Executive Vice President and Oshkosh Truck Corporation

Slides:



Advertisements
Similar presentations
CURRENT STATE OF ACQUISITION, TEST & EVALUATION ENTERPRISE NOVEMBER 2012 PRESENTATION TO INCOSE ENCHANTMENT CHAPTER Charles Pete Adolph.
Advertisements

Contract and Project Management: A Field Perspective Moderator Michael Peek, PE CCE CFM Office of Engineering and Construction Management.
DT&E Cmte - Walking The Line with Title 10 1 Beth Wilson Industry Co-Chair NDIA System Engineering Division, DT&E Committee Test Architect, Raytheon Company.
ESOH Committee Task Plan
Integrating Developmental and Operational Testing
Project management Project manager must;
Program Reasons underlying cost savings potential in purchasing
1 May 2009 ver. 5.5 Materiel Development Decision (MDD) MDA: Approves AoA Study Guidance Determines acquisition phase of entry Identifies initial review.
1 DoD Regional Councils Training March 2014 Janice Buffler Associate Director Subcontracting Policy and DoD Regional Councils DoD Office of Small Business.
Army Directorate of Public Works Support Contractor of the Year Carlos Garcia Owner/CEO KIRA Maximizing Return on Investment in Business Development.
NDIA SE Division Meeting February 13, Developmental Test and Evaluation Committee Beth Wilson, Raytheon Steve Scukanec, Northrop Grumman Industry.
Collaboration to Meet Future T&E Needs ITEA 14 September Mr. Mike Crisp Deputy Director, Air Warfare Operational Test and Evaluation.
EMIS 7307 T&E Part 2 1 Documents in flux. MNS - Mission need statement –Non system specific, a needed capability. Being replaced by Initial Capabilities.
CERTIFICATION In the Electronics Recycling Industry © 2007 IAER Web Site - -
Safety Risk Assessment/ Acceptance Air Force Materiel Command Chuck Dorney, P.E., C.S.P. Chief, HQ AFMC/SES DSN I n t e g r i t y - S e r v i.
NDIA Small Business Division Subcommittee on Improving IP Protection for Small Businesses Mission Statement Overview Alison Brown.
Promoting Effective Boards of Directors
RESPONSIBLE CARE ® POLLUTION PREVENTION CODE David Sandidge Director, Responsible Care American Chemistry Council June 2010.
Managing Fixed Price Development Programs Presented by John Pritchard Professor of Contract Management Defense systems Management College.
Elements of Effective Behavior Based Safety Programs
THE CONCEPTS of PERFORMANCE STANDARDS, CUMULATIVE STEPS AND VALIDATION STUDIES Dr. John Kvenberg, Acting Director, Office of Field Programs July 15, 1999.
Verification and Validation — An OSD Perspective — Fred Myers Deputy Director, Test Infrastructure Test Resource Management Center November 4, 2009.
Earned Value Management Update Nancy L. Spruill Director, Acquisition Resources and Analysis Office of the Under Secretary of Defense (Acquisition, Technology.
1 Program Management Systems Committee (PMSC) Contract / Subcontract Issues Working Group Industry Issues and Position Summary 13 August 2008.
Alpha Contracting Sole Source Negotiations between Government and Industry (13 CFR (c)(2))
Life Cycle Cost Savings by Improving Reliability Dr. Charles E. McQueary Director, Operational Test and Evaluation January 15, 2009.
Appendix B of RMG 1-5 Project Tasks for Mid Term Exam Provide items listed below in briefing chart format. 1. Project introduction/background/orientation.
Strength through Industry & Technology How is the Government Managing for Value? Program Management Systems Committee March 11, 2007 The Voice of the Industrial.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
The Evaluation and Re-evaluation Process Guidelines for Parents Karen Finigan, Director of Special Education & Michelle Giovanola, Lead School Psychologist.
1 Proposed Amendments to the Verification Procedure for In-Use Diesel Emission Control Strategies August 23, 2012 California Environmental Protection Agency.
Korea Responsible Care Council RESPONSIBLE CARE ® in KOREA March 2001 By KOREA RESPONSIBLE CARE COUNCIL.
ICOTE Meeting October, Chief Developmental Tester Project Status for ICOTE October 2014 Brendan Rhatigan – Lockheed Martin.
A LOOK AT AMENDMENTS TO ISO/IEC (1999) Presented at NCSLI Conference Washington DC August 11, 2005 by Roxanne Robinson.
Manager Training Deck: Equip Managers to Conduct Effective Pay Conversations Customization Notes: Please note this deck is intended for you to customize.
DoD Template for Application of TLCSM and PBL
MNS - Mission need statement
Subaward - 2 CFR A formal legal agreement between your institution and another legal entity An award provided by a pass-through entity (PTE) to.
Best Practices in Performing DSA Legacy Reviews
U.S. FDA Center for Devices and Radiological Health Update
Rockingham County Public Schools Teacher Evaluation Process
The Administration’s Small Business Agenda
Strength Through Science
ISA 201 Intermediate Information Systems Acquisition
Cumulative IOT&E Results Through FY 2008
Importance of T&E Connotations
OPG’s Views on Incentive Regulation and the Power Advisory LLC Report
ISA 201 Intermediate Information Systems Acquisition
Managing Fixed Price Development Programs
Capital Asset Projects executed by the
Overview – Guide to Developing Safety Improvement Plan
Information Required for Milestone and Decision Reviews
Survey data: Ties between innovation and the business units
.  What is Ethics?  How is ethics related to economics.  The role of markets and market system.  Meaning of business ethics. (ch 03 Rezaee)  Governance,
Overview – Guide to Developing Safety Improvement Plan
Defense Contract Incentives and the Health of the Defense Industry DAEC October 7, 2003 Mr. Terry Marlow Vice President Government Division.
Operational Test & Evaluation
OT&E/DT&E How Can We Make it Better?
RST processes Session 5 Presentation 2.
#40 Separation History and Physical Examination #41 Transitional Healthcare Benefits Ask the class to stand if they’ve ever broken a bone, ask if they’ve.
Walk the Talk A Discussion on Frontline Worker Safety.
Competence & Commitment in Conservation Project Planning
AGAIN AND AGAIN WE SEE PROJECTS, TURNAROUNDS AND MODIFICATIONS SIGNIFICANTLY EXCEEDING BUDGETS AND TIME PLANS.
Fact: Standards Mean Business To industry, government and the bottom line
How to conduct Effective Stage-1 Audit
Role and Responsibilities of Safety Officers
Perspectives on Transforming DT and OT Industry-Government Roundtable
Production EVM Working Group Outbrief May 2010 PMSC
Delivering cost reduction through multi-client campaigns
Presentation transcript:

Executive Vice President and Oshkosh Truck Corporation Industry Weighs in on the Value/Impact of Operational Test & Evaluation/Developmental Operational Test & Evaluation W. John Stoddart Executive Vice President and President - Defense Oshkosh Truck Corporation  

Benefits of OT&E Objective and benefits of Operational Test and Evaluation/Developmental Operational Test and Evaluation are obvious: Demonstrate compliance with all operational requirements in realistic field conditions, in a timely manner, to provide the best possible system to the soldier, sailor, airman and marine!  

Tester/Contractor Perspectives While all agree on the objective of OT&E, a dichotomy appears:  Tester Goal: Verify system performance in a conservative manner and report on all significant issues prior to fielding. Contractor Goal: Provide the best value in terms of contract compliance, cost, performance and schedule.  In short, the tester views OT&E as a reduction of risk, while the contractor sees OT&E as a programmatic risk!

Flashback 2001 - Acquisition Streamlining Versus Test-fix-test   Opportunities and Issues:  DoD 5000.2-R encourages a combined DT/OT to achieve time and cost savings. DOT&E Annual Report to Congress says “There is a disturbing trend of programs entering dedicated OT&E without having completed sufficient operationally relevant development test and evaluation.”  Too often the result of concurrent DT/OT is the successful completion of DT and an OT equipment rating of unsuitable.  Possible Solutions:  Delay start of OT until partial completion of DT. Allow controlled fixes from DT to be applied in OT. Develop provisions for assessment of fixes to OT problems

Flashback 2001 – Contractor Involvement in Operational Tests Opportunities and Issues:  The law (10 USC 2399) says “…No person employed by the contractor for the system being tested may be involved in the conduct of the Operational Test and Evaluation…”  The law does not say the contractor cannot observe the test, have access to documents (i.e., the TEMP), participate as an observer in the IPT’s, or be provided early test data.  Contractor involvement/observation can help in acquisition streamlining, thus decreasing test time and cost.  Possible Solutions: Allow contractors to observe tests. Allow access to the TEMP and IPT’s Provide early test data to plan fixes

Progress Update on Improvements to the OT Process (Contractor Perspective) Delay start of OT until partial completion of DT. Many program schedules now reflect OT starting after significant DT work has been completed. Allow controlled fixes from DT to be applied in OT. OT directors have allowed fixed from DT in some situations, always if safety is involved. Develop provisions for assessment of fixes to OT problems. Little progress has been demonstrated in this area.  Allow Contractors to observe tests. Some progress has occurred here, however, there are still concerns on contractor involvement/influence of test results.  Allow access to the TEMP and IPT’s. contractor involvement in test planning meetings and review of TEMP’s has improved greatly.  Provide early test data to plan fixes. Contractor awareness of test issues has improved, however, still second or third hand information. Real time access to TIR’s still a concern.

Today’s Reality   Significant progress/improvement has been made with regard to the acquisition process as it relates to concurrent DT/OT, however, there are still opportunities for Government and Contractor personnel to work together.  Equipment manufacturers also provide services such as Contractor Logistics Support (CLS) and Field Service Representatives (FSR’s) to support fielded equipment, in many cases embedded with the units.

NDIA Industrial Committee on Operational Test and Evaluation (ICOTE) Challenge What are the next steps to further improve the DT/OT process as it relates to acquisition streamlining?  Does the current DT/OT process reflect reality, given the equipment manufacturers’ efforts to support the war fighter through contractor logistics support and field service representatives?