IHEP Cryomodule Status

Slides:



Advertisements
Similar presentations
Superconducting Spoke Resonator Cavities and Cryomodules
Advertisements

Progress and Plan for Superconducting RF Cavity RF Group.
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
Cryo Capture Cavity II Progress Mike McGee April 6, 2005.
RF Unit Test Facility at NML & CM1 Test Plan Bob Kephart Fermilab IWLC-10 October 20, 2010.
Question 27: Outline the key steps for industrialization of machine components and the likely remaining vulnerabilities in achieving them. Achieving industrialization.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
1.3 GHz SRF Cavity R&D Plan Jiyuan Zhai ILC Group, IHEP 3 rd IHEP-KEK 1.3 GHz SRF Meeting, 7 Dec 2010, Beijing.
F Status and Plans for SRF Facility Sergei Nagaitsev May 18, 2007.
STF Plan & Schedule H. Hayano, KEK. Superconducting RF Test Facility Comprehensive Test Facility dedicated to ILC SC-RF R&D (expandable to FEL, ERL) for.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
FNAL Cavities for S1 Global Jim Kerby ALCPG 09. FNAL Deliverables Discussed in meetings 15/16 July and 10/11 Sept, and Webex and s 9/30/20092FNAL.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
STF status Mar.22,2005 H. Hayano, KEK. STF Phase 1 Test Accelerator DC gun : 200kV CsTe photocathode for quick start UV(262nm) Laser (337ns spacing, 2820bunches)
ILC WG2 (Main Linac System) status & report H. Hayano, KEK.
S.Noguchi (KEK) ILC08 Chicago , Nov . 17, Cavity Package Test in STF STF Phase-1 E. Kako, S. Noguchi, H. Hayano, T. Shishido, M. Sato, K. Watanabe,
D.Proch, DESY; GDE meeting Vancouver 06 Technical systems: Cavity Report Overview on costing activities for ILC –European costing method Overview industrial.
E. KAKO (KEK) 2010' Feb. 05 STF Meeting for S1-G Global Design Effort 1 Preparation Status at KEK for S1-Global Eiji Kako (KEK, Japan)
Cryomodule Development at Fermilab Don Mitchell Representing the SRF engineering community at Fermilab April 20, 2009 Tsukuba, Japan TILC09.
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
KEK Status Report Kirk 04/Mar/20151LCC 5th SCRF Meeting.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
I. Ben-Zvi Update Ilan Ben-Zvi for the Stony Brook, BNL and AES SPL teams Presented by Rama Calaga.
Summary ( Cryomodule, Plug-compatible Interface) Norihito Ohuchi.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
1 K.Jensch, D.Kostin, DESY - Cryomodule components List S1 – DESY parts DESY parts for the S1 Cavity-String.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe.
IHEP GHz 9-cell Cavity R&D Status and Plan The Third IHEP-KEK 1.3GHz SC Technology Collaboration Meeting Dec. 7-8, 2010, IHEP, Beijing GAO Jie,
Check the component list with FNAL solid model Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
Detail plan of S1-Global H. Hayano (KEK),
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
S1-Global status report KEK Norihito Ohuchi 2008/11/171ILC08-GDE-Meeting-Chicago.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
Cryomodule Assembly Facility (CAF) at Fermilab Tug Arkan (FNAL) FNAL-LBNL joint meeting on SRF Cavities and Cryomodules March 15, 2012.
Visiting DESY for S1-G module Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
Cryomodule Assembly Facility Fermilab Cleanroom: Assembly/Disassembly Tools Tug Arkan 1.
FNAL Cryomodule Assembly and Installation Plans Tug Arkan May 22, 2015.
A Proposal for FJPPL (TYL) Development of Frequency Tuners Optimization and Cryomodule Integration for 1.3 GHz SRF Cavities G. Devanz, F. Nunio, O. Napoly.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Vacuum Related Procedures and Tools of IHEP ILC Test Cryomodule Assembly Jiyuan Zhai (IHEP) TTC Topical Workshop on SRF Cryomodule Clean Room Assembly.
JLAB Cryomodule Assembly Facilities Visit Report Tug Arkan, Yuriy Orlov March 26, 2012.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
Recent Result for the STF-2 Cryomodule Operation
Status of the M-ECCTD F. Peauger - P. Bosland
CERN – Zanon discussions
Cryomodule test stand at ESS site
Status and plans for the 3.9 GHz section of XFEL
WP5 Elliptical cavities
FRIB Cryogenic Support
WP-46 XFEL 3rd harmonic system XFEL Project Progress Report (1-2010)
Meeting for S1-Global module design Cryomodule and Cryogenics
for the FNAL/ANL, JLab, and Cornell cavity teams
Activities of Cavity Fabrication Facility at KEK
TTC Topical Workshop on SRF Cryomodule Clean Room Assembly
S1-G Webex meeting Global Design Effort
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
Recent SCRF Activities in IHEP
Progress in Asia Hitoshi Hayano,KEK,
KEK injector cryomodule
IHEP ILC Cavity Status Jiyuan Zhai (IHEP)
Prototype cryomodule development
CEPC Waveguide HOM 5-cell and 2-cell Cavity Study and EP Facility
SNS PPU Cryomodule Design Overview
Presentation transcript:

IHEP Cryomodule Status Jiyuan Zhai On behalf of the IHEP ILC SRF R&D Team AWLC14, May 14, Fermilab

Outline IHEP ILC-TC1 Cryomodule Assembly Horizontal Test Facilities Cavity Fabrication

IHEP ILC-TC1 Cryomodule Short cryomodule with one low- loss large grain 9-cell cavity (VT 20MV/m, Q0=1.4E10) Cylindrical magnetic shield inside helium vessel STF type input coupler and tuner Module assembly to complete in July 2014, horizontal test in 2015

Cryomodule Assembly Assembly Hall in IHEP Building #2

Cavity Clean Room Assembly

Cavity Clean Room Assembly Beam Tube Assembly Gate Valve Assembly Cavity Assembly Prep Careful Clean Room Assembly Operations (PFFA)

Cavity Clean Room Assembly Slow Pumping and N2 Purging 2mm Middle-position slide jack tuner with four guiding rods Helium vessel bellow and tuner flanges sagging when loose the support fixtures; will be restored when the tuner is installed. Coupler Mounting Test

Outline IHEP ILC-TC1 Cryomodule Assembly Horizontal Test Facilities Cavity Fabrication

Horizontal Test Facility Layout IHEP Building #1 Cryogenic Plant In commissioning Power Source Deliver in end 2014 Tunnel Horizontal test & beam test Vertical test Dewar Deliver in September

Cryogenic System in Commissioning Cold box and compressor: refrigeration 1000W@4.5K, liquefication: 284 L/h 2K pumps: 8000 m3/h @ 3100 Pa

1.3 GHz Klystron and Modulator Ordered 1.3 GHz 5 MW Klystron and Marx Modulator will deliver in end 2014

Outline IHEP ILC-TC1 Cryomodule Assembly Horizontal Test Facilities Cavity Fabrication

TESLA-like Cavity Fabrication End groups EBW ongoing Cavity EBW to be done in July Process and test at KEK

TESLA Cavity Production HERT Company FG TESLA 9-cell cavity Pressing and EBW test and optimization One prototype in 2014

Summary IHEP ILC test cryomodule assembly is ongoing and will be finished in July 2014. Hardware preparation, environment and component cleanliness, vacuum, alignment and assembly procedures are studied and conducted carefully for cavity clean room assembly. Cryogenic system and power source will be ready in end 2014 for the module horizontal test. Prototype production of a fine grain TESLA-like 9-cell cavity and a fine grain TESLA 9-cell cavity will be done in mid and end 2014 respectively.