Scheduling.
Advertisements

Scheduling for Low-volume Operations Chapter 15 Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation.
© The McGraw-Hill Companies, Inc., 1998 Irwin/McGraw-Hill Module 11 Operations Scheduling Chapter 16 (pp ) Work Center and definitions  Objectives.
Scheduling.
Operations Scheduling
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc., Upper Saddle River, N.J Operations.
1-1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved 1 Chapter 19 Operations Scheduling.
Operations Scheduling
Scheduling. Production Planning Process Process Planning Strategic Capacity Planning Aggregate Planning Master Production Scheduling Material Requirements.
DOM 102: Principles of Operations Management Operations Scheduling
Scheduling Chapter 19.
Short-Term Scheduling
5. Operations Scheduling
© 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Operations Management Short-Term Scheduling Chapter 15.
Roberta Russell & Bernard W. Taylor, III
Operations Management
1 ISQA 459/559 Mellie Pullman Scheduling Shop Floor.
1 Chapter 15 Scheduling. 2 Scheduling: Establishing the timing of the use of equipment, facilities and human activities in an organization Answering “when”
Scheduling – Day 2. Production Planning Process Process Planning Strategic Capacity Planning Aggregate Planning Master Production Scheduling Material.
CHAPTER 19 Scheduling Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
Short-Term Scheduling
1. Facility size 2. Equipment procurement Long-term
Operations Management Short-Term Scheduling 短期批程 Chapter 15
Scheduling.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
15 - 1© 2014 Pearson Education, Inc. Short-Term Scheduling PowerPoint presentation to accompany Heizer and Render Operations Management, Eleventh Edition.
15 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall 15 Short-Term Scheduling PowerPoint presentation to accompany Heizer and Render Operations.
© 2006 Prentice Hall, Inc.15 – 1 Operations Management Chapter 15 – Short-Term Scheduling © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany.
15-1Scheduling William J. Stevenson Operations Management 8 th edition.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
© 2006 Prentice Hall, Inc.15 – 1 Operations Management Chapter 15 – Short-Term Scheduling © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany.
Operations Management Short-Term Scheduling
15-1Scheduling William J. Stevenson Operations Management 8 th edition.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
1 1 Slide Short – Term Scheduling Professor Ahmadi.
Topics To Be Covered 1. Tasks of a Shop Control Manager.
Operations Management Operations Scheduling
Scheduling for Low-volume Operations Chapter 15 Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation.
1 Manufacturing Operations Scheduling B2 [ ] B2 [ ] E5 [ E5 [ P9 [---] P9 [---] D1 [ D1 [
Scheduling. Definition of scheduling Establishing the timing of the use of equipment, facilities and human activities in an organization In the decision-making.
Scheduling. Scheduling: The allocation of resources over time to accomplish specific tasks. Demand scheduling: A type of scheduling whereby customers.
1 Chapter 10 Scheduling 1 Chapter 10 SCHEDULING McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved.
Scheduling for Low-volume Operations
Scheduling. Scheduling of Operations A planning tool for the short term  Provides an opportunity to make use of new information as we approach real time.
Scheduling Operations IDS 605 Spring Data Collection for Scheduling l Jobs l Activities l Employees l Equipment l Facilities Transparency 18.1.
Chapter 16 & 9 Scheduling Work & Employees. Scheduling Outline What needs to be scheduled? –doctor’s office, restaurant, mfg. plant, hospital –employees.
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
Scheduling.
16 Scheduling (focus on sequencing; FCFS, SPT, EDD pages , and Johnson’s rule pages ) Homework; 6, 7, 11.
15 - 1© 2014 Pearson Education, Inc. Short-Term Scheduling PowerPoint presentation to accompany Heizer and Render Operations Management, Eleventh Edition.
15 - 1© 2011 Pearson Education 15 Scheduling for the Short Term PowerPoint presentation to accompany Heizer and Render Operations Management, 10e, Global.
Short-Term Scheduling
Short-Term Scheduling
Scheduling in the Short-Term
Operations Management Short-Term Scheduling Chapter 15
Operations Management Short-Term Scheduling Chapter 15
Inputs and Outputs to Aggregate Production Planning
PRODUCTION ACTIVITY CONTROL (PAC)
CHAPTER 8 Operations Scheduling
Production Activity Control
PRODUCTION ACTIVITY CONTROL (PAC)
OPERATIONS SCHEDULING AND SEQUENCING
Chap 11 Learning Objectives
Scheduling for the Short Term
Short-Term Scheduling
8 Job Sequencing & Operations Scheduling CHAPTER Arranged by
Sequencing Sequencing: Determine the order in which jobs at a work center will be processed. Workstation: An area where one person works, usually with.
Scheduling Seminar exercises
Inputs and Outputs to Aggregate Production Planning
Presentation transcript:

Short-Term Scheduling 15 PowerPoint presentation to accompany Heizer and Render Operations Management, 10e Principles of Operations Management, 8e PowerPoint slides by Jeff Heyl © 2011 Pearson Education, Inc. publishing as Prentice Hall

Delta Airlines About 10% of Delta’s flights are disrupted per year, half because of weather Cost is $440 million in lost revenue, overtime pay, food and lodging vouchers The $33 million Operations Control Center adjusts to changes and keeps flights flowing Saves Delta $35 million per year © 2011 Pearson Education, Inc. publishing as Prentice Hall

Scheduling Issues Scheduling deals with the timing of operations The task is the allocation and prioritization of demand Significant issues are The type of scheduling, forward or backward The criteria for priorities © 2011 Pearson Education, Inc. publishing as Prentice Hall

Managers Must Schedule the Following Scheduling Decisions Organization Managers Must Schedule the Following Arnold Palmer Hospital Operating room use Patient admissions Nursing, security, maintenance staffs Outpatient treatments University of Missouri Classrooms and audiovisual equipment Student and instructor schedules Graduate and undergraduate courses Lockheed Martin factory Production of goods Purchases of materials Workers Hard Rock Cafe Chef, waiters, bartenders Delivery of fresh foods Entertainers Opening of dining areas Delta Air Lines Maintenance of aircraft Departure timetables Flight crews, catering, gate, ticketing personnel Table 15.1 © 2011 Pearson Education, Inc. publishing as Prentice Hall

Forward and Backward Scheduling Forward scheduling starts as soon as the requirements are known Produces a feasible schedule though it may not meet due dates Frequently results in buildup of work-in- process inventory Due Date Now © 2011 Pearson Education, Inc. publishing as Prentice Hall

Forward and Backward Scheduling Backward scheduling begins with the due date and schedules the final operation first Schedule is produced by working backwards though the processes Resources may not be available to accomplish the schedule Due Date Now © 2011 Pearson Education, Inc. publishing as Prentice Hall

Forward and Backward Scheduling Backward scheduling begins with the due date and schedules the final operation first Schedule is produced by working backwards though the processes Resources may not be available to accomplish the schedule Often these approaches are combined to develop a trade-off between a feasible schedule and customer due dates Due Date Now © 2011 Pearson Education, Inc. publishing as Prentice Hall

Sequencing Jobs Specifies the order in which jobs should be performed at work centers Priority rules are used to dispatch or sequence jobs FCFS: First come, first served SPT: Shortest processing time EDD: Earliest due date LPT: Longest processing time © 2011 Pearson Education, Inc. publishing as Prentice Hall

Job Work (Processing) Time (Days) Sequencing Example Apply the four popular sequencing rules to these five jobs Job Job Work (Processing) Time (Days) Job Due Date (Days) A 6 8 B 2 C 18 D 3 15 E 9 23 © 2011 Pearson Education, Inc. publishing as Prentice Hall

Job Work (Processing) Time Sequencing Example FCFS: Sequence A-B-C-D-E Job Sequence Job Work (Processing) Time Flow Time Job Due Date Job Lateness A 6 8 B 2 C 16 18 D 3 19 15 4 E 9 28 23 5 77 11 © 2011 Pearson Education, Inc. publishing as Prentice Hall

Job Work (Processing) Time Sequencing Example FCFS: Sequence A-B-C-D-E Job Sequence Job Work (Processing) Time Flow Time Job Due Date Job Lateness A 6 8 B 2 C 16 18 D 3 19 15 4 E 9 28 23 5 77 11 Average completion time = = 77/5 = 15.4 days Sum of total flow time Number of jobs Utilization metric = = 28/77 = 36.4% Total job work time Sum of total flow time Average number of jobs in the system = = 77/28 = 2.75 jobs Sum of total flow time Total job work time Average job lateness = = 11/5 = 2.2 days Total late days Number of jobs © 2011 Pearson Education, Inc. publishing as Prentice Hall

Job Work (Processing) Time Sequencing Example SPT: Sequence B-D-A-C-E Job Sequence Job Work (Processing) Time Flow Time Job Due Date Job Lateness B 2 6 D 3 5 15 A 11 8 C 19 18 1 E 9 28 23 65 © 2011 Pearson Education, Inc. publishing as Prentice Hall

Job Work (Processing) Time Sequencing Example SPT: Sequence B-D-A-C-E Job Sequence Job Work (Processing) Time Flow Time Job Due Date Job Lateness B 2 6 D 3 5 15 A 11 8 C 19 18 1 E 9 28 23 65 Average completion time = = 65/5 = 13 days Sum of total flow time Number of jobs Utilization metric = = 28/65 = 43.1% Total job work time Sum of total flow time Average number of jobs in the system = = 65/28 = 2.32 jobs Sum of total flow time Total job work time Average job lateness = = 9/5 = 1.8 days Total late days Number of jobs © 2011 Pearson Education, Inc. publishing as Prentice Hall

Job Work (Processing) Time Sequencing Example EDD: Sequence B-A-D-C-E Job Sequence Job Work (Processing) Time Flow Time Job Due Date Job Lateness B 2 6 A 8 D 3 11 15 C 19 18 1 E 9 28 23 5 68 © 2011 Pearson Education, Inc. publishing as Prentice Hall

Job Work (Processing) Time Sequencing Example EDD: Sequence B-A-D-C-E Job Sequence Job Work (Processing) Time Flow Time Job Due Date Job Lateness B 2 6 A 8 D 3 11 15 C 19 18 1 E 9 28 23 5 68 Average completion time = = 68/5 = 13.6 days Sum of total flow time Number of jobs Utilization metric = = 28/68 = 41.2% Total job work time Sum of total flow time Average number of jobs in the system = = 68/28 = 2.43 jobs Sum of total flow time Total job work time Average job lateness = = 6/5 = 1.2 days Total late days Number of jobs © 2011 Pearson Education, Inc. publishing as Prentice Hall

Job Work (Processing) Time Sequencing Example LPT: Sequence E-C-A-D-B Job Sequence Job Work (Processing) Time Flow Time Job Due Date Job Lateness E 9 23 C 8 17 18 A 6 15 D 3 26 11 B 2 28 22 103 48 © 2011 Pearson Education, Inc. publishing as Prentice Hall

Job Work (Processing) Time Sequencing Example LPT: Sequence E-C-A-D-B Job Sequence Job Work (Processing) Time Flow Time Job Due Date Job Lateness E 9 23 C 8 17 18 A 6 15 D 3 26 11 B 2 28 22 103 48 Average completion time = = 103/5 = 20.6 days Sum of total flow time Number of jobs Utilization metric = = 28/103 = 27.2% Total job work time Sum of total flow time Average number of jobs in the system = = 103/28 = 3.68 jobs Sum of total flow time Total job work time Average job lateness = = 48/5 = 9.6 days Total late days Number of jobs © 2011 Pearson Education, Inc. publishing as Prentice Hall

Sequencing Example Summary of Rules Rule Average Completion Time (Days) Utilization Metric (%) Average Number of Jobs in System Average Lateness (Days) FCFS 15.4 36.4 2.75 2.2 SPT 13.0 43.1 2.32 1.8 EDD 13.6 41.2 2.43 1.2 LPT 20.6 27.2 3.68 9.6 © 2011 Pearson Education, Inc. publishing as Prentice Hall

Comparison of Sequencing Rules No one sequencing rule excels on all criteria SPT does well on minimizing flow time and number of jobs in the system But SPT moves long jobs to the end which may result in dissatisfied customers FCFS does not do especially well (or poorly) on any criteria but is perceived as fair by customers EDD minimizes maximum lateness © 2011 Pearson Education, Inc. publishing as Prentice Hall

Work (lead) time remaining Critical Ratio (CR) An index number found by dividing the time remaining until the due date by the work time remaining on the job Jobs with low critical ratios are scheduled ahead of jobs with higher critical ratios Performs well on average job lateness criteria CR = = Due date - Today’s date Work (lead) time remaining Time remaining Workdays remaining © 2011 Pearson Education, Inc. publishing as Prentice Hall

Critical Ratio Example Currently Day 25 Job Due Date Workdays Remaining Critical Ratio Priority Order A 30 4 (30 - 25)/4 = 1.25 3 B 28 5 (28 - 25)/5 = .60 1 C 27 2 (27 - 25)/2 = 1.00 With CR < 1, Job B is late. Job C is just on schedule and Job A has some slack time. © 2011 Pearson Education, Inc. publishing as Prentice Hall

Critical Ratio Technique Helps determine the status of specific jobs Establishes relative priorities among jobs on a common basis Relates both stock and make-to-order jobs on a common basis Adjusts priorities automatically for changes in both demand and job progress Dynamically tracks job progress © 2011 Pearson Education, Inc. publishing as Prentice Hall

Sequencing N Jobs on Two Machines: Johnson’s Rule Works with two or more jobs that pass through the same two machines or work centers Minimizes total production time and idle time © 2011 Pearson Education, Inc. publishing as Prentice Hall

Johnson’s Rule List all jobs and times for each work center Choose the job with the shortest activity time. If that time is in the first work center, schedule the job first. If it is in the second work center, schedule the job last. Once a job is scheduled, it is eliminated from the list Repeat steps 2 and 3 working toward the center of the sequence © 2011 Pearson Education, Inc. publishing as Prentice Hall

Johnson’s Rule Example Job Work Center 1 (drill press) Work Center 2 (lathe) A 5 2 B 3 6 C 8 4 D 10 7 E 12 © 2011 Pearson Education, Inc. publishing as Prentice Hall

Johnson’s Rule Example Job Work Center 1 (drill press) Work Center 2 (lathe) A 5 2 B 3 6 C 8 4 D 10 7 E 12 B E D C A © 2011 Pearson Education, Inc. publishing as Prentice Hall

Johnson’s Rule Example Job Work Center 1 (drill press) Work Center 2 (lathe) A 5 2 B 3 6 C 8 4 D 10 7 E 12 B A C D E Time 0 3 10 20 28 33 WC 1 WC 2 B E D C A © 2011 Pearson Education, Inc. publishing as Prentice Hall

Johnson’s Rule Example Job Work Center 1 (drill press) Work Center 2 (lathe) A 5 2 B 3 6 C 8 4 D 10 7 E 12 B A C D E Time 0 3 10 20 28 33 WC 1 WC 2 B E D C A B E D C A Time 0 1 3 5 7 9 10 11 12 13 17 19 21 22 23 25 27 29 31 33 35 B E D C A © 2011 Pearson Education, Inc. publishing as Prentice Hall