Nov. 2017 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Smart Grid with LPWAN Extension] Date Submitted:

Slides:



Advertisements
Similar presentations
July 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Research Project BATS] Date Submitted: [10.
Advertisements

July 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Suitability Evaluation of Encryption Schemes]
July 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Suitability Evaluation Modulation] Date Submitted:
August 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Suitability Evaluation of Network Topologies]
June 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Proposed Scenarios for Usage Model Document.
August 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [ w w Fraunhofer IIS proposal.
May 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Discussion on Suitable Parameters for SCHC]
May 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Discussion on Suitable Parameters for SCHC]
March 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Candidate Technology Qualitative Evaluation]
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Simulation Results for Interfered Channels]
July 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Agenda for 3 August 2017 Telco] Date Submitted:
July 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Suitability Evaluation Modulation] Date Submitted:
Sept Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Qualitative Use-Case Evaluation] Date Submitted:
July 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Suitability Evaluation of Connectivity] Date.
July 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Suitability Evaluation of FEC Schemes] Date.
July 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Suitability Evaluation of Network Topologies]
July 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Suitability Evaluation of MAC Schemes] Date.
June 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Agenda for 22. June 2017 Telco] Date Submitted:
August 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Suitability Evaluation of Connectivity]
Jan Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Proposal for sub-GHz Interference Model] Date.
May 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Static Context Header Compression] Date Submitted:
September 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG w September 2018 Closing Report]
July 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Agenda for 3 August 2017 Telco] Date Submitted:
September 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Proposal for Recommendation to WG 15]
July 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Draft Agenda for 8 August 2018 Telco] Date.
March 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Candidate IEEE Standards and Technologies.
March 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Candidate IEEE Standards and Technologies.
July 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Suitability Evaluation of Encryption Schemes]
Jan Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [PAR and CSD document discussion] Date Submitted:
November 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [LPWA – Regulator Issues] Date Submitted:
March 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Information on IEEE IG LPWA to ETSI.
< Sept > Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG LPWA Draft Call for Contributions]
November 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG w November 2018 Closing Report]
Feb Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Agenda for 22. Feb Telco] Date Submitted:
May 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Discussion on Suitable Parameters for SCHC]
Nov Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Implementation Approaches for LPWAN Extension]
November 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG LPWA November 2016 Closing Report]
September 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG LPWA Closing Report September 2017.
Oct Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Input for coexistence document discussion]
October 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Draft Agenda for 17 October 2018 Telco]
July 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Suitability Evaluation of FEC Schemes] Date.
March 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG LPWA March 2017 Closing Report] Date Submitted:
June 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Agenda for 22. June 2017 Telco] Date Submitted:
Submission Title: Parameters for Sync Performance Simulation
August 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Suitability of k] Date Submitted:
January 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG w January Closing Report] Date.
Jan Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [PAR and CSD document discussion] Date Submitted:
July 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Update on ETSI LTN] Date Submitted: [9 July,
June 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Joerg Robert] Date Submitted: [22 June, 2017”
July 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Suitability Evaluation of MAC Schemes] Date.
March 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [ETSI LTN Activities] Date Submitted: [12.
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Simulation Results for Interfered Channels]
February 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Draft Agenda for 08 January 2019 Telco]
January 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG w January 2019 Closing Report]
April 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Agenda for 11. Apr Telco] Date Submitted:
< Oct > Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG LPWA Draft Call for Contributions]
January 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG LPWA January 2017 Closing Report] Date.
May 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Static Context Header Compression] Date Submitted:
July 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG LPWA Closing Report July 2017 Plenary]
Nov Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG LPWA Closing Report November 2017 Plenary]
Doc.: IEEE Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Summary.
January 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Channel bandwidth observations] Date Submitted:
Jan Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Proposal for modulation quality in split mode]
July 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG w July 2019 Closing Report] Date.
July 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG w July 2019 Closing Report] Date.
August 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Draft Agenda for 02 August 2019 CRG Telco]
July 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Comments on Rejected MBS Comments in LB 155]
August 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Draft Agenda for 19 August 2019 CRG Telco]
Jan 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TeraHertz Closing Report Date Submitted: January.
July 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Suitability Evaluation of Connectivity] Date.
Presentation transcript:

Nov. 2017 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Smart Grid with LPWAN Extension] Date Submitted: [5 November, 2017] Source: [Joerg ROBERT] Company [Friedrich-Alexander University Erlangen-Nuernberg] Address [Am Wolfsmantel 33, 91058 Erlangen, Germany] Voice:[+49 9131 8525373], FAX: [+49 9131 8525102], E-Mail:[joerg.robert@fau.de] Re: [] Abstract: [Simulation Results for Use-Case “Smart Grid with LPWAN Extension”] Purpose: [Presentation in IG LPWA] Notice: This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.15. Joerg ROBERT, FAU Erlangen-Nuernberg

Simulation Results for Use-Case “Smart Grid with LPWAN Extension” Nov. 2017 Simulation Results for Use-Case “Smart Grid with LPWAN Extension” Joerg Robert (FAU Erlangen-Nuernberg) Joerg Robert, FAU Erlangen-Nuernberg

Nov. 2017 Motivation Use-case to extend 802.15.4g with LPWAN connectivity discussed in Waikoloa Only remote users are connected via LPWAN Question on potential gain of optimized PHY in case of low bit-rates in 900 MHz band Joerg Robert, FAU Erlangen-Nuernberg

Assumed Parameters Interference class “Dense”, Outdoor channel model Nov. 2017 Assumed Parameters Interference class “Dense”, Outdoor channel model 64 payload bytes per packet MSK modulation Reed Solomon code with rate ½ for coded packets Different configurations Uncoded 50kBit/s  10ms Coded 50kBit/s  20ms Uncoded 10kBit/s  50ms Coded 10kBit/s  100ms Variable number of hops for coded case Joerg Robert, FAU Erlangen-Nuernberg

50 kBit/s Simulation Results Nov. 2017 50 kBit/s Simulation Results 20dB Joerg Robert, FAU Erlangen-Nuernberg

10 kBit/s Simulation Results Nov. 2017 10 kBit/s Simulation Results 25dB Joerg Robert, FAU Erlangen-Nuernberg

Simulation Result Summary Nov. 2017 Simulation Result Summary Reduction of bit-rate from 50kBit/s to 10kBit/s does not provide significant gain without coding Coding with hopping offers good robustness Already 8 hops offer significant level of robustness However: To obtain reliable results for the US additional spectrum measurements are required... Joerg Robert, FAU Erlangen-Nuernberg

Orlando sub-GHZ ISM Spectrum Use <month year> doc.: IEEE 802.15-<doc#> Nov. 2017 Orlando sub-GHZ ISM Spectrum Use Measured on 5 November, 2017, in hotel room Higher interference levels can be expected for outdoor meas. Joerg Robert, FAU Erlangen-Nuernberg <author>, <company>

Nov. 2017 Orlando 100ms Zoom Window length corresponds to FEC coded (1/2 rate) 64 byte packet with 10kBit/s  Significant gain due to frequency hopping can be expected Joerg Robert, FAU Erlangen-Nuernberg

Summary Reducing the bit-rate does not lead to additional robustness Nov. 2017 Summary Reducing the bit-rate does not lead to additional robustness Additional link margin can be achieved by reducing the bit-rate in addition to coding and frequency hopping Additional measurements will be performed to analyze the spectrum usage in the US Joerg Robert, FAU Erlangen-Nuernberg

Thank You for Your Interest! Nov. 2017 Thank You for Your Interest! Any Questions? Joerg Robert, FAU Erlangen-Nuernberg