ERGEG Benchmarking report on long term transmission rights

Slides:



Advertisements
Similar presentations
1 The North West European Market Parties Platform Eric van Vliet, Stephan Krieger, Hans ten Berge Mini Forum of the Central West Electricity Regional Energy.
Advertisements

Draft Cross-regional Roadmap for Day-Ahead Price Coupling NWE Day-ahead price coupling project meeting 15 June 2011.
4th CSE ERI Stakeholders Group meeting AEEG – European regulatory affairs 15 maggio 2012 Overview of the regional work programme towards 2014.
Cross-regional roadmap for Capacity Calculation XXI Florence Forum Florence 5 December 2011.
Access to long-term capacity for electric interconnections: toward a single European set of rules 2 nd common RCC CSE-CWE regions 28 September 2010 Milan.
Electricity Regional Initiative Central South European Region Progress made and next steps for the CS Region By: Giusi Squicciarini AEEG 2nd Stakeholder.
Name Surname Milan, November 2010 European Federation of Energy Traders 1 The Central South Region and the European Target Model – How to ensure consistency?
Future role of GRI NW Stakeholder Group Meeting The Hague, 7 may 2010 Peter Plug Chairman of GRI NW.
Transparency Florence Forum, Dec Transparency is vital for energy markets Transparency in terms of: –Creating and strengthening trust to.
ERI CS REM, 11th IG meeting. Milan, 21 November 2008 Towards a single auction platform in the SW region Rafael Gómez-Elvira Deputy Director for European.
ERGEG Public Hearing Brussels, 6 July 2006 Gunnar Lundberg Chair of the EURELECTRIC WG Wholesale Markets & Trading Vice Chair of the Markets Committee.
Planning for allocation rules and the auction platform NRAs propose to follow a two-steps approach:. 2013: » Based on the wish-list and within the scope.
The future of GB-Continent: Interconnection & Electricity Regional Initiative Simon McVeigh France-UK-Ireland Stakeholder Group meeting 4 th July 2008,
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
1 Priority issues for the French-UK-Irish regulators What is expected from TSOs? 30 May 2006 To increase trade between adjacent markets and therefore have.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Update on Coordination of long term auctions in the FUI region FUI IG, London, 13 th September.
Cross-regional roadmap for Long- Term Transmission Rights XXI Florence Forum Florence 5 December 2011.
Update on Ofgem’s interconnector policy consultation FUI IG, London, 13 th September.
1 XVI Florence Forum Jose Sierra Madrid, 4 June 2009 Chair, RIG ERGEG Electricity Regional Initiative Update & Progress.
FUI Electricity region: Update on Congestion management CRE SG Meeting - 3 December 2008.
Draft cross-regional roadmap for Long-Term Transmission Rights Still work in progress, for discussion 27 June 2011.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
IG FUI, Brussels, 21 st of May European thinking on intraday target model.
Action for establishing a Single Auction Office for CSE Electricity Regional Initiative - Central-South Region 2 nd Stakeholders Group Meeting 21 April.
Parallel local initiatives – Central West electricity region and the Pentalateral Forum Mr Dominique Woitrin CREG, Belgium The Regional Initiatives: Progress.
Electricity Regional Initiative Central South European Region Draft Report on Transparency for the CSE-Region Jan Müller Bundesnetzagentur ERI Central.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Co-ordination of Decisions at Regional and European level.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
Electricity Regional Initiative Central Eastern European Region Congestion Management – Status & Prospects Tahir Kapetanovic E-Control CEE Stakeholder.
José Sierra, RIG Chair Rafael Gómez-Elvira (RIG Chair Team) XIX Florence Forum 14 December 2010 ERGEG Electricity Regional Initiatives Status Review.
Long term allocation 2011 Italian borders Central-South and Central-West Regions 2nd Joint RCC meeting Milan, September 28 th, 2010.
Electricity Regional Initiative Central Eastern European Region Market Entry Barriers – Regulators’ View Walter Boltz E-Control CEE Stakeholder Group Meeting.
0 Congestion management Congestion management Giedrius Radvila AB “LIETUVOS ENERGIJA” Minifora Vilnius.
Cross Border Intraday on the North Italian Borders Introduction Forum Rome, 13 th March 2012.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
Transparency for market participants in the Northern Europe whole sale market Status and challenges By Jan Hansen, DERA.
RMC Regional Market Coordination RMC Regional Market Coordination RMC Regional Market Coordination CWE Capacity Allocation Service Company CASC Presentation.
Northern Europe Electricity Regional Initiative 5th Stakeholder Group Meeting Transparency in the region 26. May 2010, Copenhagen Jan-Welf Selke Bundesnetzagentur.
ERGEG Public Hearing 30. June 2005 Congestion Management Guidelines.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
Achievements and next steps in the Central-South Region Central-South Region 3rd SG meeting Milan, November 16 th 2010.
2nd IMPLEMENTATION GROUP MEETING. Lisbon, 24th January 2008 Conclusions from the 3rd technical RCC.
David Halldearn 6 May Background Programme Board initial discussion last year at Stockholm Since then: Further analysis has been undertaken on.
Congestion Management Mr Carlo Crea AEEG, Italy The Regional Initiatives: Progress and Prospects Conference Brussels, 28 March 2007.
SEM Regional Integration Decision Paper FUI Stakeholder Group Meeting 16 June 2010.
BALTIC ELECTRICITY MARKET MINIFORA Vilnius 23 November 2006 Tasks of the summary of the IG discussion paper on the Baltic ITC mechanism Dace Bite Public.
SOUTH SOUTH-EAST GAS REGIONAL INITIATIVE WORK PLAN Francesco Cariello, AEEG 20 th Madrid Forum, September 2011.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
The Regional Initiatives deliver concrete results in the regions but will the regions join up? Ms Asta Sihvonen-Punkka ERGEG’s Electricity Focus Group.
Status Report of the Electricity Regional Initiative Ms Asta Sihvonen-Punkka ERGEG Electricity Focus Group (EFG) Chair The Regional Initiatives: Progress.
Development and Implementation of a Coordinated Model for Regional and Inter-Regional Congestion Management Development and Implementation of a Coordinated.
Christophe Gence-Creux SG FUI, Paris, 4 th November. Target models and roadmap proposed by the PCG.
Electricity Regional Initiative – Convergence and Coherence of the Regional Development Ms Asta Sihvonen-Punkka Chair of the ERGEG Electricity Focus Group.
CNMC and CRE intend to formally approve IFE rules 3.1 by mid-March
Cross-regional roadmap for Long-Term Transmission Rights
Public Consultation : main conclusions (1/2)
Capacity allocation in natural gas transmission networks Pilot framework guideline - Public consultation results and new content of guidelines - Dr.
New transparency guidelines
Cross-regional roadmap on capacity calculation and long-term capacity allocation Impact for the FUI regional roadmap Work document FUI Implementation Group.
Moyle & East West Access Rules Approval
Feedback on the SWE coupling Public Consultation
ETSO Comments on the draft Congestion Management Guidelines
Regulators’ update on Congestion Management and Balancing
SG meeting FR/UK/IR region 14 June 2007 Congestion management
9th FUI Stakeholder Group Meeting Dublin, 16 June 2010
EER Work Programme 2011 – electricity
Tahir Kapetanovic ENM TF Co-Chair XIX Florence Forum
Incentives for electricity infrastructure – ERGEG view
Review of Framework Guidelines Processes
Presentation transcript:

ERGEG Benchmarking report on long term transmission rights Francesco Cariello Christophe Gence-Creux ERI TF co-chairs XIX Florence Forum 14th December 2010

The ERGEG LT benchmarking report Lessons learnt Outline The ERGEG LT benchmarking report Lessons learnt The ERGEG conclusions paper

The ERGEG benchmarking report Improvement and Harmonisation of allocation rules for long term interconnection capacity: a top priority for almost all the Electricity regions (CWE, CEE, CSE, SWE and FUI) 21 out of 28 borders studied Benchmark focused mainly on Conditions for participating in the auctions Characteristics of allocated products and secondary markets

2. Which lessons ? High level of convergence of the long term auction rules Need for harmonisation, within the region and between regions, notably firmness of both allocated and nominated capacity, Force Majeure definition, obligations and responsibilities of parties Harmonisation could be facilitated by implementing a common allocation platform at regional level  Sharing the same Auction Office among different regions could further improve the cross-regional harmonisation

3. Conclusions paper: the ultimate goal is within reach Strong support from all respondents to the public consultation towards the long-term goal: a European-wide platform operating a single set of auction rules The draft framework guidelines drafted by ERGEG take a position on the main pending issues: Firmness: curtailments compensated at market spread. Physical firmness for nominated capacity is the preferred approach; The level of capacity allocated in the long-term timeframe will be subject to regulators’ approval; The nature of allocated products: FTRs or PTRs, CfDs under certain conditions The organisation of the secondary market: a regional platform for anonymous secondary trading

3. Conclusion papers: A need for a clear action plan Each region should decide the way towards a single allocation platform: Extension of CASC to the Central-South region and Switzerland is ongoing: one single platform in 2011; one single set of auction rules in 2012 Further possible extension of CASC to the Northern-CWE borders FUI and SWE regions should either establish new regional auction offices or consider the possible extension of CASC on their respective borders Implementation of harmonised rules with capacity auctioned by the Capacity Allocation Office in the CEE region

Thank you for your attention! www.energy-regulators.eu