Always ensure a stable position when working at height!

Slides:



Advertisements
Similar presentations
Always start a vehicle correctly
Advertisements

Always use the correct lifting equipment
PDO Second Alert What happened? Your learning from this incident..
Always use mechanical handling aids when carrying out a heavy lift
Ensure a safety briefing is given where appropriate
Always ensure travelling block is stationary during DM changeover
No Removal of cellar frames by hands
Always stay alert while driving, and observe other drivers behaviour
Always use 3 points of contact when using ladders
Always ensure the right tools are used for the task
PDO Second Alert Date: Incident : LTI What happened?
Comply with Safe Operating Procedures
PDO Second Alert What happened? Ensure you are out of the danger zone
Don’t pull a twisted sling
Ensure all safety covers and guards are secured and in place
Maintain 3 point contact when you climb Ladder
PDO Second Alert Stay out of the line of fire What happened:
Drive with appropriate speed to road conditions
Identify Pinch Points and keep your Hands & Fingers away
Use right tools for the job and use them correctly
Do not work at height without fall protection
PDO Second Alert Date: Incident type: LTI What happened?
Ensure loads are secured as per SP 2001 Factsheets
Always wear fall protection equipment when working at height
Ensure to use the right tools and equipment for the activity
Avoid taking shortcuts
Ensure a working platform is adjusted and used
Follow Management of Change for an activity which is not in permit
PDO Second Alert What happened?
Keep away form ‘line of fire’
Keep away from “Line of Fire”
Always follow “Defensive Driving Technique” all the time.
Always use the right equipment for the task !!!!
Ensure 3 point contact maintained whilst using ladder
Ensure OHL Clearance required for your lifting activity
No hands on elevator while delivering pipe
Never put your Hands in line of fire
Ensure cat line are under tension before removing elevator bolts
PDO Second Alert Date: Incident title: LTI What happened?
Beware of Fall hazards while working at edge of trailer
Photo explaining what was done wrong
Pay attention to your footing
Unsecured pup joint falling
Crane operating with boom lowered and under Supervision
Always report Near Misses
Do not stand in the LINE OF FIRE
Never place yourself in “line of fire”
Always use your hands to set the slips
Ensure that all Rig moves are carried out by competent personnel
Always stay away from line of fire
PDO Second Alert What happened? Your learning from this incident..
PDO Second Alert Date: Incident title: HiPo What happened?
Your health is your responsibility
Always ensure “no go” zone are in place
PDO Second Alert Date: Incident title: MVI Rollover
Check equipment prior to start the job
Do not move into the Line of Fire
Seek assistance of Banksman while reversing the vehicle
Use only certified lifting equipment in good condition
Always keep your hands and fingers away from the Line of Fire
Always keep your equipment maintained
PDO Second Alert What happened? Your learning from this incident..
Check Level Setup prior Lifting & Lowering Operation
SHORTCUT ROAD DRIVING IS DANGEROUS
Keep away from “Line of Fire”
Keep away from the line of fire
Confidential - Not to be shared outside of PDO/PDO contractors
Beware of raised edges of walk ways.
Keep hands out of the line of fire
Use hands-off where possible
Presentation transcript:

Always ensure a stable position when working at height! PDO Second Alert Date: 24.02.16 LTI Saih Rawl What happened? A heavy vehicle contractor driver was unlatching chains and boomers from a batch mixer on top of a flatbed trailer (1.55 m high). The driver stepped to the side of the batch mixer pulling the chain in preparation to step down from the trailer. During this process he lost balance and fell on the ground injuring his left ankle and developing a calcaneus bone fracture. Your learning from this incident.. Always ensure you are in a stable position while applying force (pulling a chain, tightening a bolt, etc) as energy can be released suddenly. Ensure you attend the TBT / safety brief before starting work. Supervisors to ensure that ONLY assigned & briefed personnel are involved in the task. Do not participate in operations if you were not part of the TBT. Always secure any loose items on equipment before transportation. Always ensure a stable position when working at height!

Management self audit Date: 24.02.16 LTI Saih Rawl As a learning from this incident and to ensure continual improvement all contract managers must review their HSE HEMP against the questions asked below Confirm the following: 1 Do you assess your contractors skills/understanding after conducting safety training? 2 Does your pre-departure checklist specifically mentions loose items / safety pins in place? 3 Does your HEMP have visual aids/photographs to be adequately/easily communicated to field population? 4 Does your supervisor training package include intervention in unsafe situations/acts? Make a list of closed questions (only ‘yes’ or ‘no’ as an answer) to ask other contractors if they have the same issues based on the management or HSE-MS failings or shortfalls identified in the investigation. Pretend you have to audit other companies to see if they could have the same issues.