Levelling Staff Check bottom of staff for wear and cleanliness

Slides:



Advertisements
Similar presentations
Measuring distance on a map Measuring distance on a map is one of the most important skills to develop. If you can accurately measure the distance you.
Advertisements

Levelling Checks.
Inside-, Depth-, and Height-Measuring Instruments
Excursions in Modern Mathematics(Tannenbaum) and Thinking Mathematically (Blitzer)
Recone Steps for 9900 Series. Tear Down 1 Cut through surround and spiders, remove cone assembly.
Instructions 1.  SITING YOUR TRAMPOLINE  Your trampoline works best and is safest if it is dead level. If your trampoline is fitted.
Instructions  SITING YOUR TRAMPOLINE  Your trampoline works best and is safest if it is dead level. If your trampoline is fitted.
New Hexagonal Design for MINERvA A. Bodek- Sept Now even counters have a 1.2 solid steel picture frame Around the 3 m wide active target. The.
Surveying Equipment.
Course Estimating Square Roots 4-6 Estimating Square Roots Course 3 Warm Up Warm Up Problem of the Day Problem of the Day Lesson Presentation Lesson.
TOOL: Radial Arm Saw NEXT STEP: Radial Arm Saw RESULTS: Finish Top Apron Pieces at 9” L x 4” W x ¾ “ Th PROJECT Square Plant Stand PART Top Apron # NEEDED.
World Archery Judges’ Training Aid – May VENUE & FIELD LAYOUT.
MC11000 Kit Replacement 1 1. Open the face plate and remove the 2 screws. Remove and discard the original face plate. 3. Remove the 2 white caps on the.
Catch the Spirit of Mathematics Mathematics Investigations Challenge – Impossible Task or Not? 1.Materials needed: Eleven box nails, all the same size.
FITA Judge Seminar – Bangkok 2010 VENUE & FIELD LAYOUT.
TOTAL STATION SET UP PROCEDURE
SETTING OUT Horizontal Angles. Ensure instrument is set to measure angles in the appropriate direction. ( refer to operators manual) Unclamp both vertical.
Safety Talk 20 / 1 Safety Talk 20 Slips, Trips and Falls.
How to make a portrait template By Carlin Bright ACT-IED-8. Students will demonstrate use of proper line types a) Demonstrate the ability to perform a.
Telephone Skills Make sure you identify the “MTSS” as well as yourself when you answer the phone Be sure to offer assistance: “How can I help you” or.
Instructions 1.  SITING YOUR TRAMPOLINE  Your trampoline works best and is safest if it is dead level. If your trampoline is fitted.
NAME OF THE GAME SEVEN STONES. THEME  SOLIDARITY AMONG GROUP MEMBERS.
5th Grade Name Tangles line, pattern, pos/neg
KEY CONCEPTS: WHAT IS MEANT BY UNCERTAINTY? HOW DO WE DEAL WITH UNCERTAINTY IN OUR MEASUREMENTS? KEY TERMS: UNCERTAINTY ESTIMATED UNCERTAINTY PERCENT UNCERTAINTY.
© Nuffield Foundation 2011 Nuffield Free-Standing Mathematics Activity Measure it!
Unit 1 Measurements Measurements. All measurements in science are called variables and consist of a…… Number Unit Example: 3.4 m, 30 sec, 100 km/hr No.
Planning and Drawing an Agricultural Project. Planning An Agricultural Project  Blueprints are used to plan projects. They can be:  Hand Drawn – Can.
Course Estimating Square Roots Warm Up Find the two square roots of each number. Evaluate each expression. 12
SHHS Disaster Planning Information To prepare students for responding to an emergency situation.
Pigment Chromatography. Plant leaves contain different color pigments that give the leaf color. Plant pigments come in many different colors but we are.
Keratometry and Corneal Topography Instructions. Generally the keratometer & corneal topographer are combined into one instrument that does each reading.
SketchUp Toy Boat Level of Difficulty Time Approximately 15–20 minutes
Chain survey
Exploring Mathematical Relationships Module 5: Investigation 3
McEvoy and Langston inc
Vanderbilt Student Volunteers for Science Fall 2011
Contour Line Drawing.
The only realistic drawing convention= vital for designers:
Rocket Difficulty Time Approximately 30–35 minutes Art Deco Clock
Plane table surveying with contouring
Estimating Square Roots
به نام خداوند بخشنده و مهربان
Similar Figures Trashketball
Chapter 5 Visual Aids for Navigation
Multi-View Sketching STEM Foundations Multi-View Sketching
Auto Level View though eye piece Purpose
Using a compass..
استاد:مهندس شهید زاده محمد رضا چناری
Magic Loops You will need: A long length of string
Spring 2016 Vanderbilt Student Volunteers for Science
Minimum and Maximum values
Levelling Staff Check bottom of staff for wear and cleanliness
LET’S ORGANIZE YOUR BINDER
Take a photograph with your phone
Physical Properties of Minerals
Break down Lance rack Cut one of each of these for each rack
Curriculum on The Cadet Corps Uniform
Graphic Products Perspective.
Super Structures Making a geodesic dome Image is from OpenClipart.
LEARNING OBJECTIVES : To understand how to estimate depths in one point perspective To understand how to find the centre of an object in one point perspective.
Chain survey By :- Parveen Kumar.
Here’s the flange for the robot
Surveying Equipment Lesson Plan PSTS: C1-2.
Two point.. Ref:
Practical Skills.
Measuring Instruments
Measuring Height & Weight
Two types of scoring systems used to measure pain.
Measure lengths in dm, cm, m, including using rulers
Presentation transcript:

Levelling Staff Check bottom of staff for wear and cleanliness Hold staff Vertical Use spirit level attachment if necessary OR line up edge of staff with edge of a building For more accurate work “rock” staff towards and away from Instrument Be aware of hitting live overhead cables with aluminium staff

Reading Staff Alternate colours BLACK / RED every 1metre Leg of E and small blocks are 10mm i.e. 0.010m Learn to estimate to nearest 2mm i.e.0.002 If extension used, check catch fully engaged Use peg, foot plate or other easily retraced point for change points and mark its position with a temp. marker.

Reading Staff For close up work numbers may not be visible – ask assistant to place pencil on staff and move it up/down until it is visible then look at staff with naked eye.