TCTVB-VMTSA-TCDD area Xrays at 4L2

Slides:



Advertisements
Similar presentations
We want to test the claim that less than 15% of people have gotten a speeding ticket in the last year. We sample 400 people, and 13% of our sample has.
Advertisements

The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
 Next - Previous  Horizontal Bar  Vertical Menu.
QRL Leak Tests the story so far………. Paul Cruikshank on behalf of TE-VSC colleagues & AL4030 Consortium (S133) 1 Paul Cruikshank TE/VSC - QRL Leak Tests.
Vacuum, Surfaces & Coatings Group Technology Department Cleanness of the 3-4 cold beam lines Outline:  History: Status of 2009 cleaning  Foreseen and.
DR Vacuum Component Overview April 25, 2012 Joe Conway.
1 Pressure observations at TDI till fill 2158 V. Baglin (27/08/11) CERN TE-VSC, Geneva 1. 2.
Few slides from J. Fox’ talk in last November’s LARP meeting LARP CM
Beam Vacuum Quality Control Outline  VSC consolidation  VSC support  Organization  Status Cédric Garion on behalf of TE-VSC Cédric Garion TE/VSC Beam.
E.Guschin (INR,Moscow) 14 February 2007Calorimeter commissioning meeting, CERN Digital camera with LED monitoring Status: Photographs of SPD are completed.
1 Vacuum – Much Ado about Nothing V. Baglin with inputs from P. Cruikshank CERN TE-VSC, Geneva Vincent Baglin LHC Performance Workshop - Chamonix 2011.
ABT LIU Project Review 2015 BI.KSW: Magnet November 20 th 2015 L. Feliciano TE/ABT.
Defining the volumes and functions of the cryogenic suspension Discussion guidance Kashiwa October JGW-G
4 December 2007Sylvain Weisz - LEMIC1 Status of LHC installation.
Draw something like this in the middle of your page!
R ADIATION P ROTECTION ASPECTS LSS1 LHC f RE - INSTALLATION Cristina Adorisio (CERN - DGS/RP) LTEX Meeting – May 10 th, 2012.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 30/08/2013LSC - S. Baird, M. Bernardini1.
Chapter 1: Subtraction!!. Section 1- Subtraction with Pictures.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
Vacuum assessment for BI equipment TE-VSC. Why do we need to assess BI components 10/6/2015 BI Beam Operational Spare Strategy Workshop No 2 2 The main.
Grid Method For Drawing. Using a ruler, measure and make marks ½” apart across the bottom of the picture. You may use your pencil to draw right on the.
Image mapping in HTML Please use the speaker notes for additional information.
Mikhail Ovsienko TE-MPE-EE
LIU and TE/VSC activities LIU-SPS aC coating & flange impedance reduction Paul Cruikshank LIU & TE/VSC activities, 23/6/2016 Paul Cruikshank.
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
Alignment of VSC components along LSS 1&5
TE-MSC activities in SPS during LS2
Introduction to the Microscope
LEP cryostat Procurement strategy and plans
Review on collimator movement with stepping motors
Area Between Two Curves
Configuration Management and Layout Database ELENA Project
Preliminary Y-chamber specifications – First draft
Problem: A kicker failure can deposit 9 x 1011 protons on any metallic
on behalf of the RF group
LHC Beam Vacuum activities during YETS LS2
Region between TAXN and D2 in HL-LHC IR1/5: Implications on Collimator Design Alessandro Bertarelli, L. Gentini (EN/MME) On behalf of the LHC.
Consequences of warming-up a sector above 80 K
Electron cloud & vacuum pressure observations: 2011 proton run
Integration and alignment of ATLAS SCT
EYETS septa status Septa activities TE/ABT Thierry Masson
K. Foraz on behalf of OSS members
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Review on collimator movement with stepping motors
Vacuum Modules in LHC Septa V. Baglin (10/4/12) CERN TE-VSC, Geneva
Elasticity Examples.
Parallel Lines cut by a Transversal
TDI with large gaps V. Baglin (21/10/11) CERN TE-VSC, Geneva
Accessing D2L web site AED 615 Fall 2006 Dr. Ed Franklin.
PRESENTATION LAYOUTS This is a title slide
Instructor: Dr. Tatiana Erukhimova
Creating a grid by Carl Dellutri.
Bitwise Operators CS163 Fall 2018.
LS1 status 28/04/2014.
X-Rays made by P. Lepeule (TE/VSC) and J-M Dalin (EN/MME)
IR2 aperture measurements: results, actions and proposal
Typical NC in Warm Modules Following X-ray campaign
Longitudinal Impedance Studies of VMTSA
Base Right X T G C G T TE QB 3 2.
Even Within The .04% Universe Of Measured Channels, The Results Show An Extremely Long Tail Of Tiny Properties In our custom analysis, the measured YouTube.
LHC installation status
X-rays in A4L2-A4R2 and A4L8 - A4R8 V. Baglin (19/11/11)
LHC Collimator – RF Contact Concept (180o wrap)
Periodic table Notes #4 In 1869, Dmitri Mendeléev created the first accepted version of the periodic table. He.
Project management Ray Veness.
Case 2. Case 2. A) Rocker-bottom deformity of the left foot (*) with midfoot plantar ulcer (arrow). B) X-ray showing fracture of the medial cuneiform (right.
Vacuum Modules in LHC Experiments V. Baglin (26/3/12)
Preliminary Results of MD wk46 V. Baglin, G. Bregliozzi, P. Chiggiato,
Presentation transcript:

TCTVB-VMTSA-TCDD area Xrays at 4L2 V. Baglin (8/11/11) CERN TE-VSC, Geneva X-Rays made by A. Vidal (TE/VSC) and A-M Piguiet (EN/MME)

Layout LSS2 : A4L2 TCDD D1L2 LSS2L : TCTVB TCDD VAB BPMSX D1L2 VAMTF.A4L2.X DCUM = 3259.3524 VGPB.120.4L2.X D1L2 VPIA.A151.4L2.X

VMTSA son of VAMTF.A4L2.X Horizontal ellipse 180/70 Left side Right side LHCVMTSA0001

X-rays the 10-5-2011, DCUM 3259 b a Left side Top view (xray from top to bottom) a)Slight deformation of RF finger. b)No metallic noise due to loose spring Use as IS

X-rays the 10-5-2011, DCUM 3259 b Right side Top view (xray from top to bottom) b) No metallic noise due to loose spring Conform

X-rays the 7-11-2011, DCUM 3259 b a Left side Top view (xray from top to bottom) a)Strong deformation of RF finger. b) Metallic noise due to loose spring when hitting vacuum chamber Non Conform

X-rays the 7-11-2011, DCUM 3259 b c Left side Side view (xray from corridor to QRL) b) Metallic noise due to loose spring when hitting vacuum chamber c) RF fingers falling due to broken spring Non Conform b Spring was broken between May and November 2011 Probably as a consequence of irradiation c

X-rays the 7-11-2011, DCUM 3259 Right side X-ray done also RF fingers and spring are Conform Photo to come

Other similar regions in LHC: Layout LSS2-LSS8 https://lhc-div-miwg.web.cern.ch/lhc-div-miwg/Main_Pages/new_frame%20miwg_icl.htm TCDD VGPB.120.4L2.X LSS2L : TCTVB TCDD VAB BPMSX D1L2 D1L2 VPIA.A151.4L2.X TCLIA LSS2R : D1R2 BPMSX VAB VCTCQ TCTVB TCLIA VGPB.120.4R2.X D1R2 VPIA.A170.4R2.X TCLIA VGPB.120.4L8.X LSS8L : TCLIA TCTVB VCTCF VAB BPMSX D1L8 D1L8 VPIA.A173.4L8.X VGPB.120.4R8.X LSS8R : D1R8 BPMSX VAB TCDDM TCTVB D1R8 VPIA.A147.4R8.X