Monthly Production from NCS 2018 compared with prognosis and 2017

Slides:



Advertisements
Similar presentations
Mid-Bay Bridge Connector Phase II and III December 2011 Project Update.
Advertisements

January 6. January 7 January 8 January 9 January 10.
Docket No Cause No February 27, 2002 Road Runner Oil, Inc. and Gavilan Petroleum, Inc.
IQ and Human Evolution. Readings
Deviation = The sum of the variables on each side of the mean will add up to 0 X
X = =2.67.
1 Given the following data, compute the tracking signal and decide whether or not the forecast should be reviewed.
ELECTRIC KILNS – JANUARY 2015 SundayMondayTuesdayWednesdayThursdayFridaySaturday Small 123 Large Small Large Small Large Small.
Find the mean, variance, and standard deviation of these values: 6.9, 8.7, 7.6, 4.8, 9.0 Sum=
LNG North American Summit 2008 Houston, Texas June 19, 2008 James M. Kendell Energy Information Administration U.S. Natural Gas.
1 Given the following data, calculate forecasts for months April through June using a three- month moving average and an exponential smoothing forecast.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
SunSatFriThursWedTuesMon January
MALAYSIA Feb 21 –22 February 21.
Addition Flashcards Sum of
PSAG mtg 20/03/2015 Finance Alan Grant. 2 PSAG mtg 20/03/2015 Finance Update FY14/15 – February Figures Additional capital funding in January of £63K.
1 Forecasting. 2 Introduction Six Forecasting steps: 1. Determine the use of the forecast 2. Select the items or quantities to be forecasted 3. Determine.
TBC Ingredients ApS TBC Ingredients ApS Edible oils monthly price development month development on page December 2012.
Monetary Policy in Turbulent Times
Deadline for Requisitions Payment Processing Date
2017 RTP Update Doug Murray May, 2017 RPG Meeting Welcome to.
Oil Free Washington December 7th, 2016.
Time Series: Domain  Global Analysis “Monthly Precipitation”
Chapter 4.
The Term Structure and Economic Growth: The Recession of 2001
SO Incentives Consultation
Case Study Resources Unlimited
تخمین مخازن در چاههای اکتشافی
February 12 – 19, 2018.
GDP.
Accurate fluid samples are needed to define fluids in place, especially condensate volume. Separator samples should almost always be used for gas condensate.
عمل الطالبة : هايدى محمد عبد المنعم حسين
آشنايی با اصول و پايه های يک آزمايش
The Term Structure and Economic Growth: The Recession of 2001
July 2016 Fatal Accident Rate, Fatality Rate, and Accident Rate Update
NC Truck Driver Training SCHOOL
انواع المخاليط (التدريس الابداعي )
Monthly Production from NCS 2018 compared with prognosis and 2017
Entry Capacity - update
: القسم 21 إجراء المقابلة التحفيزية.
الجزء 22:المقابلة التحفيزية
Monthly Production from NCS 2018 compared with prognosis and 2017
Solubility.
Pressure drawdown to a gas condensate well
AS IT MONTHLY REPORTS AUXILIARYSERVICES I T For February 2015
Monthly Production from NCS 2018 compared with prognosis and 2017
Name the 3 elements necessary for a fire to exist.
Gas Condensate PVT C7+ fraction in CVD Liquid saturation in CVD
Monthly Production from NCS 2018 compared with prognosis and 2017
Presented for ND League of Cities by Pam Sharp, Director of OMB
AE 473 Liquid Propulsion : Engine Cyles. Open and Closed Engine Cycles.
Busch Vacuum Technology
Revenue Cycle Update January 2017
Revenue Cycle Update November 14, 2016
Graphing Oil and Gas Activity in Texas
Disney Nature Life is Beautiful
The Particle Model of Matter
Salym Field Development
Monthly Production from NCS 2019 compared with prognosis and 2018
Calculus W 18 January 2012.
Calculus F 24 February 2012.
January 2018 ChMC update 5 new change proposals were approved
Calculus W 29 February 2012.
Calculus M 30 January 2012.
Production Month Sun Hours K Monthly Kwh Tou Peak Value After Kwh
Calculus F 27 January 2012.
Monthly Production from NCS 2019 compared with prognosis and 2018
2015 January February March April May June July August September
INTRODCTION OF OIL AND GAS INDUSTRY :.
Industry Governance Group 11th January 2012
Presentation transcript:

Monthly Production from NCS 2018 compared with prognosis and 2017 Updated to February

Production February 2018 Production February 2018 1,559 1,944 363,4 Oil Sum liquid Gas Total mill bbl/d MSm³ /d MSm³ o.e/d Production February 2018 1,559 1,944 363,4 0,672   Forecast for 1,626 2,007 355,9 0,675 Deviation from forecast -0,067 -0,063 7,5 -0,003 Deviation from forecast in % -4,1 % -3,1 % 2,1 % -0,4 % January 2018 1,624 2,026 364,5 0,687 Deviation from -0,065 -0,082 -1,1 -0,015 Deviation in % from -4,0 % -0,3 % -2,2 % February 2017 1,662 2,065 360,6 0,689 -0,103 -0,121 2,8 -0,017 -6,2 % -5,9 % 0,8 % -2,5 %

Oil production 2018

Liquid production 2018

Gas production 2018