Comments to the SVD4 structure

Slides:



Advertisements
Similar presentations
A Low Mass On-chip Readout Scheme for Double-sided Silicon Strip Detectors 13th February 2013 C. Irmler, T. Bergauer, A. Frankenberger, M. Friedl, I. Gfall,
Advertisements

Electrical QA Markus Friedl (HEPHY Vienna) IPMU, 19 March 2012.
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Summary of the SVD session 19 March 2009 T. Tsuboyama (KEK)
The Belle II Silicon Vertex Detector Readout Chain Markus Friedl (HEPHY Vienna) TWEPP2012, 19 September 2012.
The Origami Chip-on-Sensor Concept for Low-Mass Readout of Double-Sided Silicon Detectors M.Friedl, C.Irmler, M.Pernicka HEPHY Vienna.
Construction and Status of the Origami Module Prototype C. Irmler HEPHY Vienna.
Striplet option of Super Belle Silicon Vertex Detector Talk at Joint Super B factory workshop, Honolulu 20 April 2005 T.Tsuboyama.
Construction and Performance of a Double-Sided Silicon Detector Module using the Origami Concept C. Irmler, M. Friedl, M. Pernicka HEPHY Vienna.
M.Friedl, C.Irmler, M.Pernicka HEPHY Vienna
19 November 2009 Christian Irmler (HEPHY Vienna) APV25 and Origami Scheme 4 th Open Meeting of the Belle II Collaboration.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD IR Mechanics 7 th B2GM.
27 January 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Mechanics and Cooling DEPFET Meeting Prag.
SVD Mechanics 21th B2GM Florian Buchsteiner (HEPHY Vienna)
1 Mechanics news from KEK S.Tanaka (KEK) SVD/PXD meeting SVD parallel session.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1.
APV25 for SuperBelle SVD M.Friedl HEPHY Vienna. 2Markus Friedl (HEPHY Vienna)11 Dec 2008 APV25 Developed for CMS by IC London and RAL (70k chips installed)
Origami Chip-on-Sensor Design: Progress and New Developments 19th September 2012 TWEPP 2012, C. Irmler (HEPHY Vienna) TWEPP 2012, Oxford University.
Collision Analysis SVD Meeting Markus Friedl (HEPHY Vienna) 18 June 2015.
Jochen Ebert, Uni Karlsruhe1 Powering via cooling pipes very first results.
Jigs and procedure for ladder assembly BelleIInote #8 6 th Feb 2012 Yoshiyuki Onuki University of Tokyo 1.
Status of SVD Readout Electronics Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Construction and Test of the First Belle II SVD Ladder Implementing the Origami Chip-on-Sensor Design 29 Sept TWEPP 2015, C. Irmler (HEPHY Vienna)
Super-Belle Vertexing Talk at Super B Factory Workshop Jan T. Tsuboyama (KEK) Super B factory Vertex group Please visit
The Belle II Silicon Vertex Detector Florian Buchsteiner (HEPHY Vienna)
The Mechanical Structure for the SVD Upgrade
SVD Mechanics Markus Friedl (HEPHY Vienna) BPAC, 26 October 2015.
18 March 2009 Thomas Bergauer Prototype batch of DSSD from commercial vendors & Proposal for SVD Layout HEPHY Vienna.
1 Beam pipe and VXD mockup status at KEK S.Tanaka (KEK) SVD/PXD meeting.
Tasks and time scale T. Tsuboyama (KEK). DSSD production Test production by Micron and SINTEF (Talk by M. Valentan) HPK decided to restart DSSD business.
11 June 2015 Thomas Bergauer (HEPHY Vienna) Belle II SVD beam Test SPS 2015 SPS users meeting.
Construction and Status of the Origami Module Prototype C. Irmler, M. Friedl HEPHY Vienna.
DSSD update. 2Manfred Valentan, 3 rd Open Meeting of Belle27-9 July 2009 Outline DSSD design in Vienna: How it is done First test batch of SVD DSSDs Status.
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
Origami and PA design 6 February 2012 Christian Irmler (HEPHY Vienna) 1 Common SVD-PXD Meeting.
Comments on ladder structure 5 Feb Toru Tsuboyama.
SVD Ribs and SLM M.Friedl, F.Buchsteiner, R.Thalmeier (HEPHY Vienna) 27 May 2014.
SVD assembly S.Tanaka. Outline SVD assembly work is individual with Beam pipe, heavy metal shield and PXD system. –Assembly work will be done on two assembly.
Next chance for Service test. In the next B2GM Use of old VXD KEK The screw connection may not work. -> double scotch tape for PXD PP mock 1/4.
Ladder Mount R&D T. Tsuboyama (KEK) 2 Oct T. Tsuboyama (KEK) 2 Oct
SVD DAQ Status Koji Hara (KEK) 2012/7/19 DAQ workshop1.
Origami and Cooling 24th September 2012 C. Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
SVD Cables & Pipes Markus Friedl (HEPHY Vienna) B2GM, 24 July 2012.
SVD IR mechanics status S.Tanaka SVD mechanics session.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
Beam abort in KEKB and Background measurement by SVD 8 Feb T. Tsuboyama (KEK)
VXD mechanics issues S.Tanaka. Remaining issues (short term) SVD ladder mount table –Mount arm design(KEK+SVD) –Origami cooling pipe assembly procedure.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Schedule 24 September 2012 Christian Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
Mechanical robustness & associated tension at the DSSD slant part connection Mar-5 th 2013 B2GM KEK S. Uozumi (KNU), T. Tsuboyama, N. Sato (KEK)
SVD Slow Control Markus Friedl (HEPHY Vienna) DAQ/SC Kickoff Meeting, 8 November 2012.
Silicon Vertex Detector Schedule 23 July 2012 Christian Irmler (HEPHY Vienna) 12 th Open Meeting of the Belle II Collaboration.
8 September 2011 Belle II SVD/PXD Installation Procedure Mockup Meeting Munich Immanuel Gfall (HEPHY Vienna)
Florian Buchsteiner (HEPHY Vienna)
9 September 2015 VXD Mechanics Summary Markus Friedl (HEPHY Vienna)
SVD FADC SVD-PXD Göttingen, 25 September 2012
SVD Electronics Constraints
Markus Friedl (HEPHY Vienna)
Update on the SVD construction
Christoph Schwanda (HEPHY Vienna) For the Belle II SVD group
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Discussion items SVD mechanics session.
Cooling pipes and Space for Services
Vertex Detector Mechanical R&D Design Questions and Issues
BPAC, 17 October 2017 VXD GND/EMC Markus Friedl (HEPHY Vienna)
C. Irmler, M. Friedl, M. Pernicka HEPHY Vienna
Presentation transcript:

Comments to the SVD4 structure 8 June 2009 Toru Tsuboyama Slides from M.Friedl, T.Bergauer, C. Irmler, P. Valentine, T. Tsuboyama

Sensor with slant layers 8 July 2009 T. Tsuboyama (KEK)

APV25 distribution 8 July 2009 T. Tsuboyama (KEK)

Sensors and APV chips Layer # Ladders Rect. Sensors [50μm] [75μm] Wedge Sensors APVs 6 17 68 850 5 14 42 560 4 10 20 300 3 8 16 192 Sum: 49 130 41 1902 Unit Cost: 2k€ 400€ NRE Cost: 40k€ Total Cost: 72k€ 300k€ 122k€ 761k€ Total: 1255k€ (1.7oku¥) 8 July 2009 T. Tsuboyama (KEK)

Comparison FADC cards SVD1 SVD2 SVD4 Ladders 8+10+14=32 6+12+18+18=54 8+10+14+17=49 DSSD sensors 8*2+10*3+14*4=102 6*2+12*3+18*5+18*6=246 8*2+10*3+14*4+17*5=187 Hybrids 32*4=128 54*4=216 187 Readout chips VA1 (128*5=640) VA1TA (216*4=864) APV25 (1902) Number of hybrid cables 128 216 8*4+10*(4+1)+14*(4+2)+17*(4+3)=285 (Max) Repeater 4+4=8 (DOCK) 5+5=10 (DOCK) Not decided Cooling Dock+Endring Dock+Endring+Ladder FADC cards 32 (4 Hybrids1 FADC) 36 (24 VA1  1 FADC) 119 (16 APV25  1 FADC) 8 July 2009 T. Tsuboyama (KEK)

SVD1/SVD2 sensors were made from 4” wafers. Why Number of sensors is smaller? Answer:Sensors are made from 6” wafer SVD1/SVD2 sensors were made from 4” wafers. 8 July 2009 T. Tsuboyama (KEK)

Origami concept Chip-on-sensor concept for double-sided readout Flex fan-out pieces wrapped to opposite side (hence “Origami“) All chips aligned on one side  single cooling pipe Side View (below) 8 July 2009 T. Tsuboyama (KEK) 26 June2009

Ladder shape (side view) First sketch (to scale) of outermost ladder Zylon rib Cooling pipe Nanonics connectors Flex circuits Cooling block (end ring) 8 July 2009 T. Tsuboyama (KEK) 26 June2009

Expanded view Rib Cooling tube APV25 chips Flex for bottom side signal readout Rohacel DSSD Normal hybrids Kapton flex Nanonics Connectors Support parts 8 July 2009 T. Tsuboyama (KEK) 26 June2009

Disassembled Zylon rib APV25 chips (100µm=thin) Cooling pipe Rohacell APV25 chips (300µm=thick) TPG Nanonics connectors Flex circuits T. Tsuboyama (KEK) 8 July 2009

Water tube not necessary in L3 T. Tsuboyama (KEK) 8 July 2009

Comments by S. Koike and N. Sato I consulted KEK engineers, S. Koike and N. Sato, who designed and constructed SVD 1 and SVD 2 and asked their general idea of the SVD structure. 8 July 2009 T. Tsuboyama (KEK)

Ribs and cooling pipe The combination of a Zylon rib and a cooling pipe is not appropriate for stable structure Temperature dependence may be large Precision of pipe-bending is not that good. 8 July 2009 T. Tsuboyama (KEK)

Two ribs Zylon is extremely strong in expansion. Not strong to the bending force. The following structure is weak in horizontal force 8 July 2009 T. Tsuboyama (KEK)

Two ribs + with roof With appropriate roof, structure will be stiff. 8 July 2009 T. Tsuboyama (KEK)

Is it possible to change ladder structure as follows? The Rohacell layer makes the structure weak. Roof (Zylon or CFRP) Zylon rib 8 July 2009 T. Tsuboyama (KEK)

Ladder mount procedure It must be difficult, if not impossible, to install the last ladder to the support structure. SVD1 / SVD2  Only barrel type sensors. SVD4  Slant sensor complicates the procedure 8 July 2009 T. Tsuboyama (KEK)

Solution Ladder mount is done while support structure is divided to two halves. After ladder mount is completed in left and right halves, they are put together around the beam pipe. Ladder mount procedure becomes much easier. How to keep precision between left-right and forward-backward support structure. 8 July 2009 T. Tsuboyama (KEK)

Summary Exchange of idea of the SVD structure has started. Detail design is still far. 8 July 2009 T. Tsuboyama (KEK)