Corridor Sketch Plan Methodology – Update ITS Sketch Plans Corridor Sketch Plan Methodology – Update presented to Wisconsin Department of Transportation presented by Cambridge Systematics, Inc. and SRF, SEH, EK 10/22/07
Agenda Welcome and Introductions Schedule Corridor Updates Next Steps Final report – Title Change Next Steps
Corridor Update
Corridor Updates Regional visit update Statewide smoothed dataset Completed Positive Feedback Integrating Comments Statewide smoothed dataset Draft technology recommendation All corridors (signpost maps) Outstanding Issues Display issues Corridor connector issue
2030 Corridors Update 2030 Corridors Have Been Updated Not Finalized – Pending Public Review Process Two New Backbone Routes Eight New Connector Routes Two New Backbone Routes USH 45 USH 14 Eight New Connector Routes USH 63 Wis 16 Wis 33 USH 151 Wis 57 Wis 310 Wis 47 DRAFT
Final Report
Final Report Outline Appendices SRF E&K SHE
Next Steps Integrate Region comments Finalize map displays Finalize report outline Prioritize Corridors