Scrubbing progress - 09/12/2012

Slides:



Advertisements
Similar presentations
PROFIBUS controller problem (SEU) on cryo valve on DFBMH (600 A circuit RQ6.L7B1/2). Loss of cryo maintain ==> Beam dump. End of fill #1975 after ~2.5.
Advertisements

LHC 30 th and 31 st July :10 Finish scrubbing fill 25 ns trains by operator dump. –No XPOC data … 08:40 Inject for another scrubbing fill 09:09.
LHC Scrubbing Runs Overview H. Bartosik, G. Iadarola, K. Li, L. Mether, A. Romano, G. Rumolo, M. Schenk, G. Arduini ABP information meeting 03/09/2015.
Monday 29 October 08:48 V/dM scan CMS end of fill #3236. Check of “fast scan”. 10:06 V/dM scan finished, start of RF studies, reducing RF voltage. 11:10.
LHC Status Sat Morning 18-June Bernhard Holzer, Gianluigi Arduini et al Tentative Planning: Luminosity 1092 x 1092 Access: installing low pass filter at.
LHC 1 st August :34 Dump on TDI.B2 jaw position while filling –Checks and change TDI.B2 reference position by 0.1 mm outwards 09:40 Lost cryo in.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
LHC Progress Thursday 29 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Heat load analysis for Inner Triplet and Stand Alone Modules H. Bartosik, J. Hulsmann, G. Iadarola and G. Rumolo LBOC meeting 28 October 2014 Based on.
LHC Scrubbing Run 1 Day 3 (27/06/2015) Scrubbing team 28/06/2015.
Another typical LHC day. 06:15 Fill 2000 dumped 08:44 Stable beams – fill 2001  1.675e14  1.21e11  ~2 microns normalized emittance 11:34 Beams dump.
Joint LIU / HLLHC day -15 October 2015
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
LHC Status Tue Morning 22-Aug
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Summary of week 40 Machine Coordinators: G. Arduini, M. Lamont
Machine Coordinators: G. Arduini, J. Wenninger
Thursday 25/11/10 & Night Work on: 16:15 Inject fill #1520
Summary of Week 49 Machine coordination: Jorg Wenninger & Jan Uythoven
LHC Status Wed Morning 13-April R. Assmann, B. Holzer et al
Monday 11/07: Recovery Plenty of accesses.
MD25 ns - 14/12/2012 G. Arduini, H. Bartosik, G. Iadarola, G. Rumolo
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
LHC Morning Meeting - G. Arduini
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Tue :25 Beams dumped due to RF vacuum interlock
LHC Morning Meeting - G. Arduini
LHC Morning Meeting - G. Arduini
Summary of Week 11: 14 – 21 March
Thu 19/5 06: :00 Investigations from vacuum and cryogenics
Summary of Week 16 G. Arduini, J. Wenninger
Note: squeeze in Atlas, CMS, LHCb and Alice on going
Scrubbing progress - 10/12/2012
Friday 31st August & night
LHC Status Sun Morning 20-Mai
Friday 14th December - morning
Chromaticity can make a difference…
LHC Morning Meeting - G. Arduini
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Friday 16/3 08:30 – 10:15 Access for QPS and EPC (BI in point 4)
Wednesday 03/11 – The Plan Finish electron-cloud program:
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
Tuesday morning 09:30 Beam dump, SIS dump due to lost connections with FCG FECs. Coincides with starting a development SIS server to test new interlocks.
Tuesday Access for RF & QPS (others in the shadow) until ~18:00.
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Aims for the week Recover from technical stop and precycle at 10A/s
LHC Morning Meeting - G. Arduini
Scrubbing progress - 08/12/2012
IP8 aperture measurements (07:30-10:30)
Thursday – Morning Energy matching at injection with H CODs
Saturday Wire scans at end of fill 1253 B1H : 4.2 B1V : 4.3 B2H : 5 B2V : 7.2 Beams dumped (after ~14h of collisions) Some issues during refill.
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
LHC Status Tue Morning 22-Aug
Friday morning 08:00 Stable beams with 840b.
LHC Status Fro Morning 9-Sep
Wednesday 6th April Injection of 50 ns up to 108 bunches (3 x 36).
Saturday 24 September 2011.
Thursday Aperture studies (foreseen until ~ midday, nothing done) Problems with single bunch B2 from SPS (extraction kicker not enabled) Setting.
Coordination: Eva Barbara Holzer, Mike Lamont
Thursday - setup 10:00 Starting pre-cycle. 11:30 Injection.
Thursday 20th July - morning
Tuesday – Morning and Evening
Monday 10th December - morning
Monday 27th August & night
Wednesday 14:30 Fill 2011 dumped.
Friday 1st October : Van der Meer scans
Mon 8/8 – Tue 9/8 Stable beams #2009
Monday 5 July Morning: Continued with the Physics fill, 7b x 7b, 1e11/bunch Stable beams from 2:30 am to 13:30 : 11 hours.
Presentation transcript:

Scrubbing progress - 09/12/2012 G. Arduini, H. Bartosik, G. Iadarola, G. Rumolo, Cryogenics, Operation Vacuum teams Machine Coordinators: J. Uythoven J. Wenninger 05/12/2018 LHC Morning Meeting - G. Arduini

LHC Morning Meeting - G. Arduini 09:18 Start pre-cycle after loss of cryo conditions in matching section R8. New regulation of the 120 A DFB cryo-cooling and investigations on the issue of the sudden loss on the cryo maintain (bug suspected) 10:36-12:34 Filling. Got to 1452 bunches/beam. 12:35 RF trip (M2B2) beam dump. Spurious interlock VGP.80.5L4.R had an electrical glitch. Reading jumped from 10-10 mbar to 1000 mbar in 1 sec then switch on again. More redundancy? No loss of cryo maintain likely due to the lower intensity/heat load 05/12/2018 LHC Morning Meeting - G. Arduini

LHC Morning Meeting - G. Arduini Heat load evolution: still no significant reduction L. Tavian, G. Iadarola 05/12/2018 LHC Morning Meeting - G. Arduini

LHC Morning Meeting - G. Arduini 13:43 Start fill again 15:49 2028 Bunches/beam. Stop here for a while. 17:20 Restart filling up to 2460 bunches/beam Reduction of the heat load below 20 W/half-cell corresponding to <200 mW/m/aperture by 19:30  dumped beams at 19:50 L. Tavian, G. Iadarola 05/12/2018 LHC Morning Meeting - G. Arduini

LHC Morning Meeting - G. Arduini During injection of current fill TDI vacuum could be kept at a reasonable pressure level moving the TDI out after each injection. It was not done in the morning. This led to the dump in the morning yesterday. Monitoring of the vacuum at TDI and TCTV BLM R8 on long running sums. A. Lechner 05/12/2018 LHC Morning Meeting - G. Arduini

LHC Morning Meeting - G. Arduini Another fill over night until 3 AM: Up to 2740 bunches. Loss of cryo maintain after the dump. Temporary fix to be tested for next dump (forcing one of the temperature data 120 A Q6.R8 at the moment of dump) 05/12/2018 LHC Morning Meeting - G. Arduini

LHC Morning Meeting - G. Arduini Unexplained (likely not due to electron cloud) blow-up at the end of first train and beginning of the following ones. Some measurements taken with shorter trains with large spacing. To be investigated today. B1V B2H B2V 05/12/2018 LHC Morning Meeting - G. Arduini

LHC Morning Meeting - G. Arduini B1V B2H B2V 05/12/2018 LHC Morning Meeting - G. Arduini

LHC Morning Meeting - G. Arduini 05:45 – new fill (lost 1 hour for POPS problem). H. Bartosik, L. Tavian 05/12/2018 LHC Morning Meeting - G. Arduini

LHC Morning Meeting - G. Arduini Lifetime evolution 05/12/2018 LHC Morning Meeting - G. Arduini

LHC Morning Meeting - G. Arduini Plan Keep on scrubbing at 450 GeV Request of access: ATLAS (water leak) lost the communication with QPS DQAMC of B19L5  tomorrow morning 05/12/2018 LHC Morning Meeting - G. Arduini

LHC Morning Meeting - G. Arduini 05/12/2018 LHC Morning Meeting - G. Arduini