CRaTER Pre-Environmental Review (I-PER) Spacecraft I&T Mike Golightly

Slides:



Advertisements
Similar presentations
During spacecraft-level environmental testing, after all instruments were integrated, the government assembled a data clerk team to support test data collection.
Advertisements

2014 Workshop on Spacecraft Flight Software 1 Pasadena, CA, December 16-18, 2014 ICON End-To-End Operations Philosophy Will Marchant, Manfred Bester, Carl.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
Space Engineering Institute (SEI) Space Engineering Research Center Texas Engineering Experiment Station, Texas A&M University Integrated Thermal Energy.
XMM-Newton EPIC OCB, 6-Nov-2007 EPIC OCB, 6-Nov XMM-Newton Future Instrument Operations Mallorca, 6 th -7 th November 2007 M. Casale, J.R. Muñoz.
March 2004 At A Glance ITOS is a highly configurable low-cost control and monitoring system. Benefits Extreme low cost Database driven - ITOS software.
STEREO Science Center SWG – Dec 2004 William Thompson NASA Goddard SFC Code Greenbelt, MD
ATOMMS Software Review October 25, 2010 History of cRio hardware choice and initial software development.
NASA’s Goddard Space Flight Center LRO Mission Operations Review (MOR)Slide - 1 CRaTER SOC Operations Mr. Michael Golightly CRaTER Deputy Project Scientist.
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
©2010 Fluke Corporation Intro to Fluke Calibration 1 Turkey April 2013 Fluke Calibration.
Aerospace Testing 2006 A Centralized Approach To Ground Support Software To Reduce Technical Risk and Overall Mission Costs Thomas Hauck GSE Software,
1 Lunar Reconnaissance Orbiter (LRO) CRaTER Technical Interchange Meeting C&DH Flight Software April 14, 2005.
STEREO - Solar Terrestrial Relations Observatory Mission STEREO STEREO Science Team Meeting May 2, 2005 Presented by Edward Reynolds APL STEREO Project.
THEMIS FDMO Review Management Topics − 1 October 5, 2004 Management Topics Manfred Bester.
Final Version Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Mission Operations Tim Rykowski Jeffrey Hosler May 13-17, 2002.
ONE Concept. ONE Work area & lab setup ONE Goals Provide single network interface regardless of physical link Provide reliable, isochronous message transport.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (I-PSR) Installation Procedures/Orbiter Level Test Procedures Robert Goeke.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
PDS Geosciences Node Page 1 Archiving Mars Mission Data Sets with the Planetary Data System Report to MEPAG Edward A. Guinness Dept. of Earth and Planetary.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Environmental Review (I-PER) Environmental Test Planing Bob Goeke September 10-11, 2008.
March 2004 At A Glance autoProducts is an automated flight dynamics product generation system. It provides a mission flight operations team with the capability.
NASA’s Goddard Space Flight Center LRO Mission Operations Review (MOR)Slide - 1 CRaTER SOC Operations Mr. Michael Golightly CRaTER Deputy Project Scientist.
NSTX Response to the Lessons Learned Report NSTX TF Coil Repair Review September 3-4, 2003 Al von Halle.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
Adrian Gardner, NASA GSFC CIO August 16, 2011 Strategic Computing Strategy for Goddard Space Flight Center.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Aquarius Mission Simulation A realistic simulation is essential for mission readiness preparations This requires the ability to produce realistic data,
Goddard Space Flight Center Cryogenics and Fluids Branch Status of the AMS-02 Cryocooler January 2007 TIM.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Suites (Backup) Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope.
GLAST User’s Committee Meeting– 1 – June 6-7, 2005 GLAST Burst Monitor (GBM) Chip Meegan NASA/MSFC.
Tracing the JWST Proposal from User Interface to Commanding of an Instrument Margaret Meixner & WIT Balzano, Robinson & CMD.
MODIS SDST, STTG and SDDT MODIS Science Team Meeting (Land Discipline Breakout Session) July 13, 2004 Robert Wolfe Raytheon NASA GSFC Code 922.
C osmic R Ay T elescope for the E ffects of R adiation June 27, 2005Larry Kepko - Data ProcessingPage 1 CRaTER Characterization Data Products & Production.
Timothy QuinnFIELDS SOC CDR – CTG Solar Probe Plus FIELDS SOC CDR Command, Telemetry, and Ground Support (CTG) Timothy Quinn UCB 1.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Environmental Review (I-PER) Spacecraft I&T Mike Golightly September 10-11, 2008.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR FSW Overview Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Environment Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
C osmic R Ay T elescope for the E ffects of R adiation 27 June 2005 Digital Engineering Digital Sub-System Bob Goeke.
TRIO-CINEMA 1 UCB, 2/08/2010 System Design Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
The road to the first E2E tests
Test Executive Trades (1)
Status of the DSP/ASPOC EM
Internet Safety Final Day
Simulink Interface Layer (SIL)
Solar Probe Plus FIELDS MEP iPSR SOC Marc Pulupa April 10, 2017
GLAST Large Area Telescope:
CRaTER Pre-Environmental Review (I-PER) Engineering Requirements/Design Updates Bob Goeke September 10-11, 2007.
Agenda. Solar Probe Plus FIELDS Main Electronics Package iPER Agenda Feb 2, 2017.
CRaTER Pre-Environmental Review (I-PER) Programmatics Rick Foster
Instrument Preliminary Design Review (I-PDR) September 28th, 2005
Current SOC-Ground System Integration Schedule (Jan )
GLAST Large Area Telescope
CRaTER Pre-Environmental Review (I-PER) Completed Verification Results Bob Goeke September 10-11, 2008.
CRaTER Pre-Environmental Review (I-PER) Spacecraft Interfaces Bob Goeke September 10-11, 2007.
CRaTER Pre-Ship Review (I-PSR) Instrument Configuration Bob Goeke
BRIAN KLATT MISSION ASSURANCE MANAGER
CRaTER Pre-Environmental Review (I-PER) SYSTEM SAFETY Brian Klatt
Digital Sub-System Bob Goeke.
Systems Engineering Bob Goeke.
CRaTER Pre-Environmental Review (I-PER) Completed Verification Results Bob Goeke September 10-11, 2007.
Instrument Preliminary Design Review (I-PDR) June 27th, 2005
CRaTER Pre-Environmental Review (I-PER) Engineering Requirements/Design Updates Bob Goeke September 10-11, 2008.
CONTOUR NGIMS Electronics Test History
Integration and Test Organization Chart
Introduction and Overview
Integration & Test Instrument Operations Coordination
CRaTER Pre-Environmental Review (I-PER) Spacecraft Interfaces Bob Goeke September 10-11, 2008.
Presentation transcript:

CRaTER Pre-Environmental Review (I-PER) Spacecraft I&T Mike Golightly September 10-11, 2007

I&T Support CRaTER team will retain the expertise necessary to address any issues that arise during I&T, launch, and initial operations: Digital electronics, spacecraft interfaces, instrument simulator, embedded software: MIT/B. Goeke, D. Gordon Analog electronics: Aerospace Corp/B. Crain MOC-CRaTER SOC interface: MIT/P. Ford, BU/E. Wilson, BU/D. Bradford Assembly Q&A, safety: MIT/B. Klatt

I&T Support Support during I&T activities at Goddard and KSC One team member on the road System experts remain on-call at home institutions to trouble-shoot problems Basis for I&T support strategy Instrument and its operation are extremely simple and straightforward Instrument data available in real-time via Internet Secondary Science & Housekeeping data flows real-time Primary Science available via scp file copy CRaTER Hardware support EM and Flight Spare units located at MIT Spacecraft simulator gives real-time internet access for testing

Delivered Simulators Electrical simulator Mass simulator First instrument electrical simulator check at Goddard in December 2006—no problems S/N 11 simulator delivered to GSFC (Jun 2006) Verified R/T data flow from Goddard to MIT for housekeeping and secondary science packets Mass simulator Delivered to GSFC (Jan 2007)