8D Problem Solving TOTAL QUALITY MANAGEMENT 8D Problem Solving.

Slides:



Advertisements
Similar presentations
Accident Investigation vs. First Report of Injury.
Advertisements

Cause Analysis 1 When should root cause analysis be performed? When PROBLEMS occur !!
OSHA’s Voluntary Protection Program (VPP) Job Hazard Analysis Mishap reporting 1 This class is only intended to familiarize you with the programs in place.
ONIT Consulting LLC Who’s on your project? Q9 Initiative Presented by: Anna Gabara.
8D Corrective Action. 2 8D Problem Solving & Corrective Action: Initiate 8D Corrective Action D1 - Create Problem Solving Team D2 - Define the Problem.
Jidoka for Quality Improvement Lean en France, 20 May 2011 Yves Mérel, FCI Group Lean Director.
1 Computer Technician Computer Trouble Shooting & Repair Process Copyright © Texas Education Agency, All rights reserved.
Failure Mode & Effect Analysis Tom Hannan & Kevin Kowalis Eastern Illinois University School of Technology Total Quality Systems INT 5133 (FMEA)
Overview of Team Ford: Active Park Assist Software Engineering - CSE435 Michigan State University Fall 2014 Team members: Project Manager: Joe Reeder Facilitator:
Xtreme Programming. Software Life Cycle The activities that take place between the time software program is first conceived and the time it is finally.
Product Market Sector: Air Conditioning ASQ Memphis Origin of 8 Discipline Corrective Action April 15, 2014 Prepared by: M. Nick Mahintorabi Date: Jun.
HUNCHHUNCH Title. Observations during Plant Visit. Critical Concern Areas for Change. Vision. Outcome with advantages. Index.
Supplier Overview of Johnson & Johnson MD&D Supplier Quality Standard Operating Procedures (SOPs) Supplier Responsibilities for Failure Investigations.
Solution Identification and Verification of Effectiveness
Root Cause Analysis Course
Reliability Andy Jensen Sandy Cabadas.  Understanding Reliability and its issues can help one solve them in relatable areas of computing Thesis.
© Mahindra Satyam 2009 Defect Management and Prevention QMS Training.
KAIZEN IN HOSPITAL MANAGEMENT Dr S Sridharan MBBS, M.Sc (Med.Admn.), MD (Col.), Dip. IT.
Project monitoring and Control
© ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited 8D Problem Solving TOTAL QUALITY MANAGEMENT 8D Problem Solving.
Re-occurrence Training and Explanation 1.
CMMI. 1.Initial - The software process is characterized as ad hoc, and occasionally even chaotic. Few processes are defined, and success depends on individual.
© ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited Brainstorming TOTAL QUALITY MANAGEMENT Brainstorming.
Quality Circle and 8 D Methodology Dr. Mohamed Riyazh Khan - DoMS.
Academic honesty Academic honesty must be seen as a set of values and skills that promote personal integrity and good practice in teaching, learning and.
Company Confidential Registration Management Committee (RMC) 1 Database Committee Report January 2012 (Data from 2011) San Diego, CA January 10-11, 2011.
Version Corrective and Preventive Action
Topic: Manager’s abilities and roles in a teamwork organisation.  Requirements which have to be fulfilled by present managers. Nowadays, more and more.
Principles and Philosophies of Quality Management .
Prepared By :ANJALI. What is a Team? Two or more persons work together to achieve same goal or complete a task. Teams make decisions, solve problems,
Lab Standards + Documentation Committee
Configuration Management
8D Report training Yu LaiLai Nov
Core Competencies Training for Supervisors
Causal Analysis & Resolution (CAR) Support Category
APQP Five Phase Process
Core Competencies Training for Supervisors
5 Whys TOTAL QUALITY MANAGEMENT 5 Whys.
ROOT CAUSE ANALYSIS RCA
SWIMTOO ROOT CAUSE ANALYSIS BETTER BEFORE BIGGER.
Configuration Management
Background Mandated by DaimlerChrysler for all tier 1 suppliers
Root Cause Analysis Course
Global 8D Problem Solving
FMEA.
Office 5S “S” by “S” Implementation guide Site clear = Clearing Up
How To Restore Missing Store App. Restoring the missing Store app is quite easy in Windows 10. Following are the three ways to restore the missing Store.
ISO 9001 Awareness Training.
Introduction In the first lesson we demonstrated the following:-
GE 6757 TOTAL QUALITY MANAGEMENT
Director, Quality and Accreditation
CAUSE ANALYSIS CA
Visual Control and Failsafing
Layered Process Audits
The Certified Quality Process Handbook Chapter 22: Preventive Action
Background Mandated by DaimlerChrysler for all tier 1 suppliers
Subcomponents 8D for Problem Solving
Get excited-test tomorrow! Head to GOFORM for Bellringer.
ISO 9001 What It Is.
See the possibilities TM.
Background Mandated by DaimlerChrysler for all tier 1 suppliers
Programme Educational Objectives (PEOs)
Make sure everyone participates.
Homework Check Everyone should have their homework out.
When should root cause analysis be performed?
Fishbone (Project name) Material Personnel XXXXXX Environment Method
The 8-D System Awareness of Problem Identify
Failure Mode & Effect Analysis
Hazard Analysis Critical Control Point (HACCP)
1 -: 8D Problem Solving Technique :- Prepared By: Mr. Prashant S. Kshirsagar (Sr.Manager-QA dept.)
Presentation transcript:

8D Problem Solving TOTAL QUALITY MANAGEMENT 8D Problem Solving

8 Disciplines Ford Motor Company started a What is 8D? Ford Motor Company started a problem solving process known as 8D which takes 8 Disciplines and uses them to tackle engineering problems

A typical form is used for the 8D approach to problem solving 8 Disciplines A typical form is used for the 8D approach to problem solving

8D Problem Solving By taking this approach we can continuously improve quality by eliminating the causes of problems and prevent their reoccurrence.

What are the 8 Disciplines? Define the problem. Build a team. Containment action. Determine the root cause. Verify the root cause. Corrective Action. Prevention. Congratulate the team.

D1. Build a Team Once a problem has been bought to our attention, a team must be formed to tackle the problem. Ideally, this will be a team of people with a variety of skills and knowledge related to the problem.

Do we know EXACTLY what the problem is? D2. Define the Problem Do we know EXACTLY what the problem is? Have we seen the problem before? What evidence of the problem is available?

What action can be taken immediately? D3. Containment Action What action can be taken immediately? Do we have stocks that need sorting? Are we still manufacturing parts with the problem? Will the actions that we take cause other problems?

D4. Determine the Root Cause Has the cause of the problem been identified? Is there more than one cause? Did we refer to the F.M.E.A.?

Are we sure that the root cause has been properly identified? D5. Verify the Root Cause Are we sure that the root cause has been properly identified?

Has everyone been notified of the actions taken? D6. Corrective Action Has everyone been notified of the actions taken? Have we reviewed and updated the relevant F.M.E.A.? Have any temporary short term fixes been removed?

Have we taken all actions to prevent reoccurrences? D7. Prevention Have we taken all actions to prevent reoccurrences? Have we considered other similar products or processes?

D8. Congratulate the Team Have we identified each individual team members contribution to solving the problem? Have we acknowledged and appreciated the efforts involved?

8D We have now seen the 8D problem solving method. You may be called upon to help solve a problem. Understanding the 8D approach will help in tackling future problems.