The Department of Energy Enterprise Risk Management Model
Advertisements

Risk based internal auditing – an introduction Slides of figures and appendices ©David M Griffiths
Risk The chance of something happening that will have an impact on objectives. A risk is often specified in terms of an event or circumstance and the consequences.
Appendix H: Risk training slides (sample). What is Risk? “ Risk is the effect of uncertainty on objectives ” AS/NZS ISO31000:2009.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
1 Governance 1. Board Size and Composition 2. Board Committee Structure 3. Board Membership and Recruitment 4. Director Compensation and Ownership 5. Senior.
Risk based internal auditing – an introduction Slides of figures and appendices ©David M Griffiths V3.2 ©David M Griffithswww.internalaudit.biz.
Action Implementation and Monitoring A risk in PHN practice is that so much attention can be devoted to development of objectives and planning to address.
Project Risk Management
©Ian Sommerville 2006Software Engineering, 8th edition. Chapter 5 Slide 1 Project management.
Risk based internal auditing – an introduction Slides of figures and appendices ©David M Griffiths
By Saurabh Sardesai October 2014.
Establishing an Effective Enterprise risk management (ERM) program
Risk Management Report to Audit Committee 26 September 2006 Lee Harris Assistant Chief Executive.
What is Risk Management - Panel Discussion Tony Whitworth Vice-President Finance & Resources.
IT Risk Management, Planning and Mitigation TCOM 5253 / MSIS 4253
©Ian Sommerville 2006Software Engineering, 8th edition. Chapter 5 Slide 1 Risk management.
Private & Confidential1 (SIA) 13 Enterprise Risk Management The Standard should be read in the conjunction with the "Preface to the Standards on Internal.
Chapter 15: Risk Management
OHS Risk Assessment of Work. Overall procedure Identify hazards Assess Inherent Risk (without controls) Using Consequence & Likelihood tables Determine.
Team Assignment 10 K15T02-Team Scope 2.Risk Management Process 3.How to determine the impart of risk 4.Top 10 risk of Viking.
CSC 480 Software Engineering Lecture 5 September 3, 2004.
(Project) RISK MANAGEMENT PROCESS SEPTEMBER 5, 2008.
PIC EU-28 Conference Paris, 26 – 27 November 2015 PIC An EU Approach Assurance Maps An Introductory workshop Nathan Paget United Kingdom.
Governance, Risk and Ethics. 2 Section A: Governance and responsibility Section B: Internal control and review Section C: Identifying and assessing risk.
Updated Risk Management template
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
OHS Risk Assessment of Work
COMP201 Project Management.
An Overview on Risk Management
Providing assurance on risk management and controls
Risk management Be aware. Take care.
Monitoring and Evaluation Systems for NARS organizations in Papua New Guinea Day 4. Session 12. Risk Management.
Talent Management Director
11.1 Plan Risk Management The process of defining how to conduct risk management activities for a project Detailed risk planning enhances the overall probability.
Ensuring a safe workplace
Board of Health Workshop
Scoring Impact Very High High Medium Low Very Low
COSO and ERM Committee of Sponsoring Organizations (COSO) is an organization dedicated to providing thought leadership and guidance on internal control,
Software Engineering B.Tech Ii csE Sem-II
Research Project Overview
Project Risk Management
ITPD ISSUE MANAGEMENT PROCESS SEPTEMBER 5, 2008
Risk Register I want to plan a project
Employee Performance and Conduct
Audit Risk Assessment Model
CEN 4021 Software Engineering II
Management. Management What is a risk? A risk is simply a probability that some adverse circumstance will actually occur.
Enterprise Risk Management (ERM) at Clayton State University
Libraries are in challenging times
Module 5 The Climate Expert and your role as a consultant
KOOYOORA LTD Michael Shand QC 2 August 2018 Conference
Figure 3: Risk Analysis Model
Risk Management Process (Revised)
Managing Operational Risk
Lecture 2 – Risk Management Process
Confidence in Managing Risk
Insert Programme Name Risk Report to insert name Month Year.
Project Management Group
Project Risk Management
Managing Project Risks and Opportunities
Risk parameters (consequence)
Corruption Risk Assessment
Risk Management PPD July 2019.
RISK RATING GUIDE APPENDIX C LIKELIHOOD RATING Rating Description
Risk Scoring: Likelihood Less than 10%
10 Identify risk and apply risk management processes BSBRSK401.
Operational Risk Management
Director, CPF Financial Services Limited
Risk Risk is the product of How to reduce risk?
Presentation transcript:

FiMT Governance Committee 7 Aug 2018 – Risk Register Discussion – Item 6 START Assess potential risks and impact Make risk appetite decision Introduce controls to mitigate risks Identify and deal with risk events Report and learn from risk events Regular assessment of status of risks Enhance controls to address Risk Management Cycle

Inherent Risk Rating Assessment (C) Risk Register – proposed enhanced version Risk Impact Ratings: A – Likelihood (1-5) B – Impact (1-5) C – Score (AB+B) Changes since previous version shown highlighted   15 points or more – Board action required 8-14 points – Board monitoring of actions and/or Exec Team actions required 7 points or less – Routine Exec Team monitoring required ID # Identified Risk A B Inherent Risk Rating Assessment (C) Existing Controls Status (incl. Any risk events) Action / mitigating plan Resp. Current risk (CEO assessment) Governance (through GC) G1 Unexpected loss of key people such as Chairman or CE 2 3 9 Deputy Chairman role created Informal arrangement with Alium for Interim CE at 48 hours’ notice Succession planning Regular review at GC meetings and included in Board reports Chairman and CE in role. Further recruitment underway to enhance executive team including Dep CEO. Complete recruitment for key executive vacancies. CE G2 Insufficient Board capacity or skills Directors selected for experience and knowledge relevant to FIMT needs. Succession planning considered by Governance Committee Resignations of Andrew Barnett (Independent) and Melanie Waters (COBSEO director). Board remains effective but sub-optimal so replacement board directors being sought. COBSEO requested to nominate new director. GC considering independent director vacancy. CE & GC

Risk Assessment Scoring Methodology (Recommended by Charity Commission) Impact Descriptor Score Impact on service and reputation Insignificant 1 • no impact on service • no impact on reputation • complaint unlikely • litigation risk remote Minor 2 • slight impact on service • slight impact on reputation • complaint possible • litigation possible Moderate 3 • some service disruption • potential for adverse publicity - avoidable with careful handling • complaint probable • litigation probable Major 4 • service disrupted • adverse publicity not avoidable (local media) • complaint probable • litigation probable Extreme/ Catastrophic 5 • service interrupted for significant time • major adverse publicity not avoidable (national media) • major litigation expected • resignation of senior management and board • loss of beneficiary confidence Likelihood Example Remote may only occur in exceptional circumstances Unlikely expected to occur in a few circumstances Possible expected to occur in some circumstances Probable expected to occur in many circumstances Highly probable expected to occur frequently and in most circumstances