Automated Interoperability Testing

Slides:



Advertisements
Similar presentations
World Class Standards IMS Interoperability Testing - from Standards to Practice Giulio Maggiore ETSI TC INT Chairman © ETSI All rights reserved.
Advertisements

World Class Standards Review of TC MTS (Methods for Testing and Specification) Dieter Hogrefe © ETSI All rights reserved Board#75, 3-4 November 2009.
Halifax, 31 Oct – 3 Nov 2011Global Standards Collaboration ETSI ETSI Jørgen Friis, VP ETSI SES (Standards Enabling Services) Document No: GSC-16-PLEN-XX.
World Class Standards Recommended Improvements to The ETSI Standards Engineering Process Hans van der Veer Chair OCG-IOP & Steve Randall STF308 OCG#32,
PERFORMER WP2 INTRODUCTION 13th of September 2013 CSTB Sophia Antipolis, France.
STF421 ITS G5 TESTING – AN OVERVIEW – CEN DSRC – ITS G5 Coexistence Workshop - Presented by Friedbert Berens, in Ispra, Italy STF421 – An Overview -
World Class Standards On ETSI’s TTCN-3 Web Site Stephan Schulz, Ph.D. ETSI CTI © ETSI All rights reserved T3UC, Stockholm, Sweden, May 31 st 2007.
TBXXX / STFXXX CLOSE DEBRIEFING REPORT Subject Presented by TB Chairman © ETSI All rights reserved Version: 7 December 2012.
The Preparatory Phase Proposal a first draft to be discussed.
30-31 March 2005 Workshop "IMS over Fixed Access" - Washington 1 TISPAN_NGN Project plan Martin Niekus Alain Sultan
World Class Standards CCIF New York - April Grids, Clouds and Service Infrastructures ETSI Strategy & New Initiatives.
NET-SHARE Kick-off meeting Matosinhos, Portugal April 15 h 2008 ICT Policy Support Programme (ICT PSP) WPs and ACTION POINTS.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
INFSO-RI NA2 Status Update ETICS2 third AHM Isabel Matranga Engineering Ingegneria Informatica SpA Budapest, June 2009.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ETSI Conformance and Interoperability Testing Jørgen Friis VP ETSI SES (Standards Enabling Services)
ITU Workshop on “Voice and Video over LTE” Geneva, Switzerland, 1 December 2015 ACTIVITIES OF THE ITU-T SG11 TOWARDS IMS AND VoLTE/ViLTE INTEROPERABILITY.
NDIA PMCS May Rosslyn, VA Earned Value Management System Acceptance Working Group Buddy Everage Working Group Lead.
2050AP Project WP5: “Conclusions” UPM Madrid 11 de Octubre 2013.
ITU Liaison on T-MPLS Stewart Bryant
ERM/MTS STF proposal on formal Phy measurement framework Friedbert Berens Vice Chair ERM TGUWB Presentation to ERM, July 2010.
Go4IT project MTS meeting October June 2006© Go4IT Proposed agenda Go4IT project presentation Report of IPv6 ready logo committee.
World Class Standards 44TD21 The ETSI Standards Engineering Process STF308 DTR/MTS Steve Randall STF308 © ETSI All rights reserved MTS#44 March.
Jeju, 13 – 16 May 2013Standards for Shared ICT ETSI Conformance and Interoperability Testing Jørgen Friis ETSI Chief Services Officer (CSO) Document No:
Power of Choice (PoC) Program Overview
Kick Off Meeting Largs, Scotland
ETSI Test Specifications for IP-Based Protocols TTCN-3 User Conference May , Sophia Antipolis Anthony Wiles.
6 March 2015 Webex IPv6 over the TSCH mode of IEEE e Chairs:
Status Reports (STF 213, MTS-IPT, STF 236) and Info (STF 219, STF 224)
CONFORMIQ DESIGNER 2012 MTS #55 Meeting.
Automated Interoperability Testing
WPM ad-hoc group report TP#25
WG5 – MAS#27 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
ETSI NFV POCS and PLUGTESTS
Automated Interoperability Testing
ETSI related TTCN-3 activities and issues
ETSI Standardization Activities on M2M communications
SCOPE of the Technical Committee
ETSI Conformance and Interoperability Testing
TDL: The ETSI Test Description Language
TC MTS / STF 430 Close Debriefing Report
STF 442 Specialist Task Force initiated by ETSI MTS Manpower Duration
CTI Update on LIBSIP and TTCN-3.org
TDL: The ETSI Test Description Language
STF446 Final Report Summary
STF430 Final Report Summary
How to make better standards
TTCN-3 CONFORMANCE TEST SUITE STF 451 STATUS REPORT
Milan Zoric Centre for Testing and Interoperability ETSI
Anthony Wiles ETSI PTCC On behalf of Hans Van der Veer
UPDATE on SVN & MANTIS Upgrade
ETSI TTCN-3 Test Suites QUALITY IMPROVEMENT
CONFORMIQ DESIGNER Proposal for 2012 MBT Standardization Activities Stephan Schulz (MTS Chair)
8th meeting of the Expert Group on Reporting (2 December 2010)
T3UC & MBT ws 2012 Presented by Stephan Schulz, TC MTS Chairman for MTS#57 © ETSI All rights reserved.
The study... Study on Stakeholders´ Involvement in the Implementation of the OMC in Social Protection and Social Inclusion.
TDL: The ETSI Test Description Language
STF393 Status TTCN-3 Language Maintenance
The ETSI Standardisation Process
40TD11 STF276 – Status (including TPLan and T3Doc)
UCAAT 2017 is hosted and organised by Fraunhofer FOKUS.
Discussion on TDL future
Name of Speaker, Title and Organization
e-Infrastructure commons Updates
STF 491: TTCN-3 Evolution 2015 Final Report summary
Specialist Task Forces (STFs)
NWM New Working Methods
STF393 Final Report Summary TTCN-3 Language Maintenance
“Methodology for RESTful APIs specifications and testing”
Introduction of TC MTS - Methods for Testing and Specification
“Methodology for RESTful APIs specifications and testing”
Presentation transcript:

Automated Interoperability Testing ETSI STF 370 Status Stephan Schulz STF Leader © ETSI 2010. All rights reserved MTS#50, Sophia Antipolis

STF 370 Overview Automated Interoperability Testing (for distributed systems) EC funded STF composed of 3 work packages WP1: Methodology and Framework WP2: IMS case study based on use of TTCN-3 WP3: Dissemination Deliverables EG on Auto IOT Methodology TR on Specific Architectures (i.e., IMS core network IOT case study) TR on (IMS) Plugtest experience Training material (MISC WI) EC reports STF will end Jun 2010 Currently still 4 experts active 2 more STF sessions planned

WP1 & WP2 Status First two work packages have been essentially completed 2009 Deliverables (1 EG & 2 TRs) have been approved and published IMS IOT test system has been implemented in cooperation with TC INT and successfully validated at IMS PLU3 Feedback on test descriptions provided to TC INT Used at event in offline mode, i.e., for IOT trace analysis 309 interoperability tests have been analysed with this tool during event Following a MTS rapporteur’s meeting in Nov the STF has produced a CR for MTS #50 on EG 202 237 (Generic approach to IOT) in order to position it better in respect to EG 202 810 (Framework & Methodology for Auto IOT) Product certification vs. standard validation Open source distribution of codec and adapter code still has to be investigated Likely to be in same place as ETSI t3q and t3d tools

WP3 Status Work started in Nov 2009 Objective is to generate training material and a white paper on automated interoperability testing Training material is well advanced Part 1: General Presentation of Auto IOT Methodology (25 slides) Part 2: Walk-through of Interoperability Test System Development Process in context of TTCN-3 and IMS core network IOT (80 slides) Part 3 (planned): Auto IOT Exercises Current drafts uploaded as MTS#50 contribution 11 Proposal for Auto IOT Tutorial submitted to T3UC 2010 Likely to be a stripped down version of part 2 Work on white paper has started but still in early drafting stage Will be focus of remaining sessions

Road ahead Finalize training Complete white paper Prepare and present tutorial in Beijing (if it is accepted) Final EC report

Thank you Questions? Comments? stephan.schulz@conformiq.com