Competing in the Marketplace

Slides:



Advertisements
Similar presentations
Lean Manufacturing.
Advertisements

Bringing Sanity to Clinical Work Life Lean in Healthcare Michael Nelson, MD Blue Corn Professional Services, LLC.
5S training Office Environments.
5S BASIC TRAINING What is 5S and why do we want to do it?
CONTINUAL IMPROVEMENT
Financial Management Series Number 16 Implementing “Lean Government” Alan Probst Local Government Specialist UW-Extension Local Government Center (608)
John Deere Supplier Development 1 Kaizen Training Competing in the Marketplace “What factors are important to the customer?” John Deere - Supplier Development.
Making your Portable Restroom business Lean and mean – How to boost productivity and increase your bottom line.
SELF-DISCIPLINE Shitsuke
Introduction to 6S.
Lean Manufacturing Chris Poteet Scott Carroll.
CONTINUOUS IMPROVEMENT PROGRAM
Benefits of Lean Manufacturing: To benefit from Lean Manufacturing, the processes must be maintained consistently and correctly. Everyone involved must.
LEAN MANUFACTURING Jason Prior. Introduction to Lean  Overview of Lean in Toyota video.video  Main Concept: ELIMINATING WASTE  Not an acronym  Not.
Lean operations and JIT
Implementation of Lean at Rheem Manufacturing Presenter Dr. Joan A. Burtner Associate Professor Industrial and Systems Engineering Mercer University School.
Introduction to 5S. What is 5S? An easy definition is: Finding a place for everything and putting everything in its place. 5S is also the foundation for.
 2000, QualityToolBox.com, LLC, all rights reserved A STRATEGY FOR PERFORMANCE EXCELLENCE.
Introduction to Kaizen
Visual Workplace - A Prerequisite To Becoming World Class
© ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited Introduction to 5C TOTAL QUALITY MANAGEMENT 5C.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15 JIT and Lean Operations.
Value Analysis/ Flow Analysis
JIT and Lean Operations
Desigh by Parichat1 JUST IN TIME LIMIT JUST IN TIME JUST ON TIME JUST OUT TIME TIME
LeanSigma ® Fundamentals Module 4 – Specify Value.
A Workplace Organization Method
Philosophy and Key Concepts
Safety, Health & Environment
Dr. Joan Burtner1 Introduction to the Lean Enterprise as a Quality Improvement Initiative Presented By: Dr. Joan A. Burtner Industrial and Systems Engineering.
Visual Management Quick Review
Chapter 29 Waste Elimination. Objectives Select and apply techniques for eliminating or preventing waste. Pull systems, Kanban, 5S, standard work, & poka.
COSTING AND THE VALUE CHAIN CHAPTER 18 PAGE# 794 Faisal
Kaizen Eventing: The process of observation and the elimination of waste in a process.
 Discussion 40 minutes  Break 10 minutes  Discussion 40 minutes  Will understand what Standard Work is, and is not  Will be able to study and understand.
Implementation of Lean at Rheem Manufacturing
Just In Time Manufacturing Push Manufacturing vs. Pull Manufacturing Push System: Traditional production system as parts are processed based on the master.
Management Methodology Objectives 1.To create a clutter-free workplace for better movement and comfort of employees. 2.To avoid unnecessary accidents.
HOUSE KEEPING A base for any improvement u Even before you plan the direction you need to take, you must remove any obstacles to get a clear view of the.
SMOKE Process Make time for the work that matters Simplify Move
Transportation Waste Definition: the unnecessary act of taking or carrying someone or something from one place to another Office example: Movement of paperwork;
Mel Wendell – Mountain Pointe High School
Your own footer Your Logo.
Lean operations and JIT
3rd EARC 2012 GEMBA KAIZEN 3rd EAST AFRICAN REGIONAL HEALTHCARE ENGINEERING CONFERENCE & EXHIBITION (EARC 2012) DATE: 31st Oct-2nd Nov VENUE: ROMBO.
Lean Manufacturing Dr. Chander Arora.
Process-Flow Analysis
Reducing Designated Storage Area
Introduction to Lean Emily Varnado.
5S BASIC TRAINING What is 5S and why do we want to do it?
Welcome to my presentation
Visit for more Learning Resources
Lean Operations in Services
Continuous Improvement Coordinator
A STRATEGY FOR PERFORMANCE EXCELLENCE
METHOD OF WORK PLACE ORGANIZATION AND VISUAL CONTROLS
5S BASIC TRAINING What is 5S and why do we want to do it?
Lean and Quality Management The 5S
Just In Time.
161 Senior Cadet Development Weekend
5 S.
"Introduction To Japanese
Lean Enterprise MT Solutions Robert Nix - 10/18/2002.
Work Measurement and Lean Application
5S A Workplace Organization Method
L Maximizing Resources: Applying Lean Six Sigma Principles to Your Print Operation Monday March 18, AM – 12 PM.
Implementation of Lean at Rheem Manufacturing
A STRATEGY FOR PERFORMANCE EXCELLENCE
5S BASIC TRAINING What is 5S and why do we want to do it?
Introduction to Lean and Lean Training
Presentation transcript:

Competing in the Marketplace Kaizen Training Competing in the Marketplace “What factors are important to the customer?” John Deere - Supplier Development

Kaizen Training TIME: The single best indicator of competitiveness Set-up or Change-over Time Product Development Time Manufacturing Cycle Time Customer Lead Time / Delivery Time Working to reduce or minimize each of these times can make your company more valuable to both its internal and external customers.

Manufacturing Lead Times Kaizen Training Shrinking Lead Times Order Lead Times Manufacturing Lead Times Delivery Lead Times Reducing the overall time from receiving the order to delivering the product makes your company more responsive to the customer. This can become the deciding factor when the customer makes their selection. As can be seen, manufacturing is only one part of the entire process. Inputting, processing, and issuing orders is an area for improvement, as well as, assembly, loading and delivery to the customer`

Kaizen Training Where’s the Time in Lead Time This timeline represents an overall lead-time, with very little time spent on adding value to the product. Non-Value Added Time (NVA) 99% of Total Lead time Value Added Time (VA) 1% Common Concentrated on reducing VA time, with no attention given to NVA. Improvement Efforts Non-Value Added Time (NVA) 99% of Total Lead time VA 1/2 % Results of Common Improvement efforts, did not improve response time. VA time is reduced, but, the costs for those improvements in lead time was substantial.

Non-Value Added Time (NVA) Kaizen Training Where’s the Time in Lead Time When we look at attacking the NVA Activities in the Timeline and compare that to the original timeline: Greatest Opportunities are actually here! Non-Value Added Time (NVA) 99% of Total Lead time Value Added Time (VA) 1% NVA Time 95% of Total Lead time VA 5% Great Job!! This shows a 5X improvement in lead time

Kaizen Training Different Types of Activities Being able to tell the difference between NVA and VA activities is an important step in the Improvement Process. An activity that changes raw material to meet customer expectations. Value Added Activity (VA) Those activities that take time, or occupy space but do not add to the value of the product. Non Value Added Activity (NVA) You must ask yourselves “Would you as a customer be willing to pay for any NVA activity being performed to that NEW 4x4 Pickup you just ordered?”

Kaizen Training Some examples NVA Activities: Waiting on machine cycle Walking Unnecessary stock on hand Generating useless reports Unnecessary motion Transporting parts THE GOAL IS TO ELIMINATE THE NON-VALUE ADDED ACTIVITIES.

A definition: Destroy, in our minds, the concepts and techniques of manufacturing that we practice today. Create a vision of what our production system and manufacturing techniques should be. Carry out that Vision by breaking through the status quo. KAIZEN We must avoid the urge to discover more sophisticated and technological solutions to tasks we shouldn’t be doing at all.

Kaizen Training Basic Rules for Change Keep an open mind to change No such thing as a dumb question or idea Avoid spending money (Capital expense should be a last resort) Maintain a positive attitude Don’t’ make excuses & question current practices Think about how to do it, NOT why it can’t be done Just do it!! Have Fun!!!

Kaizen Training Steps on Team Development Forming Storming Norming This is the development of a multi-functional team with a variation of backgrounds and knowledge Storming Open & honest discussion, also brainstorming Norming Stage where the group agrees how to operate as a team Performing Agreement on solutions & taking action Adjourning Closing on the continuos improvement process after 30 days

Kaizen Training What is TAKT Time? TAKT time is how many minutes or seconds are needed to make one part when considering the daily volumes, to be produced in that workcell and the total time available to perform the job. TAKT time is NOT the time it takes to manufacture the product. It is based on customer demand. Who is the customer? The next operation Customer orders

Kaizen Training TAKT TAKT Time: TAKT Time Calculation Production Time Available / Period Number of Required Units / Period TAKT Production Time Available / Period (one shift): Breaks - 2 @ 10 minutes Shift Time ( 8 hrs. ) Clean-up at end of shift Production Time Available: - 20 mins. 480 mins. - 5 mins. 455 mins. or 27,300 secs. Units Required / Period (one shift): 10,500 Units Sold Monthly 21 Working shifts / month 500 Required units / shift 27,300 secs / shift TAKT Time: 54.6 secs. 500 units / shift

Kaizen Training The 5S Housekeeping Standards Sort Sanitize (Safety) First Step towards Continuos Improvement The aim of 5S is to create an atmosphere to keep a clean, organized, safe and efficient workplace for everyone. The foundation for the practice of 5S, comes from a Japanese program derived from these words, seiri, seiton, seiso, seiketsu and shitsuke. The 5S’s are a conventional approach towards maintaining and improving the work place. The following words have been chosen for the 5S acronym’s. Sort Sanitize (Safety) Sweep Straighten Sustain

Kaizen Training Meaning of the 5S’s Sort Straighten Sweep Examine everything at the workplace & identify what is needed and what can be discarded Straighten Organizing the way things are put away with efficiency, quality, and safety in mind. Need to decide where and how things should be put away and what rules should be obeyed to insure that it is maintained. Sweep (Scrubbing clean) Sweeping, scrubbing and cleaning of the building, machines, fixtures & tools so that all areas of the workplace are neat & tidy. This leads to early detection of mechanical problems before they become major breakdowns. Machines cry!

Kaizen Training Meaning of the 5S’s Sanitize Sustain (Safety) Insuring that each workplace is properly designed for safety. This is to protect every member from the dangers during the performance of their assigned tasks. Sustain (Standardize) Developing the practice necessary to continually participate in the 5S process. This requires that each of the S’s become a personal habit. This is the most difficult of the 5S’s, but it is the most important factor in achieving long term success. Establishing routines and procedures for maintaining and improving on the first four (S’s), incorporating visual management tools.

Kaizen Training WASTE

Kaizen Training Staffing Productivity Waste Productivity Do MORE with LESS Staffing Productivity Waste Productivity

WASTE SHIFT MINDSET CURRENT REQUIRED THINKING THINKING Processing Transportation Inventory Correction WASTE TYPES OF WASTE Over- Waiting Production Motion WASTE IS "TANGIBLE” IDENTIFY MANY SMALL OPPORTUNITIES -LEADS TO LARGE OVERALL CHAGE CONTINUOUS IMPROVEMENT WASTE NOT DEFINED REACT TO LARGE EXAMPLES REACTIVE IMPROVEMENT

ELEMENTS OF WASTE Definition Example 1. Transportation - Transporting 1. Transportation - Carrying farther than necessary or Tools to Point of Use temporarily locating, filing, stacking and moving parts (people, paper, information) is waste. 2. Correction - Doing something 2. Correction - Redo an Activity over is waste. Because of Error 3. Overproduction - Generating 3. Overproduction - Number of excess paper or information, or Copies generating information or paper too soon in a process is waste.

ELEMENTS OF WASTE Definition Example 4. Motion - Unnecessary work 4. Motion - Tools in drawers movements are a form of waste. 5. Waiting - Waiting for people, 5. Waiting - Meetings to start paper and information is waste - it stops work. 6. Inventory - Too much of 6. Inventory - Supplies anything is waste. 7. Processing - this is waste in 7. Processing - Typed when the process itself. Redundant handwritten would be activities sufficient

Kaizen Training Process requires ongoing inspection and enforcement to ensure “Standardized Work” is being followed Standards Inspect Enforce Process does not improve automatically Standardize Problem Solve Improve Stabilize . Identify Waste - Following standards will only maintain, not improve, the process. - Improvement focuses on the entire process.