WATER DISPLAY Deck Operations.

Slides:



Advertisements
Similar presentations
Damage Control.
Advertisements

41UTB BOAT CHARACTERISTICS & CREW RESPONSIBILITIES.
Layer Hen House Production
Inspected in port Shanghai from 26th to 28th Sept by NCL
Mohawk II Damage report – aug Structural damages Bulb, fishing vessel approx. 10 knots Severe damage to hull from keel to reeling 7-8 ribs broken.
Solar Controller (port berth cabinet) DC System Switch BS #9006 (sb aft bunk) Switch BS#9006 (sb aft bunk) Auto Charge Relay BS #7610 (sb aft bunk) Start.
 1) The front coach lights are controlled by the photo switch.  2) Water heater breaker is labeled.
Search and Rescue Trailer Bungay Fire Brigade 2013.
How would you explain this on the 3394? If Fire Erupts on YOUR Boat If Underway, stop the boat Have everyone who is not wearing a PFD put one on Position.
Ship Profiles.
LESSON TWO BEFORE YOU GET UNDERWAY. Key Topics Vessel’s capacity Vessel’s capacity Float plans Float plans Fueling a vessel Fueling a vessel Trailering.
Pre-Fire Survey NAME HERE. Amidships Crane- 01 Qtr Deck Midships Zone: 3.
United States Power Squadrons ® B Built in Fuel System.
Detention Basin Saw Tooth Outlet Structure. Detention Basin Water Flow In Saw Tooth Outlet Structure On Site Water Off Site Water.
Remodeling my room From cluttered to clean. My main goals of remodeling my room were… 1.Having a color coordinated theme 2.Organizing all my cluttered.
SHIP NOMENCLATURE. DO NOW  In the United States, we commonly use the English system of measuring length & distance (feet, inches, miles…).  In most.
Module 2: General Working Conditions 2.5 Confined Space Entry Susan Harwood Grant Number SH F-23.
The Development of Specialized Skills Ship-Handling & Navigation Operation of Deck Equipment, ie. Anchors, Knot Tying, Line Handling Dealing with Emergencies,
Objective 6.02 INTERPRET simple drawings. Architectural drawings Drawings that contain information about the size, shape, and location of all parts of.
U.S. Coast Guard Homeland Security 8/18/2015 Marine Safety Unit Paducah, Towing Vessel Bridging Program 1 MSU Paducah Towing Vessel Bridging Program LTJG.
Safety on Board Fire safety  Common causes of fire  Smoking below decks  Solvents paints stored below  Gas build up in the bilges  Faulty wiring.
1. KEY FEATURES VESSEL IS OCCUPIED WITH FULLY AUTOMATIC SYSTEM IN SUCH A WAY THAT 4 CREW CAN OPERATE THE VESSEL MANEUVERING AND CARGO LOADING/DISCHARGING.
Lesson 17 KEEPING WATCH. WATCHKEEPING 4 STCW 1978 (1995) 4 Watch (1) time period; (2) personnel 4 Personnel: Engineer officer in charge (watchstanding.
Boating is fun… we’ll show you how 1 Going Boating Chapter 1 Section 3 America’s Boating Course 3 rd Edition Presented by the St Paul Sail and Power Squadron.
exhaust regulator valve
Electromagnetic Fields. A magnetic field is an area where the forces of attraction from a magnet are working. An electromagnetic field has the same effect.
Dearness Conservation Dearness Environmental Society.
Circuits Series & Parallel.
Engineer Training Checking the Motor’s Rotation Direction TJ8300 / TJ8500 Checking the Motor’s Rotation Direction.
STBD. BOAT DECK MONITOR HEAVY CORROSION FOUND INSIDE ELECTRICAL MOTORS RENDERING THE MONITOR NON-OPERATIONAL.
Diesel Fuel - Fill Place all spill safety equipment where needed
DIESEL FUEL FILL 1.Secure Fireboat 2 to fueling dock, fueling vessel, or vessel to receive fuel (Fig ). 2.Develop communications as needed, including.
NOVEC Fire Suppression System
Weekly Checks Monday – VSP Room Tuesday – Pilothouse System Controls Wednesday – Starboard / Engine Room Thursday – Foam Room Friday – Port / Engine Room.
Monday – VSP Room weekly checks Visually Check: Hvac system for leaks & valve settings Fresh water system for leaks & valve settings VSP linkage Autopilot.
BOAT Regulatory Gross Tonnage – 199 Registered Length – 96’7” Registered Breadth – 29’ Registered Depth - 13’3” Draft – 14’ 6” Air Draft – 46’
Power Distribution System General Location. Power Distribution The Main Switchboard is the hub of the electrical distribution system. Everything ties.
PROSSER PUMP Long Beach Fire Department. BASIC SET- UP Components Main dewatering pump Junction box Attached power cord Additional extention cord.
A/C Power Systems General Locations. This module will cover the General Locations of the A/C Power Systems through out the vessel. The A/C Power Systems.
Internal Communications Systems
Fwd. Anchor Windlass / Capstan
HOW TO SAVE ENERGY AT HOME SMOLYAK.A ERMOLAYEVA.A.
Fire/General Service/Ballast Pumping Systems
Bilge Pumping Systems General Locations.
Roll up Door CHECK GEAR OIL CAPACITY MAINTAIN AT FILLER PLUG LEVEL
Getting Underway – Engine room
1 FB 2 STARTING PROCEDURES RADIO MASTER SWITCH UP IS “ON” Assess readiness to get underway Energize the following: 1) Radio Master Switch, Panel DC-1 NOTE.
Life Line. Belay Line Canteens Clean and change water.
Reducing Your Carbon Footprint. Light & Electricty Turn off all electronic devices When they are not being used This includes power strips, working power.
Home Depot Store 1085 High Dust. BeforeAfter SECURITY CAMERA.
1 Chapter 2 Before You Get Underway. 2 Capacity Plate Why is this important? 1.
Fridge -4 o C Pilot test 12 – 15 Nov 07 Incubator 37 o C Incubator 32 o C Room temperature 23 o C Purchased at Chinese Medicine Store Packs of 20 beans.
Methods to save energy. Turn on the lights and fans when there is no one in the room. 
Shore Power Connection Check the connection on the boat Check the breaker on the dock ON OFF.
Unit 9.1_Lesson 4_CD Resource 4a_Sensors and flowcharts Sensors and Flowcharts.
General Locations and Operation
Light Bulb Changing Procedure
Sensors Control Systems with Flowol.
Objective 6.02 INTERPRET simple drawings
Spill Prevention.
Electromagnetic Fields
General Alarm Used by the Pilot house to get an urgent message to the whole crew To sound the general alarm the lever is located at both Pilot consoles.
LIGHTING OVEN Steps to Follow.
Camera Connections 1 4 Connect camera to outlets inside grey box in the Pedestal. Turn Monitors on to channel 31. Turn toggle switch on, Aft plenum toggle.
Name That Symbol!.
Firefighting equipment
Around the room Orders of operations.
How can we reduce our footprint in school?
MT ASSA – Register number 2305
Compressor Operating Instructions
Presentation transcript:

WATER DISPLAY Deck Operations

SHOREPOWER Cover Outlet

SECURE EVERTHING Lines Tools Chairs Line Reel Cover Crane Pedestal Covered Crane Controls Covered Take A Lap

Engine Room Escape Hatch Secure Hatch

ROLL UP DOOR Close Door

EQUIPMENT ROOM CONTROL STATION Off On/High On/High VSP Water Tight Door Light / Off Forepeak Bilge Pump Engine Room Water Tight Door / Off Fwd Ballast Bilge Pump

WEATHER TIGHT DOORS Dog Doors Opened Dogged Dog Doors Main Deck - Equipment Room, Multi-Purpose Room Boat Deck - Pilot House, Fwd. Plenum

FWD PLENUM FAN On Off Turn Fan Off

FOREPEAK HATCH Fwd Dog Hatch

Stop Stop FOREPEAK HATCH Fwd

Mate Deckhands Assists in Pilot House as needed Oversees any deck operations Lookout Deckhands Assists in Pilot House as needed Lookouts