Models for the operational programme and the cooperation programme

Slides:



Advertisements
Similar presentations
1 Categorisation of EU interventions Cohesion policy
Advertisements

Fiche 5A Payment Application Fiche 5B Accounts 12th Meeting of the Expert Group on Delegated and Implementing Acts for the ESI Funds 28 June 2013.
© Shutterstock - olly Delegated Acts ESF Art 14.1 Expert Group on delegated and implementing acts 3 October 2013.
Expert group meeting on models, draft templates and guidance for the Partnership Agreement and operational/cooperation programmes under cohesion policy.
Regional Policy Template and model for cooperation programmes under the ETC goal 1 13 th Meeting of the Expert Group on Delegated and Implementing Acts.
Regional Policy Template and model for cooperation programmes under the ETC goal 1.
Ad hoc expert group meeting on draft templates and guidance for the Partnership Agreement and operational programmes under cohesion policy
Regional Policy EXCHANGES OF INFORMATION BETWEEN THE M EMBER S TATE AND THE C OMMISSION (SFC2014) Fifth Meeting of the Expert Group on Delegated and Implementing.
Waterways Forward Partnership Agreement Delft, 12 February 2010 Kick-off meeting.
Draft model for the Annual and Final implementation report under the Investment for Growth and Jobs goal Marko Prijatelj Directorate General for Regional.
Technical Assistance Strategy Romania-Bulgaria Cross-Border Cooperation Operational Programme Technical Meeting&Joint Approval Committee, Bucharest,
Belarus Denmark Estonia Finland Germany Latvia Lithuania Norway Poland Russia Sweden 4. Implementation of the BSR INTERREG IIIB Neighbourhood Programme.
WORLD TRADE GROWTH. GLOBALIZATION Way of life Way of production Keeping in touch with the universal dimension of international trade.
Regional Policy EXCHANGES OF INFORMATION BETWEEN THE M EMBER S TATE AND THE C OMMISSION (SFC2014) 22nd Meeting of the Expert Group on Delegated and Implementing.
SFC THE NEW FUND MANAGEMENT SYSTEM FOR THE PROGRAMMING PERIOD
Second expert group meeting on Draft fiche on delegated act on the European code of conduct on partnership (ECCP) Cohesion Policy
Fulfillment of conditions and contracting Līga Kalvāne Joint Technical Secretariat Lead Partner Seminar 15 October 2009, Siauliai.
Template and guidance for the content of the Partnership Agreement 24 May
EuropeAid Delegated Co-operation November EuropeAid 2 SUMMARY BACKGROUND TO CO-FINANCING AND DELEGATED COOPERATION INDIRECT CENTRALISED MANAGEMENT.
Preparation of future ENI CBC programmes - State of Play Vanessa De Bruyn (DG DEVCO) 3 December 2012.
Transport Enhancing TEN-T funding Pawel Stelmaszczyk Special Envoy for European Mobility Network DG MOVE Warsaw, 18 December 2013.
Monitoring of financial instruments and provision of monitoring information to the Commission under the Annual and Final implementation reports António.
SFC2014 and Rural Development Programmes (RDPs) management
Transport The new TEN-T guidelines High Level Meeting Danube Commission Cesare Bernabei Budapest, 9 October 2013.
Template for the Operational Programme under the Investment for Growth and Jobs goal Morten Greve Directorate General for Regional and Urban Policy
EN Regional Policy EUROPEAN COMMISSION Information and Publicity SFIT meeting, 12 December 2005 Barbara Piotrowska, DG REGIO
Participation and dissemination Rules and Contracts FP6.
Agriculture and Rural Development SFC2014 structured approach DG Agriculture and Rural Development G.2 - Unit "Financial coordination of Rural development"
State of play of OP negotiations and OP implementation ESF Technical Working Group Luxembourg, 2 December
DESCRIPTION OF THE MONITORING AND EVALUATION SYSTEM IN POLAND Action Plan and the Two-year NRN Operational Plans.
For a better place to live! OPERATIONAL PROGRAMME “REGIONS IN GROWTH” Investing.
Simplification and Harmonization - Update UNDAF results matrix: feed back from roll out countries Joint Programming.
Information Overview SF: Planning & Programming Workshops for EC Delegation Patrick Colgan & Ján Krištín PROGRAMMING PROCEDURES in Support of Regional.
National Agencies’ contribution to the evaluation of Grundtvig Action and to the National Evaluation Report on Socrates Programme Socrates - Grundtvig.
Sectoral Operational Programme “INCREASE OF ECONOMIC COMPETITIVENESS” October 2005 MINISTRY OF ECONOMY AND TRADE.
Draft model for the Annual and Final implementation report under the Investment for Growth and Jobs goal 12 th meeting of the Expert Group on Delegated.
Governing a multilevel Europe Luc Martens, President VVSG – Mayor Roeselare Brussels, 2 December 2014.
PANEL 1 ESI Funds and best practice Romania’s experience
Participation and dissemination Rules
Monitoring Committee Valmiera (Lv) 10/5/2017 Arturo Polese (DG REGIO)
Background Legal basis of the TA financing decision: Article 45 of Council Regulation (EC) No. 1083/2006 of 11 July 2006 laying down general provisions.
ESF Technical Working Group Brussels, 10 October 2016
Performance framework review and reserve
Instrument of Pre-Accession (IPA) IPA State of Play
ESF Technical Working Group Brussels, 5 October 2017
State of play of PA and OP negotiations
Update on the extension of the Youth Employment Initiative (YEI)
EU ENERGY & SUSTAINABLE DEVELOPMENT POLICY IN THE EU EXTERNAL PROGRAMMES FEMIP & NIF Energy projects Brussels, November 25th 2008.
Supporting Cities and Regions through Projects and Programmes
ESF Committee and Coordination Committee in the programming period
Financial Instruments under the ESF State of Play & Implementation
State of play of PA and OP negotiations
State of play of PA and OP negotiations – Key issues emerging from negotiations ESF Technical Working Group Brussels, 4 March 2014.
Good Practices in Statistical Cooperation with Enlargement Countries
The partnership principle in the implementation of the CSF funds ___ Elements for a European Code of Conduct.
Draft model for the progress report Expert group on 24 October 2013 First discussion Marko Prijatelj Directorate General for Regional and Urban Policy.
European Investment Bank Group
Youth Employment Initiative implementation: state of play
Art. 17 EGTC Indicators 13th Meeting of the Expert Group on Delegated and Implementing Acts for the ESI Funds 4th July 2013.
Knowledge Economy team,JASPERS
PERFORMANCE FRAMEWORK
Financial Engineering Modification of the Council Regulation
ESF Technical Working Group Tallinn, 28 November 2017
Youth Employment Initiative: technical issues
JEREMIE SNAPSHOT: An Innovative instrument to support SMEs
LAMAS Working Group June 2017
Reviewing Core Indicators
Implementing act on the model for the annual and final implementation report under the European Territorial Cooperation goal 12th Meeting of the Expert.
Annual meeting of managing authorities ETC programmes April 2013
Evaluation of Youth Employment Initiative
Presentation transcript:

Models for the operational programme and the cooperation programme

Main elements Models form the basis for the development of the SFC 2014 They define the manner in which data on operational programmes and cooperation programmes will be entered in SFC 2014 They include technical characteristics of each field in the electronic data exchange system Possibility to submit unstructured information in the form of compulsory or non-compulsory annexes (no technical characteristics laid down)

Legend for fields(1)* Type: N=Number, D=Date, S=String (text), C=Checkbox, P=Percentage, B=Boolean Input: M=Manual, S=Selection (from a pre-defined list), G=generated by system (based on information already inserted) Maximum number of characters including spaces –“ maxlength” Decision: N=Not part of the Commission decision approving the operational programme *Included in the models

Legend for fields (2) PA - Y=Element can be covered solely by the Partnership Agreement TA – NA= not applicable in the case of operational programmes dedicated exclusively to technical assistance YEI – NA =not applicable in case of operational programmes dedicated exclusively to the Youth Employment Initiative SME= applicable to programmes dedicated to joint securitization financial instruments in favour of SMEs, implemented by the EIB

Written comments can be sent until 6 December to: Thank you Written comments can be sent until 6 December to: REGIO-DELEGATED-AND-IMPLEMENTING-ACTS@ec.europa.eu