Micromegas for CLAS12 – Preliminary work on integration

Slides:



Advertisements
Similar presentations
Panda Solenoid Timelines. General Layout constraints and HOLD POINTS.
Advertisements

CALICE Dave Bailey. Aims and Objectives Develop the technology to build a high- resolution tracking calorimeter for ILC experiments Main thrusts: –Testbeam.
RD S. Aune CEA/IRFU Micromegas Bulk for CLAS12 vertex tracker.
Micromegas for CLAS12 Central Detector - Update Franck Sabatié November 19th 2009 Micromegas option for the Central Detector Why, Where, How ? R&D milestones.
MICE Collaboration meeting May 31 st – June 3 rd 2009 RAL Tim Hayler, Andy Lintern DRAFT SEQUENCE OF EVENTS STEPS
Beam Position Monitors MICE CM Harbin January, 2009.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
Luminosity Monitor Commissioning MICE Collaboration Meeting March 2010 Paul Soler, David Forrest Danielle MacLennan.
INFN-LNF / D. Orecchini – S. Tomassini – 06/24-25/2015 CLAS12 – RICH MECHANICS REVIEW SLIDE 1 RICH MODULE INTEGRATION IN CLAS_12 – LAST LAYOUT RICH MODULE.
RICH WG M.Lenti. Outlook Mirror Support Vidyo meeting on June 12, 20, 27 and on July 4 and 11 RICH WG meeting on august 27  Vessel status (see Ferdi’s.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Large Area Endplate Prototype for the LC TPC 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes, S.
Detector studies, Radiation Simulations, Organization FCC Hadron Detector Meeting July 27 th 2015 W. Riegler.
1 CLAS12/Central Tracker review. Saclay 12/09 Stéphan AUNE Central Tracker review Micromegas central & forward tracker  R&D and prototypes  CAD implantation.
INTEGRATION OF THE CBM SILICON TRACKING SYSTEM U. Frankenfeld for the CBM collaboration supported by BMBF, EU-FP7 HadronPhysics3 and CRISP.
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
Hall D Design Status GlueX Collaboration Meeting JLab, December 11-13, 2003 Ravi Anumagalla.
1 Vertex-detector power pulsing CLIC Detector and Physics Collaboration Meeting, 02/10/2013 Cristian Alejandro Fuentes Rojas, PH-ESE-FE,
Doug, here are some slides. FGT Electrical Integration ethernet trig/clk DDL fiber Wiener MPOD controller ISEG 8 ch HV -4 2 mA ARC module (APV Readout.
Test beam setup: status report 31/03/2009 M. Alfonsi (CERN)
Septembre SLAC BeamCal W. Lohmann, DESY BeamCal: ensures hermeticity of the detector to smallest polar angles -important for searches Serves as.
TPC Integration P. Colas (thanks to D. Attié, M. Carty, M. Riallot, LC-TPC…) TPC layout(s) Services Power dissipation Endplate thickness and cost Mechanical.
Takeshi Matsuda LC TPC Collaboration March 5, 2008 TPC Endcap Materials.
Towards a 7-module Micromegas Large TPC prototype 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes,
S. AUNE 15/09/08 Micromegas Bulk for CLAS12 tracker.
Proposal for LST-based IFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002.
Micromegas Bulk Demonstrator One type of Bulk: Active area; 115 mm for 288 strips, 500 mm long Material: 100 µm PCB, 5 µm Cu, 18µm mesh, 20µm Mylar Two.
October 18, Muon Meeting B. Schmidt Outline: Installation schedule under Discussion Status of Integration activities Possible modifications to the.
Hall D infrastructure and integration Elton Smith Hall D Collaboration Meeting September 9-11, 2004.
Review of Micromegas Tracking Detectors for CLAS12 – May 7, 2009 Reviewers: Madhu Dixit, Mac Mestayer Presentations covered the following topics: –detector.
C.BAULT November 9 th  LAYOUT STRAWMAN 07V13 Vs STRAWMAN 07V14  SERVICES AND STRUCTURES INVENTORY  ENVELOPE SERVICES  BARREL SERVICES ROUTING.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Emulsion Test Beam first results Annarita Buonaura, Valeri Tioukov On behalf of Napoli emulsion group This activity was supported by AIDA2020.
TPC FEE status and more TUM Physics Department E18 I.Konorov.
Integration Prototype1 BaBar Integration as a Prototype for SuperB Bill Wisniewski SuperB Workshop at LNF 6 April 2011.
Baby MIND Scintillator modules 11 November 2015 Revision E. Noah.
Central Tracker Cabling and Mechanics Paola Gianotti26/4/111.
14-oct-2014 GEM detector configuration 1 12 stations: Z = 30 – 45 – 60 – 80 – 100 – 130 – 160 – 190 – 230 – 270 – 315 – 360 Stereo angles: 0 – 7.5 deg.
CALICE, Shinshu, March Update on Micromegas TB analysis Linear Collider group, LAPP, Annecy CALICE collaboration meeting 5-7 March 2012, Shinshu,
Concept for LOKI detector system. Rear Detector 2 Spider Cob (central detector) Octant (Out detector) Maybe subdivided in two parts.
What’s new at LAL-LLR ( MDI issues) M.Jore, C.Clerc Visit at CMS Forward detectors meeting at LLR Vacuum in Beam pipe, first LAL results.
GEM Integrated PCB readout and cooling
CLAS12 Forward Tracking: Status and Challenges
STRAW TRACKER SYSTEM CAD STATUS :
Micromegas Vertex Tracker Status Report
Technical Design for the Mu3e Detector
Update of MVD services and requests
Commissioning and Calibration Strategies for Micromegas Vertex Tracker
Felix Sefkow DESY LDC at Vienna November 17, 2005
- CT INSTALLATION PROCEDURE OVERVIEW -
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Large Area Endplate Prototype for the LC TPC
BoNuS: Radial-Drift TPC using Curved GEMs
Mechanics for front-end Electronics Of T2K-II TPCs – A Few Conceptual Ideas D. Calvet, Irfu, CEA Saclay, Gif sur Yvette Cedex, FRANCE.
WBS: : Tracking for CLAS12
LumiCal mechanical design, integration with LDC and laser alignment
Vertex Detector Mechanical R&D Design Questions and Issues
CLAS12 - CT meeting 10 October 2013
Chamber Design and Integration RE3/1 and RE4/1
Final Focus Synchrotron Radiation
(A) (B) - CENTRAL SUPPORT FRAME - INFN-LNF - SPAS 1
First of all we will remind some numbers:
HARPO, a Micromegas+GEM TPC for gamma polarimetry above 1 MeV
Integration and IR Hall
LST Module Installation
Preparation of the CLAS12 First Experiment Status and Time-Line
DET. Integration Inner detector envelope Radial clearances.
OT Survey & Adjustment Outline: Survey technique at present
AIDA 2020 Tel Aviv group.
BCM Overview Placement such that system is sensitive to all types of beam accidents. => 2 independent subsystems Halo losses inside the Pixel volume ie.
Presentation transcript:

Micromegas for CLAS12 – Preliminary work on integration Central tracker Micromegas scheme Forward Vertex Tracker F. Sabatié CLAS Collaboration Meeting Feb. 19-24th 2008

Central Tracker scheme Electronics integration was done using existing aspect ratios (T2K-AFTER). Expect 30% redution in size and power consumption 3 layers of MM (each X,Y) 2 layers of Si FVT is included (basic MM solution, 3x2 planes) 2 schemes were examined: Half of the electronics is downstream (shorter paths to electronics, safe) All the electronics is upstream (obvious advantages but long path to electronics => needs testing) Only basic integration work was done. Need to add the possibility to remove Si without touching MM. Need to add cryo-target integration. Half-upstream All upstream

Central Tracker scheme cooling system for forward detector PCB extension cables for FVT Cables, gas, cooling, etc SVT For now, cylinder divided into 3, all the dead zones are aligned. For the FVT, they are also divided into 3 but each is shifted by 60°. MM FE electronics

Integration of the « all upstream » solution inside the magnet FVT can be integrated at the end of the cylinders in the case of MM design (PCB extension cable can make a 90° angle wrt the MM boards).

« All upstream » integration solution: some remarks So far no optimization of dead zones on the detector or the structure was studied (we know how to build all that, needs no R&D). Structures are in Aluminum, final detector will use lighter material. Electronics is based on T2K-AFTER, but size/comssumption is pessimistic because not optimized. For the final detector, expect a >30% gain in volume and dissipation + more appropriate connectors. HV distribution can also be highly optimized Basic concept to keep: Light cylindrical structure with MM laying on them and forward planes (which can be installed right at the end of MM cyl.), everything laying on a sliding structure for integration by the rear (target then Si and MM). Front End electronics needs to stay close to MM so cylinder has to be longer than the MM themselves. They will also integrate all necessary gas/cables/cooling entries/exits. Glycol distribution system for electronics cooling is mandatory. Holding of the central tracker is further behind because of TOF. Integration of Si and MM on the same holding structure has to be seriously studied in 2009-2010 if mixed solution is chosen (needs more work before).