July 13, 2009 San Francisco, CA Session #62 802.16m Opening Report July 13, 2009 San Francisco, CA Session #62 2009-07-13 IEEE 802.16m-09/0032
802.16m Opening Report – San Francisco Into Session #62 CRs on SDD 70 comments; 24 late comments; 22 editorial, 72 technical (@ 3 minutes ea = 3.6 hrs) Approx 112 PHY; 22 MAC Call for Comments on Amendment Text 825 comments; 558 Technical; 267 editorial (@ 3minutes ea. = 28 hrs.) Breakdown 291PHY; 267 MAC Call for Contributions on Femto Amendment text 60 new contributions (5 min. ea= 5 hrs) Drafting Groups text output Included in amendment comments & contributions 2008-07-13 IEEE 802.16m-09/0032
802.16m Opening Report- San Francisco Plan for the week: Resolve all SDD CRs – baseline the entire SDD Resolve all Amendment Working Document (AWD) comments End all Drafting Group activities Initiate Simulation and Evaluation Activities Review & update Workplan 2008-07-13 IEEE 802.16m-09/0032
802.16m Opening Report- San Francisco Plan for the week (cont): Logistics: Conduct three parallel sessions Draft meeting calendar/TGm breakout schedule in external temp directory: http://dot16.org/ul//upload/temp_db/DRAFTTGmmtgschedule.xls 2009-07-13 IEEE 802.16m-09/0032