Gas Regional Investment Plan project

Slides:



Advertisements
Similar presentations
GRIP South South Region Second Edition Gas Regional Investment Plan SGRI – 13 December 2013.
Advertisements

Gas Regional Initiative – North West Region Investment workshop The Hague – 4 June 2010 Investment Project Regional Investment Plans Introduction to methodology.
GRIP South South Region Gas Regional Investment Plans SGRI – 23 September2013.
RCC meeting Monitoring implementation of network codes TITRE 18/10/2012 RCC meeting First thoughts on project approach for monitoring implementation of.
SG MEETING GRI NW– 28 N OVEMBER 2013 Incentives and Cross-border Cost Allocation in the Energy Infrastructure Package Benoît Esnault (CRE) Chair of the.
Update Transparency project RCC The Hague, 12 May 2011 Konrad Keyserlingk - Ofgem -
Gas Regional Initiative Region North-West Gas Regional Investment Plan Project Marie-Claire Aoun, Carole Mathieu CRE RCC Meeting The Hague – 4 April 2013.
RCC meeting Gas Regional Investment Plan project TITRE 18/10/2012 RCC meeting Gas Regional Investment Plan project CRE.
Global Competitiveness in a Liberalised EU Energy Market Wim Groenendijk, Member of the Board Brussels, 22 November 2011 Gas infrastructure and Markets.
Click to edit Master title style 1 5 th GRI Coordination meeting Brussels, 25 th October 2011.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
1 Gas Regional Investment Plan North West Europe GRI Meeting, November 25 th 2011.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
GRIP South South Region Gas Regional Investment Plans SGRI – 30 th April 2013.
Gas Regional Initiative Region North-West Transparency Project Nicola Meheran, Ofgem.
TSO Transparency project Gas Regional Initiative North West Nicola Meheran, Ofgem Regional Co-ordination Committee 15 September 2011.
David Halldearn 6 May Background Programme Board initial discussion last year at Stockholm Since then: Further analysis has been undertaken on.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
Gas Regional Initiative Impact of the 3rd package & creation of RIG Benoît Esnault (CRE), GRI TF co-chair NW GRI – RCC and ministerial meeting Paris, 8.
European Developments Transmission Workgroup 1 st December 2011.
09 May 2015 TAKE 1.5H TO UNDERSTAND AND SEE THE TYNDP 2016 PROJECTS ASSESSMENTS RESULTS Public webinar.
29th November 2016 Teleconference
10 year investment plan ERGEG approach and contribution
19th GRI Coordination Group meeting
21st IG Meeting South Gas Regional Initiative
Transparency Project GRI NW Region
40th IG meeting 29th November 2016
Enagás, GRTgaz, Reganosa, REN and TIGF
GRI-S : Infrastructures The Union list of projects of common interest
Gas Regional Investment Plan North West Europe 2013 Presentation for ENTSOG (November 26th 2013, Brussels) and GRI NW SG (November 28th 2013, Stockholm),
Update on CAM roadmap/ joint European Capacity Platform
Gas Regional Investment Plans
43th IG Meeting South Gas Regional Initiative
2009 TSO Transparency Gas Regional Initiative North-West
Work plan of GRI NW for 2011 Three out of four projects are started
Gas Regional Initiative
Feasibility of implicit allocation in the gas market
GRI NW European Energy Work Plan 2011 – 2014
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
ACER’s view on the future role of the Gas Regional Initiative
In depth analysis of TYNDP issues
Coordination of the (early) implementation of network codes
First thoughts on project approach for monitoring implementation of network codes Programme Office RCC meeting TITRE 18/10/2012.
Gas Regional Investment Plan North West
In depth analysis of TYNDP issues
26th February 2015 Teleconference
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
Gas Regional Investment Plan North West
First thoughts on project approach for assessing market liquidity within GRI NW Programme Office RCC meeting TITRE 18/10/2012.
Transparency Project GRI NW Region.
Gas Regional Investment Plan North West Europe 2013 Presentation for ENTSOG (November 26th 2013, Brussels) and GRI NW SG (November 28th 2013, Stockholm),
Update on CAM roadmap/ joint European Capacity Platform
ACER opinion on ENTSOG’s 2011 Ten-Year Network Development Plan
43th IG Meeting South Gas Regional Initiative
Enagás, GRTgaz, Reganosa, REN and TIGF
Incentives and Cross-border Cost Allocation in the Energy Infrastructure Package Benoît Esnault (CRE) Chair of the ACER Gas Infrastructure Task Force.
First thoughts on project approach for monitoring implementation of network codes Programme Office RCC meeting TITRE 18/10/2012.
40th IG meeting 29th November 2016
Coordination of the (early) implementation of network codes
Purpose Transparency is a critical element in ensuring an effective functioning internal European Gas market Gas Regulation No 715/2009, effective from.
In depth analysis of TYNDP issues
Gas Regional Initiative Update on progress and latest developments
29th November 2016 Teleconference
26th February 2015 Teleconference
GRI NW European Energy Work Plan 2011 – 2014
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
Coordination of the (early) implementation of network codes
ACER’s view on the future role of the Gas Regional Initiative
Work plan of GRI NW for 2011 Three out of four projects are started
Feasibility of implicit allocation in the gas market
Presentation transcript:

Gas Regional Investment Plan project CRE RCC meeting TITRE 18/10/2012

North-West Gas Regional Investment Plan 2011-2020 First GRIP for the NW region published on 21st November 2011 and presented at the last SG meeting 2 months consultation until 31 January 2012 One response from EFET: highlighting the importance of shippers’ commitments as the trigger for investment TSOs issued a formal response : clarification of the role and scope of TYNDPs Project gathering 15 TSOs from Belgium, Denmark, France, Germany, Ireland, Luxemburg, the Netherlands, Sweden and United Kingdom

The GRIP project in brief IG meeting of Sept 2011: decision to include the evaluation and improvement of the GRIP in the 2012 work programme Objective: Ensure that the next GRIP is most “fit for purpose” Action taken : RCC drafted recommendations on how to enhance the GRIP process (Letter sent to Fluxys as project coordinator mid-May) Providing for a better understanding of cross-border congestions Carrying out an infrastructure-based analysis Improving the interaction with stakeholders 22 June: Telco between NRAs and TSOs to discuss recommendations Potential added value of an infrastructure-based approach leading to a deeper analysis of cross-border congestions and remedies. Focus on giving insight on the projects of the region. Open to changes but these will need to be consistent with the enhancement of the next EU TYNDP (2013). Possibility for earlier involvement of stakeholders in drafting process. 3

Discussion with Fluxys on 5 October 1/2 Objective: update on the process and on the recent discussions between TSOs Meeting between TSOs – ENTSOG on 18 Oct (today) in order to discuss the following: Finalising the composition of the regions/GRIPs & designating the project coordinator for each GRIP. Alignment with PCI corridors apparently not a favoured option Synergies with the EU TYNDP process: Work on the GRIP to start in Dec 2012 (publication of EU TYNDP in Feb 2013). If an investment gap is identified at a EU level, additional simulation could be made at a regional level, using ENTSOG modeling tool. Finalisation of the GRIP by April : focus on regional congestions and on the infrastructure projects as part of a wider “strategy” for the NW region Publication of the NW GRIP between July and September 2013

Discussion with Fluxys on 5 October 2/2 Interaction with the stakeholders: TSOs willing to give a presentation at the next SG but only preliminary thoughts on the GRIP can be presented. Agree with RCC suggestion to present the draft GRIP and offer the market the opportunity to react: 1 hour session on the GRIP during ENTSOG workshops? Link with the PCIs EU-wide list of PCIs to be adopted in spring 2013, the next GRIP will reflect these developments Regular updates between the TSOs and RCC: Fluxys will inform project leader of the results of the meeting of 18 October. IG meeting this afternoon: regulators asked to give a short update on the ACER deliverable on the evaluation of the GRIPs.

ACER opinion on the GRIPs Overall assessment based on 3rd Package requirement for ACER to monitor the regional cooperation between TSOs. High level opinion from ACER Description and evaluation of content of each GRIP Assessment of the consistency and coherence (methodology, assumptions, coherence with the TYNDP) between the GRIPs and general recommendations. The GRI NW is the only gas region where an opinion on the GRIP was elaborated by the regulators ACER will use RCC recommendations as an input. The GRI NW will be presented as a good example of cooperation and dialogue between the RCC and TSOs (after the publication of the GRIP 2011-2020). CRE will follow the work done by ACER and update the RCC on progress. The opinion will be published in December 2012. 6

Thank you for your attention! marie-claire.aoun@cre.fr carole.mathieu@cre.fr