Antiproton decelerator

Slides:



Advertisements
Similar presentations
HIE-ISOLDE HEBT: characteristics Beamline diameter: 40 mm (REX: 100 mm) Beamline height: 1.75 m Beamline vacuum: low 1e-7- high 1e-8 mbar Connection of.
Advertisements

CERN TS Department / Civil Engineering Group 8 February 2008 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC/ILC Collaboration Meeting 8 Feb 2008.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 4-Hybrid Thermal Test System Status 27 May Sam Burke UCSB HEP Group.
MICE - Detector Safety/Integration. MICE - Detector Safety/Integration – Detectors external to Magnetic Volume  Detectors external to magnetic volume.
Electrical Installation CM39 Andy Gallagher & Ian Mullacrane.
SAFETY FOLLOW-UP HL-LHC PROJECT WP17 – Infrastructures meeting S. La Mendola, Jose Gascon DGS/SEE 09 July 2015.
Electrical & Control CM40 Daresbury Laboratory. CM40 Electrical Infrastructure Update RRM2 Latest Latest on Installation Progress Rack Allocations Racks.
Wir schaffen Wissen – heute für morgen Paul Scherrer Institut René Künzi Safety for equipment & personnel.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
ANU Shutdown Status AEM meeting Cons Gattuso 7 May 2012.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Al Pendzick LEReC Civil Construction.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Integration, Installation & Infrastructure Ans Pardons, with input from the WP4 members September 2014.
INTRODUCTION. Function of Chillers Remove Cool Control Support.
Electronic Systems Support Demonstrator Racks Rack coordination meeting 12 October 2004.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
Ion Sources – Hardware and Operation MACS Week Friday 8th October 2010 PP a-LPE, 8 th October 2010, MACS Week 2 Liviu Penescu, „Ion Sources.
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
ELENA Project GBAR Experimental area L ayout / time scales / questions F. Butin / ELENA collaboration.
Update on the Laser Beam Line
Design, integration and installation milestones Legend: 2015/Q1= 1 st quarter of 2015 (January-March) Phase 1 = proton & laser beams operation Phase 2.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
1 13 Octobre 2011 Laurent Roy ATCA Crate / Infrastructure in place -Rack in D3: dimension -Electrical power availability -Tell1 racks running in D3 (air.
Michał Matusiak Sławomir Wronka
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
1 Mice Collaboration Meeting CM27 STFC Rutherford Appleton Laboratory, UK 7 th -10 th July 2010 Daresbury Laboratory Electrical Infrastructure Report Authors.
Horst Breuker Review Oct ELENA Safety and Radio Protection ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive, Demonstrative (Risk.
Installation of the T600 at Fermilab CSN2, September 22,
MEF - Machines & Experimental Facilities March 2013 Project meeting Activities in Linac4 tunnel and building in 2013 March 2013 Project meeting 14/03/2013J.Coupard1.
CMTF Infrastructure Jerry Leibfritz PIP-II Machine Advisory Committee 9-11 March 2015.
Technical Review EHN1 Extension Cooling Systems and Pipework Jérôme Rodary / EN-CV.
DCal-ALICE integration and installation plan and status A. Tauro.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
1 CFS Utilities – What’s included in RDR for IR July CFS Utilities – IRENG WG C WATER COOLING: none. Unknown loads on IR. Only have water plants.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
S A Griffiths CM42 June 2015 Electrical & Control.
ILC Utility Design Study for Kitakami-site
I. Bergevoet - Training preparation
Neutrino Platform Proximity Cryogenics 62th EHN1 Cryogenics Integration Redouan Abdennour, Johan Bremer, Michel Chalifour, Joaquim Creus, Aurelien Diaz,
Traps for antiprotons, electrons and positrons in the 5 T and 1 T magnetic fields G. Testera & Genoa group AEGIS main magnetic field (on axis) : from Alexei.
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Computing room PC farm UPS.
Integration of the e+ elements
Schedule CM SPS G.Vandoni.
Detector Utility/Service Cavern
Yasuhiro Sugimoto 2012/2/1 ILD integration meeting
EHN1 Extension North Side wall (Removal of Existing services & platforms) Michael Jeckel & Bastien Rae.
Experimental hall design in Japanese site
Collaboration meeting 26 to 28 June 2017
CLEX* Status and Plans CTF3 complex CLEX
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
Budget specification EHN1 Extension: Infrastructure (WG2)
Sample Preparation Area
SBN Far Detector integration model overview
M. Alcaide Leon, Paolo Fessia
Detector Service Cavern for ILC
New telescope projects
Cooling technology Main components and equipments
WP02 PRR: Master Oscillator and RF Reference Distribution
Status of the cryogenic system for B180
Radiation-safe area for electronics, or laser or
Insertable B Layer Cooling System
HIE-ISOLDE Project Status Report
SC1R Cold Box PDR Controls
Undulator System Installation
Question & Suggestions March 17th
Maintenance at ALBA facility: Strategy for the conventional services
Distribution Student Task
Presentation transcript:

Antiproton decelerator Layout p transformer or rack compressors for future pbar trap C5,6 R14 Antiproton decelerator 100KV R15 R16 R9 T R13 R10 R11 R12 C1,2 C3,4 Target and coils inside bunker R17 R1 R2 R3 R4 R5 R6 R7 R8 R18 Free fall detection being defined Net socket Compressed air outlets Cryo Compressor R19 R20 Electronic Rack W W E cool water distribution chillers and electrical cabinet for linac

P. Pérez / JM Reymond / JY Roussé Water cooling 2/06/2016 P. Pérez / JM Reymond / JY Roussé

Power distribution P. Pérez 2/06/2016

P. Pérez / JM Reymond / JY Roussé Buffer Gas at Saclay Water cooling distribution For the 7 coils and 2 solenoids 2/06/2016 P. Pérez / JM Reymond / JY Roussé

P. Pérez / JM Reymond / JY Roussé Some questions Electrical CANALIS distribution: Is there electrical cabinets or boxes corresponding to each crate? Who pay for this installation? For antiproton décelerator: 100KV What are the Cern rules in matter of safety, distance….? Cable pathes: Does CERN install cable trays in the zone, along the peripheral walls? Gas: - LHelium line installed during LS2? - Possibility to have Nitrogen Bottles in the zone when working on vacuum vessel? - possibility to have small nitrogen flux in laser cover in laser hut? 2/06/2016 P. Pérez / JM Reymond / JY Roussé