Card recording date and time Notes: I built an MS Access database which uses the DateDiff function in a query, to calculate the time lapsed between the production Date and Time requested and the Work completed date and time This function is also used for the maintenance start - end times. I have found that this gives a more accurate Downtime Vs. Repair time comparison. Its more reliable than getting people to record when events or actions start and end. The job card field design and field names are flexible. Use whatever works in with currently used processes. The only fields I recommend sticking to, are the date, time fields and only because MS Access can calculate time lapsed based on date and time, in the same field. Capture Job card info on Database Modify TPM Checks or Actions Analyse data Corrective actions Modifications Machine stopped in cycle during clamping Proximity switch 6b2 not made – Adjusted actuator And tested

mainttobe Breakdown Analysis The Fault Code chart (Fig 2) offers the opportunity to analyse Repair Time and Downtime by fault code (causes). A line or even an specific machine can be selected within the chart to help narrow down route causes. This also helps when formulating fixes and modifications. An important benefit of cause analysis is that you can fine tune TPM inspections and actions. In the breakdown flow chart, we used a proximity switch example. In the chart above the code PRX (Proximity switch) is the highest cause of downtime. We can now decide to inspect the switch on a time based interval to ensure that the actuator is in the right place or even better redesign the actuator to ensure that it does not work loose. The point is, to reduce downtime for any given cause. With production and maintenance completing the date and time fields on the job card and capturing this information in the database, it becomes possible to get a more accurate reflection of Repair time Vs Downtime (Fig 1) This chart enables maintenance personnel to see which machine had the most breakdowns for a given period. the next step would be to view the Detail Report which I have also built into the database to look at data for the same period. This way one can see exactly what the reasons were for the downtime. With this kind of information available the maintenance team will be able to determine whether corrective work or a modification can be done to reduce downtime. Fig 1 Fig 2 Using MS Access Queries in Pivot chart view to analyse breakdowns