2nd Annual SRF/RF/Cryo Workshop

Slides:



Advertisements
Similar presentations
Welcoming, relevant, worthwhile are we? John Pullinger 7 October 2010.
Advertisements

Working Group 1: Microwave Acceleration Summary 10 July 2009.
SMART Goal Setting. Introduction Goal Setting Exercise Identify 4-5 Key Goals/Responsibilities for 2012:
Setting SMART Goals.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
Brandi Kirkland and Skyla Forrester. Is Instruction the Answer? Purpose for identifying the problem is to determine whether instruction should be part.
Welcome to Jefferson Lab R. D. McKeown Jefferson Lab Hypernuclear Workshop May 27, 2014.
Jan Low Energy 10 Hz Operation in DRFS (Fukuda) (Fukuda) 1 Low Energy 10Hz Operation in DRFS S. Fukuda KEK.
How to Write Training Plans Child Support Directors Association 2010 Annual Child Support Training Conference & Expo October 5, 2010.
1 new module Seven cell Cavity, 0.7 m long (high Q L ) 8 Cavities per Cryomodule Fits the existing Cryomodule footprint.
Welcome! Robert Zwaska 23 November 2015 Workshop on Booster Performance and Enhancements.
AIP and Large Projects Arne Freyberger OPS 2015 StayTreat.
C100 summary of performance degradation - VTA to Cryomodule Ari Deibert Palczewski SRF Scientist July 5, 2016.
Operations StayTreat 2016: Reliability Team Plans Andrew Kimber 29 th June 2016 Thomas Jefferson National Accelerator Facility is managed by Jefferson.
Field Emitter Workshop Summary Rong-Li Geng 2016 CEBAF StayTreat June 28-30, 2016.
2016 Operations StayTreat 4-Hall Ops and Operations: What is the Control room vision for 4-Hall Ops?
RF System for C100 Cryomodule C100 GDR mode – Original/Modified Tuner Phase noise 25.6 deg rms /14 Hz rms Phase noise 7.5 deg rms /4 Hz rms.
Science and Technology Briefing Sept
SRF Operating Experience at JLab
Cost Optimization Models for SRF Linacs
Introduction Six-Month Follow-Up on Action Items of Feb 2016 CEBAF Field Emitter Workshop Rongli Geng September 12, 2016.
The LEP Superconducting RF system has reached its maximum configuration of 288 four-cell cavities powered by 36 klystrons in In 2000, this system,
Operations StayTreat 2016: Reliability Team Plans
LIU-PS Beam Dynamics Working Group Introduction and objectives
Preliminary Review of LERF as Cryomodule Testing Facility for LCLS-II
Facilitation Tool: Team Agreement
Cryogenic Heater Controls in C100 Cryomodules
CEBAF Accelerator Status
NL C100 Vacuum Spikes and Valve Trips
QUALITY IMPROVEMENT [SECOND]/[THIRD] QUARTERLY COLLABORATIVE WORKSHOP
Jefferson Lab Reliability Task Force and Initiatives
Plans for improved reliability and margin of the 5th pass separators
Planning the Experiment
Energy Management System (EnMS) Management Review
English for Presentation
CEBAF Accelerator Status
Operational Experience - Field Emission
BAW Prep S1 Global Status Pilot Plant Status
HCM 4007 Innovative Education--snaptutorial.com
BASIC MACHINEGUN COURSE
Navigating the Resident Quarterly Development Plan
Closeout OPS 2017 StayTreat.
Gradient Team Plans Bob Legg 29 June 2016.
[Project Name] STEERING COMMITTEE UPDATE [Date]
Cost Optimization Models for SRF Linacs
Upgraded Injector Test Facility
Introduction to Jefferson Lab
C75 Risk Assessment Geoff Krafft
Operations Department
RF test results of SRF cavity evacuated with NEG pump
Operations Department
CEBAF Performance Plan
Thoughts on Energy Reach
Strategy for operation and recovery of performance at SNS -Background -History of performance -What is our operational strategy -Performance recovery.
Performance Recovery at CEBAF
Rule 21 Working Group 2 IN-PERSON WORKSHOP August 29, 2018
A. Freyberg Aug 2016 ECT’16 =>
Employee engagement Delivery guide
Outline: Recent CEBAF performance JLAB-TN-022 Energy Reach Plan
Ken Baggett JLab Staytreat, 2017
StayTreat Wrap Up OPS 2015 StayTreat.
Jefferson Lab Users Group Meeting Start of the 12 GeV Era
Session 1: How to Have an Effective Meeting
Field Emission and Mitigation in the CEBAF Linacs R Legg, R Geng Jlab SRF Ops Dept. TTC,
Comparison between 4K and 2K operation performance of CEBAF injector cryomodules Grigory Eremeev Monday, August 19, 2019.
Background This slide should be removed from the deck once the template is updated. During the 2019 Legislative Session, the Legislature updated a the.
QCM and C50-12 Status Update
Jiquan Guo, Haipeng Wang
PAC47 Charge Robert McKeown PAC47 July 29, 2019.
Information system analysis and design
Presentation transcript:

2nd Annual SRF/RF/Cryo Workshop Arne Freyberger

Welcome and Workshop Goals The purpose of this one day workshop is to review progress in SRF/RF/Cryo operations since last year's workshop. Review plans to achieve 12GeV operations in the Fall of 2015 and future gradient maintenance plans. Gradient maintenance Performance during beam operations Closing the gap between EmaxOPS and GMES. R&D Identifying the source of gradient loss. Going beyond the C50 program. OPS 2015 StayTreat

Action Items from previous Workshop OPS 2015 StayTreat

Action Items: Dynamic Heat OPS 2015 StayTreat

Actions: Improve Capability Identification of the desire to operate CEBAF on one CHL turned out to be very clairvoyant. OPS 2015 StayTreat

Actions: Valve related issues Review of whether or not the gate valve closure is an issue should be revisit. Expect discussion on this subject during Rongli’s presentation this afternoon. OPS 2015 StayTreat

Actions: C100 (part one) OPS 2015 StayTreat

Actions: C100 (part two) OPS 2015 StayTreat

Actions: C50 related The C50-12 timeline has shifted due to budgetary constraints. More about this at the end of the day. OPS 2015 StayTreat

Actions: 2.2GeV related This represents the most significant outcome/success of last years SRF/RF/Cryo workshop. OPS 2015 StayTreat

Actions: SRF data and Klystrons More on klystrons and RF power later this afternoon from Rick Nelson. OPS 2015 StayTreat

Actions Summary Overall happy with the progress. Overall think the actions distilled from last years workshop were appropriate. High priority actions have been addressed. Would like to see more progress on the C100 issues, or understand why the progress has been what it is. OPS 2015 StayTreat

Energy Reach Tech-note 2014 Update: CEBAF Energy Reach and Gradient Maintenance Needs https://jlabdoc.jlab.org/docushare/dsweb/Get/Document- 95056/14-024.pdf Rama Bachimanchi, Jay Benesch, Michael Drury, Arne Freyberger, Rongli Geng and John Mammosser OPS 2015 StayTreat

Energy Reach Tech-note How do we decreasing the gap between EmaxOPS and GMES? What is the source of the gap? Clyde Mounts presentation later this morning OPS 2015 StayTreat

Energy Reach Tech-note OPS 2015 StayTreat

Energy Reach Tech-note OPS 2015 StayTreat

Klystrons OPS 2015 StayTreat

FY16 and Beyond CEBAF should be in a position to support 2.2GeV/pass, 12GeV operations. Operational weeks will vary due to budgetary issues. 35weeks/year maximum 30weeks/year probably typical Present gradient maintenance plan (C50/year) is insufficient to support 12GeV operations beyond 2022. What’s the plan? Helium process every 5 years? C75? Eliminate gradient loss? OPS 2015 StayTreat

Today’s Agenda Chairs please keep the speakers on schedule and the discussion focused. Speakers please respect the schedule. Audience please keep the discussion relevant, respectful, crisp and invigorating. Actions items will be distilled from the presentations and discussion. No need to solve the problem during the meeting. OPS 2015 StayTreat