Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
MD#2 News & Plan Tue – Wed (19. – 20.6.) DayTimeMDEiCMP Tue06: GeV  4 TeV: Ramp for chromaticity - missed A 08:00Ramp down 10: GeV: Large.
Lot’s of time lost due to cryo problem in IR8. Major impact, therefore review of MD program… Start discussion here, please let us know your input. Will.
Friday March 4 th LHC morning report the short story: from a global point of view we had basically only one access !!!
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
LHC progress Report LHCC Wednesday 23 rd March 2011.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Monday :00 Injection for physics fill # :00 Stable beams fill #1816, luminosity ~1.2x1033 cm-2s-1 11:08 Beams dumped. QPS trigger on detector.
– Machine closed. Ramp for powering tests & pre-cycle – Pilots through nominal cycle up to collisions. Measure chroma during squeeze. Check dump of pilots.
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Wednesday
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
MD Planning Fri – Sat (26. – 27.8.)
Wednesday 8.9 External crossing angles:
1st LHC MD Period Started
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Machine Coordinators: G. Arduini, J. Wenninger
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Wednesday 21 March 2012.
Friday 18/03 07:15 Test ramp with pilot after the test of dynamic FIDEL correction. Ramp was OK, but fill was stopped due to the trip of several RQTFs.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Summary Friday h38: Ramp down and pre-cycle.
MD Report 24 June 2012 Machine coordinators: Barbara Holzer, Mike Lamont MD Coordinators: Ralph Assmann, Giulia Papotti, Frank Zimmermann MD#2 News & Plan.
Monday 11/07: Recovery Plenty of accesses.
Tue :25 Beams dumped due to RF vacuum interlock
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
Thursday morning – optics correction
LHC MD block#3 Ralph Assmann, Giulia Papotti, Frank Zimmermann
LHC Morning Meeting - G. Arduini
Summary of Week 16 G. Arduini, J. Wenninger
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Wed :40 Lost S78 - QPS controller.
Friday March 4th 08h32: Access for beam dump system.
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
MD#2 News & Plan Tue – Wed (19. – 20.6.)
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Planning at 5 o’clock meeting Friday
Friday morning 10:30 Optics measurements and corrections.
LHC Morning Meeting - G. Arduini
Yesterday morning Held 1647 for a while – SPS kicker problem
Friday 16/3 08:30 – 10:15 Access for QPS and EPC (BI in point 4)
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Saturday 7th May Sat – Sun night
Summary Thursday h21: Stable beams fill #1303.
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Aims for the week Recover from technical stop and precycle at 10A/s
Thu 6/4 End of fill #2470. ~1 pb-1 in 4 hours. Dumped by CMS BCM.
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Thursday – Morning Energy matching at injection with H CODs
MD Planning Fri – Sat (1. – 2.7.)
Wednesday h10: Programmed dump. 07h54: Injection. 200b.
Summary for LPC (March 7th, Ralph Assmann)
Saturday :42 stable beams fill 3541
LHC Morning Meeting - G. Arduini
Wednesday 23/2 Thanks CRYO!!!.
Mon 2/4 08:00-13:00: Access for: Experiments Power converters BBQ
Another Immortal Fill….
Tuesday 24/5 Fill # :00 Stable beam fill # bunches
Monday 10th December - morning
Thursday Morning/Afternoon
Wednesday 26 October 2011.
Saturday 26 November 2011.
HI2011 Commissioning Status
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours

Mon 22/8 – Tue 23/8 Test of the coupling functions for the squeeze to 1 m. Trip of Sector 78 (QD) at the start of the ramp-down (nQPS BS board B12R7_3 – RQD – Board A) - Z. Charifoulline. Noisy already during the last two ramps, so it has to be replaced during coming technical stop. For the time being we can try to survive with threshold 600mV.

Mon 22/8 – Tue 23/8 During Sector 78 recover after trip: Loading of new damper firmware for controlled emittance blow-up (required to speed up loss maps in the future), RF measurements without beams ATLAS access 21:00 Ready for injection but problem with injection kicker (generator not charging the PFNs Beam 2) and later with LBDS (tracking fault on Beam 1) 22:45 – 02:30 Issues with the transverse damper settings

Mon 22/8 – Tue 23/8 Summary on the ADT problem (D. Valuch) missing 25ns in the total one turn delay. This explains the instability followed by a dump. It has an origin in the new firmware deployed yesterday (version 322110720). All previous firmware versions were compiled by Synplify, while the new one by Synplify Premier. Problem could be solved in 3 out of 4 crates As it is not possible to have different version of drivers/fesa class on the different ADT front ends we had to revert back to the previous firmware, previous driver and previous DSPU FESA and previous AbortGapCleaning class on all units (kindly done by M. Jaussi in a middle of the night) The problem is probably related to a specific clock phase or conditions in the crate Vertical Beam 1 On top of that, driver amplifier #7A (Vertical plane, beam 1) trips on a DC power, RF and Power module fault. Access at point 4 and quickly checked the amplifier in UX45. There is no apparent problem. Switch unit OFF till the ADT power piquet will have a look.

Mon 22/8 – Tue 23/8 Additional problems: 2 trips of the RF Module 1 of Beam 1 (occurred already last week) Trip of LBDS Beam 2: There is probably a GTO broken on generator B MKBV, beam 2. Masked for tonight, but an intervention is probably necessary as soon as possible. FGC problem on RCBV33.L2B2. Access required as too large kick on that corrector Recovered the machine at 05:30  Go for Plan B as agreed with Massi

Plans RF studies in preparation of MD until 08:30 08:30 start 90 m optics, roman pot and collimator alignment, data taking for ALFA and TOTEM If 90m optics fill is dumped prematurely: before ~00:00 Wed: refill and continue 90m after ~00:00 Wed: stop there, give machine to MD 04:00 tomorrow: start of the MD Pending issues to be clarified this morning with experts: MKB beam 2 and RF Beam 1

Draft MD Planning Wed – Thu (24. – 25.8.) Day Time MD MP Wed 04:00 Ramp down, cycle 06:00 450 GeV  3.5 TeV: Head-on beam-beam + 1h data taking (stable beams) – for highest pile-up B 13:00 15:00 450 GeV  3.5 TeV: Optics setup for b*=1m (1) – Pilots through squeeze, measure and correct Q, Q’, C, orbit, measure beating and local coupling A 19:00 21:00 450 GeV  3.5 TeV: Long bunch length – RF setup at injection, test ramp for losses in IR3, voltage change at flat top Thu 03:00 05:00 450 GeV  3.5 TeV: Beam Instrumentation Ramp down, cycle. 450 GeV  3.5 TeV: LR beam-beam – 2 batches, effect of number of LR interactions, effect of emittance C 16/08/2011 MD Planning 2011/12, MD#3

Draft MD Planning Fri – Sat (26. – 27.8.) Day Time MD MP 23:00 Ramp down, cycle. Fri 01:00 450 GeV: Transverse damper – beam blowup at injection B/C 07:00 450 GeV  3.5 TeV: Aperture – scraping pilot beam tails in triplets, maybe test global aperture measurement with transverse damper B 15:00 17:00 450 GeV: 25 ns studies – injection of up to 144b/288b, damper Sat 00:00 450 GeV: 25 ns studies – vacuum, ecloud, RF 450 GeV  3.5 TeV: Optics setup for b*=1m (2)– apply proposed beating and local coupling corrections; at 1m: measure beating and coupling, verify corrections, test collision beam process A 450 GeV  3.5 TeV: Collimator setup for b*=1m– tight collimation settings, set up TCT’s in IR, loss maps. Asynchronous dump, if time left. 16/08/2011 MD Planning 2011/12, MD#3

Draft MD Planning Sun – Mon (28. – 29.8.) Day Time MD MP Sun 01:00 Ramp down, cycle. B 03:00 450 GeV  3.5 TeV: p-p rephasing – debunching during ring rephasing with nominal emittances 09:00 11:00 450 GeV: UFO studies – generation mechanism at MKI’s, statistics, MKQA tests (p-Pb interlock test in the shadow) C 19:00 450 GeV: Quench margin at injection – observation with special QPS instrumentation, losses from TCLIB collimator 22:00 450 GeV  3.5 TeV: Quench test at 3.5 TeV – test losses in other dispersion-suppressors – dropped if extra time needed for b*=1m Mon 06:00 Technical Stop Needs from experiments: -Luminometers on during beam-beam MDs and in the second slot of b*=1 m 16/08/2011 MD Planning 2011/12, MD#3